Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-Finance | ₹31.3 L | L1 | Accepted-Finance As per BOQ generated |
| 2 | L2₹32.3 LAccepted-Finance | ₹32.3 L | L2 | Accepted-Finance As per BOQ generated |
| 3 | L3₹35.7 LAccepted-Finance R O DURBUK | ₹35.7 L | L3 | Accepted-Finance As per BOQ generated |
| 4 | L4₹37.4 LAccepted-Finance | ₹37.4 L | L4 | Accepted-Finance As per BOQ generated |
| 5 | L5₹38.6 LAccepted-Finance | ₹38.6 L | L5 | Accepted-Finance As per BOQ generated |
Tender Value
₹57.6 L
EMD Value
₹1.4 L
Closing Date
7 May 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal at Tsaga Gangles- Village Tsaga.( by way of earth work in excavation, PCC Channel in M-10 mix and Crate bundh.(Under capex )
2026_PWD_18816_2
03 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
90 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹2,000
Payable To Executive Engineer InFC division Leh
₹1.4 L
9 May 2026
21 Apr 2026
9 May 2026
21 Apr 2026
7 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. A. All kinds of soil 90% | 1,579.19 | Cum | - | - | item 01 |
| 2 | B. Ordinary rock 10%. | 175.47 | Cum | - | - | item 02 |
| 3 | Dumping stone including cost of stones.in horizontal level. | 109.5 | Cum | - | - | item 03 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 73 | Cum | - | - | item 04 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | 321.2 | Cum | - | - | item 05 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :
A. Foundations, footings, bases for columns | 438.6 | Sqm | - | - | item 06 |
| 7 | B. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 1,752.48 | Sqm | - | - | item 07 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1,052.79 | Cum | - | - | item 08 |
| 9 | Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wirecrates | 167.65 | Cum | - | - | item 09 |
| 10 | Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials | 78.26 | Sqm | - | - | item 10 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_44956.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid