Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC | ₹34.7 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹35.7 L+₹1.0 L (2.91%)Rejected-Finance | ₹35.7 L+₹1.0 L (2.91%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹38.6 L+₹3.9 L (11.1%)Rejected-Finance | ₹38.6 L+₹3.9 L (11.1%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹39.1 L+₹4.4 L (12.7%)Rejected-Finance | ₹39.1 L+₹4.4 L (12.7%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹42.0 L+₹7.3 L (21.0%)Rejected-Finance | ₹42.0 L+₹7.3 L (21.0%) | L5 | Rejected-Finance Not L1 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
29 Mar 2023, 3:45 pmClosed
Sr Manager-CnM,USSC-CPG-2
CnM,USSC-CPG-2 Sipat Super Thermal Power Proj PO Ujwal Nagar District Bilaspur 495555
Works Contract AMC OF OPERATION AN MAINTENANCE OF WATER SUPPLY SYSTEM FOR 12 TWELVE) MONTHS IN TOWNSHIP AREA AT NSTPS(3X660 MW)
2023_NTPC_74779_1
NTPC/USSC-CPG2/9900256150
Limited
Miscellaneous Works
Works
365 days
NTPC Nabinagar STPS, Dist- Aurangabad
2 documents required · 2 mandatory
₹0
₹50,000
21 Jun 2023
22 Mar 2023
30 Mar 2023
22 Mar 2023
29 Mar 2023
22 Mar 2023
22 Mar 2023 - 27 Mar 2023
Amount
Operation & Maintenance of water supply
RAMA SHANKAR ENGINEERING PRIVATE LIMITED
M/S NEW PRABHAT CONSTRUCTION
URMILA KUNWAR
M/S ANIL CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .