Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.0 L+₹59,852.81 (13.6%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.2 L+₹79,370.03 (18.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.5 L+₹1.1 L (25.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.7 L
EMD Value
₹13,340
Closing Date
20 Aug 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
HALL NO. 4, 1ST BLOCK MINI SECTT., KISHTWAR
REFER BOQ
2026_RDPR_319332_2
e-NIT No 77 of REW KISHTWAR 2026-27 Dated. 01.08.2026
Open Tender
Civil Works
Percentage
45 days
KISHTWAR
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹13,340
Yes
3 Sept 2026
4 Aug 2026
21 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides | 59.7 | cum | 479.3 | ₹28,614.21 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 17.16 | sqm | 286.35 | ₹4,913.77 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) in steps. | 66.4 | cum | 5,733.6 | ₹3,80,711.04 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5coarse sand :10 graded stone aggregate 40 mm nominal size) in steps. | 2.14 | cum | 4,826.5 | ₹10,328.71 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.2 Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 171.6 | sqm | 628.95 | ₹1,07,927.82 |
| 6 | Providing and fixing PVC soil waste / rain water disposal pipe 75mm dia for weep holes | 15 | m | 226.85 | ₹3,402.75 |
| 7 | Back filling of stones | 19.3 | cum | 937 | ₹18,084.1 |
| 8 | Carriage of Stone at an average Distance 500m M by H/L | 30.52 | cum | 698.68 | ₹21,323.71 |
| 9 | Carriage of sand 40 km by M/T and avg 200 mtr. by H/L | 32.22 | cum | 962.48 | ₹31,011.11 |
| 10 | Carraige of aggregate 15 km by MT and 200m HL | 61.01 | cum | 676.23 | ₹41,256.79 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1057223.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .