Loading…
Loading…
Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
10 Jun 2026, 2:00 pm5d left
EXECUTIVE ENGINEER (W/S) , GRWW
KOLKATA MUNICIPAL CORPORATION OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
STRENGTHENING OF TWO NOS 600MM DIA PSC SOCKET JOINT BY MS PLATE IN DIFFRENT LOCATIONS ON HIDE ROAD UNDER GRWW
2026_KMC_1025475_1
EEWS/KMC/GRWW/25-26/149
Open Tender
MECHANICAL
7 days
ON HIDE ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,500
26 May 2026
26 May 2026
12 Jun 2026
26 May 2026
10 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | 31.5 | CUBIC METER PERCENT | 119.27 | ₹3,757 | item1 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 0.2 | CUBIC METER PERCENT | 192.38 | ₹38.46 | item2 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth
beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. | 19.95 | CUBIC METER PERCENT | 234.7 | ₹4,682.26 | item3 |
| 4 | Hire and labour charges for shoring
work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with
supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in
charge).(a) Depth upto 1.5 m. | 39 | SQUARE METER | 386 | ₹15,054 | item4 |
| 5 | Hire and labour charges for shoring
work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with
supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in
charge)(b) For additional depth
beyond 1.5 m. and upto 3.00 m | 0.6 | SQUARE METER | 439 | ₹263.4 | item5 |
| 6 | Hire and labour charges for shoring
work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with
supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in
charge)(c) For additional depth beyond 3.00 m. | 1 | SQUARE METER | 498 | ₹497.5 | item6 |
| 7 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. | 32 | METER | 178 | ₹5,696 | item7 |
| 8 | Sealing of uneven gap in PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite packing
(AMP-32) including supplying. Fitting and fixing all complete.. | 47.1 | METER | 870 | ₹40,977 | item7 |
| 9 | Welding in M.S.structural work with gas or electric: (a) Tack weld | 500 | POINT | 9 | ₹4,500 | item7 |
| 10 | Welding in M.S.structural work with gas or electric: (B) Continuous Weld | 5,846.8 | PER CM RUNNING | 9 | ₹52,621.2 | item7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
Tendernotice_2.pdf
PDF • 0.64 MB
TBID149.pdf
Tender Documents • 0.56 MB
BOQ_2519882.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid