Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-Finance ADOT JOGIA BARI JADAL PUR MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | ₹18.5 L | L1 | Accepted-Finance RATE |
| 2 | L2₹20.7 LRejected-Finance UTTAR PRADESH UP | BALRAMPUR | UTTAR PRADESH | 271201 | ₹20.7 L | L2 | Rejected-Finance RATE |
Tender Value
₹25.5 L
EMD Value
₹2.5 L
Closing Date
8 May 2026, 12:00 pmClosed
EE CD2 MIRZAPUR
EE CD2 MIRZAPUR
PANTOON
2026_CEMRZ_1143602_1
1117/2A dt 04-04-2026
Open Tender
Civil Works
90 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
Yes
₹2.5 L
Yes
EE CD2 MIRZAPUR
13 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. DSR No 2.8.1 All kinds of soil. | 65 | Cum | 195 | ₹12,675 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement: 4 coarse sand 8 graded stone aggregate 40 mm nominal size As Per DSR No 4.1.8 | 5 | Cum | 5,109 | ₹25,545 |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, As per DSR No 5.3 | 52 | Cum | 8,053 | ₹4,18,756 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. As per DSR NO 5.22.1 | 6,217.2 | Qtl | 80 | ₹4,97,376 |
| 5 | Hire charges of motar boat (for protection in flood period) | 48 | Nos | 3,388 | ₹1,62,624 |
| 6 | Supply of labours | 2,480 | Nos | 425 | ₹10,54,000 |
| 7 | Supply of Small Boat including cost of Mallah | 295 | Nos | 396 | ₹1,16,820 |
| 8 | Supply of PP Rope | 480 | Nos | 201 | ₹96,480 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_2136310.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid