Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 84 1A 3RD FLOOR TRINITY PLAZA TOPSIA ROAD SOUTH TOPSIA KOLKATA WEST BENGAL 700046 | KOLKATA | WEST BENGAL | 700046 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
1 Oct 2022, 2:00 pmClosed
AGM CNM
APCPL JHARLI JHAJJAR HARYANA 124141
Complete Assembly Coal Decanted Water Pump RH12TC II
2022_APCPL_127654_1
100000548
Limited
Machinery and Machining Tools
Supply
90 days
APCPL JHARLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
21 Oct 2022
2 Sept 2022
3 Oct 2022
2 Sept 2022
1 Oct 2022
2 Sept 2022
RH12TC-II:COMPLETE ASSY
RH12TC-II:BASKET STRAINER
RH12TC-II:SUCTION BELL CAP
RH12TC-II:SUCTION BELL
RH12TC-II:BEARING (FOR SUCTION BELL)
RH12TC-II:SAND COLLAR
RH12TC-II:IMPELLER SEAL RING
RH12TC-II:IMPELLER
RH12TC-II:IMPELLER LOCK COLLET
RH12TC-II:BEARING(FOR INTER BOWL)
RH12TC-II:DISCHARGE CASE BEARING
RH12TC-II:DISCHARGE CASE
RH12TC-II:PUMP SHAFT
RH12TC-II:SCREW BEARING (FOR DISCH CASE)
RH12TC-II:TUBING ADAPTER
RH12TC-II: SCREW BEARING (FOR TUB ADAPT)
RH12TC-II:BOTTOM COLUMN PIPE
RH12TC-II:SHAFT COUPLING
RH12TC-II:SHAFT TUBE
RH12TC-II:TUBE STABILIZER
RH12TC-II:TOP COLUMN PIPE
RH12TC-II:HEAD SHAFT
RH12TC-II:TUBE TENSION NIPPLE
RH12TC-II:WATER DEFLECTOR
RH12TC-II:ADJUSTING NUT
RH12TC-II:BEARING(FOR T T NUT)
RH12TC-II:THRUST BRG. HOUS. ASSY.
RH12TC-II:FLEXIBLE COUPLING
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .