Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,912
Closing Date
20 Jul 2026, 6:00 pm
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Construction of R/Wall and Iron Fencing at Shiv Mandir Gagal Pyt Tantna Block Gundna (PRIs Grant)
2026_RDPR_315127_29
e-NIT No 18 of REW Doda 2026-27 Dated.08.07.2026
Open Tender
Civil Works
30 days
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹2,912
8 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 11.71 | Cum | 592.9 | ₹6,942.86 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.02 | Cum | 4,826.5 | ₹4,923.03 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.35 | Cum | 5,733.6 | ₹24,941.16 |
| 0.0 | Dumping stone including cost of stones. in Horizontal on level | 2.45 | Cum | 1,237.9 | ₹3,032.86 |
| 0.0 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 26.22 | Cum | 2,793.8 | ₹73,253.44 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 4.85 | Sqm | 286.35 | ₹1,388.8 |
| 0.0 | Carriage of Sand and Bajri | 5.83 | Cum | 1,988.02 | ₹11,590.16 |
| 0.0 | Carriage of Stone | 21.51 | Cum | 698.68 | ₹15,028.61 |
| 0.0 | CIB (citizen information Board ) size 2'6"x3'6"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job) | 1 | Nos | 4,500 | ₹4,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1021393.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid