Tender Value
₹8.7 Cr
EMD Value
₹17.3 L
Closing Date
26 Jun 2026, 3:00 pm
Guntakal Division- Gudur-Renigunta-Tirupati Doubling-Proposed construction of platform No.6&7, Extension of Platform No.4&5, VIP siding platform under Non interlocked working period of Renigunta yard and construction of C&W office building at Renigunta station
32-CAO-C-SC-2026
32-CAO-C-SC-2026
Open
4 Months
Tirupati, Andhra Pradesh
₹0
₹17.3 L
30 May 2026
30 May 2026
12 Jun 2026
Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, 1 mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall b e made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ1
Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, 2 mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall b e made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ2 Above/
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
DETAILSOFPERSONNEL,PLANTANDMACHINERYWORKSONHANDFORMATS.pdf
ATTACHMENT
EMPLOYMNTOFRETIREDRAILWAYOFFICERSCERTIFICATEFORMAT.pdf
ATTACHMENT
FormatforBankGuarantee11.10.2019ver-2.pdf
ATTACHMENT
SpecialConditions-Measurementofworksbycontractor28.08.21-Ver-1.pdf
ATTACHMENT
work and Concree
ATTACHMENT
NEFT_FORM_GCC_2022.pdf
ATTACHMENT
AFFIDAVIT_ANNEXURE-Vwith_ACS-4_GCC-2022.pdf
ATTACHMENT
PublicProcurementPolicy19.07.2024.pdf
ATTACHMENT
milestone.pdf
ATTACHMENT
SPECIALCONDITIONS-TECHNICALforEarthworkandConcreteworks18.08.21ver1.pdf
ATTACHMENT
SplconsTechnicalforBldgsworksPFworksWorkshopsFOB-COPworks.-25.03.21Ver3.pdf
ATTACHMENT
AP_SPECIAL_CONDITIONS_GENERALlatest.pdf
ATTACHMENT
IRGCC-2022-uptoACS-11updated-13.03.2026.pdf
ATTACHMENT
BG_format_for_BID_SECURITYGCC-2022_1.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures-1.pdf
ATTACHMENT
Download all tender documents and submit your bid