Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC Work order issued |
| 2 | L1₹11.9 LRejected-Finance | ₹11.9 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 3 | L1₹11.9 LRejected-Finance GSTIN: 21ABUPL0669HIZHPARAMACHANDRA PON MN 24 POR BHANJ PUR PS BARIPADA DIST MAYURBHANJ | ₹11.9 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 4 | L1₹11.9 LRejected-Finance GSTIN: 21AFNPB8985MIZW, 21AHKPB3793J1ZD, 21AJFPB3896B2ZP, 21APQPB9658E1ZT, 21BIPPN8618K1ZA, 21BOFPB2283G1ZI, 21CABPB4230L1ZCAT MAHAPATRABALANDA PO MAHAPATRABALANDA PS MAHULPALI DIST SAMBALPUR PIN 768228 | SAMBALPUR | ODISHA | 768228 | ₹11.9 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 5 | L1₹11.9 LRejected-Finance GSTIN: 21BDVPC7114C1Z0AT BELEAM PO BADASAHI PS BADASAHI DIST MAYURBHANJA | BALESHWAR | ODISHA | 756028 | ₹11.9 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
Tender Value
Refer Docs
EMD Value
₹11,900
Closing Date
5 Mar 2026, 5:00 pmClosed
SE Mayurbhanj (R and B) Division Baripada
O/o the SE Mayurbhanj (R and B) Division Baripada
Improvement to SNKUBM Road (SH-19) such as laying SDBC in left side approach of H.L Bridge from chainage 87/000 km to 87/120 km and Right side Approach of H.L Bridge from Chainage 87/420 km to 87/610 km for the year 2025-26
2026_EICCL_126223_2
Bid Id No. SE- 80/2025-26
Open Tender
Civil Works - Roads
30 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,900
Yes
7 Apr 2026
19 Feb 2026
6 Mar 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
Clearing the existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying semi dense bitumenous concrete with 100 - 120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bitumenous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control rolling with smooth wheeled, vibratory and tanden rollers etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
dtcn3.pdf
Tender Documents • 4.84 MB
BOQ_581847.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid