Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.4 CrAccepted-AOC | ₹97.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹105.6 Cr+₹8.2 Cr (8.39%)Rejected-Finance | ₹105.6 Cr+₹8.2 Cr (8.39%) | L2 | Rejected-Finance L2 |
| 3 | L3₹115.0 Cr+₹17.6 Cr (18.1%)Rejected-Finance | ₹115.0 Cr+₹17.6 Cr (18.1%) | L3 | Rejected-Finance L3 |
| 4 | L4₹118.0 Cr+₹20.6 Cr (21.2%)Rejected-Finance C 102 ANSAL PLAZA HUDCO PLACE KHELGAON MARG NEAR SOUTH EXTENSION NEW DELHI 110049 | ₹118.0 Cr+₹20.6 Cr (21.2%) | L4 | Rejected-Finance L4 |
| 5 | L5₹119.4 Cr+₹22.0 Cr (22.5%)Rejected-Finance | ₹119.4 Cr+₹22.0 Cr (22.5%) | L5 | Rejected-Finance L5 |
Tender Value
₹124.9 Cr
EMD Value
₹2.5 Cr
Closing Date
29 Jul 2025, 5:00 pmClosed
GM PROJECT
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Flatted Factory at Sector 28Yamuna Expressway Industrial Development Authority on EPC Basis
2025_YEIDA_1046197_1
YEA/GM(PROJECT)/2025/315 DT-21/05/2025
Open Tender
Civil Works
Fixed-rate
730 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
REFER ETENDER DOC
3 documents required · 3 mandatory
₹12,980
₹2.5 Cr
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
30 Jan 2026
6 Jun 2025
31 Jul 2025
6 Jun 2025
29 Jul 2025
6 Jun 2025
6 Jun 2025 - 11 Jun 2025
13 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction and Maintenance during Defect LS Liability Period of, but not limited to Flatted Factory Complex with Flatted Factory Building & Ancillary facilities (with approximate built up area of 38,665 sqm) on a site area of around 20160 sqm (5.0) acres approximately, along with boundary wall, gates, landscaping, site development, complete external and internal and external MEP services, Area development works and Ancillary Buildings (Substation, UG Tank and Pump room, OHT, HT Meter room) including supply of all labour, materials, equipment, facilities and handing over all assets with SOP for maintenance including standard norms of documentation, testing, commissioning complete in all respects alongwith all Statutory approvals to occupy and operate the complexes on EPC basis | 1 | Job | 1,24,90,48,596.81 | ₹1,24,90,48,596.81 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1899869.xls
BOQ • 0.24 MB
172495318.pdf
Tender Documents • 0.82 MB
172495321.html
Tender Documents • 0.06 MB
173842750.pdf
Tender Documents • 0.24 MB
174520420.pdf
Tender Documents • 0.33 MB
175361516.pdf
Tender Documents • 0.28 MB
2.rar
Tender Documents • 38.79 MB
ffactory.pdf
Tender Documents • 17.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .