| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC NO 5 MOOGAMBIGAI NAGAR MANOJIPATTI ROAD M C POST THANJAVUR 613004 | THANJAVUR | TAMIL NADU | 613004 | ₹3.4 Cr Quoted ₹3.6 Cr | L1 | Accepted-AOC Lowest bidder accepted after Negotiation |
| 2 | L2₹3.6 Cr+₹8.1 L (2.26%)Rejected-AOC NO 41 21 PERAMBUR BARRACKS ROAD PATTALAM CHENNAI 12 | 12 | ₹3.6 Cr+₹8.1 L (2.26%) | L2 | Rejected-AOC Other than the lowest bidder not accepted. |
| 3 | L3₹3.8 Cr+₹28.4 L (7.96%)Rejected-AOC NO 6 6 PERIYA SENGODAMPALAYAM THINDAL POST ERODE 638012 | ERODE | TAMIL NADU | 638012 | ₹3.8 Cr+₹28.4 L (7.96%) | L3 | Rejected-AOC Other than the lowest bidder not accepted. |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
28 Aug 2024, 12:00 pmClosed
Superintending Engineer
Superintending Engineer, PWD, Planning and Design Circle, Chepauk, Chennai-05.
Conservation Renovation and Restoration of portion of Sivaji Rajah Bhonsle (Sardar Mahal Palace) Residence Heritage building in Thanjavur palace at Thanjavur.
2024_PWD_471905_1
10/PAD/2024-25
Open Tender
Civil Works - Buildings
Lump-sum
365 days
Thanjavur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3.4 L
Yes
16 Dec 2024
10 Aug 2024
28 Aug 2024
10 Aug 2024
28 Aug 2024
10 Aug 2024
Amount
Removing the existing vegetation growth in the Building by way of uprooting the plants manually and then drilling with power driller up to the root depth of plants obtain a clean and neat drill so as to continuously inspect and remove left over roots of vegetation growths and to inject pesticides into the holes so as to prevent further growth of vegetation in the future to safeguard the country old heritage building etc. The cost including the cost of pesticides used, hire charges of injecting machine for injecting chemicals, cost of tools and all labour charges, etc., complete and complying with standard specification and as directed by the departmental officers.
Small Plants
Medium Plants
Big Plants
Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers.
For initial 3m height
For every additional 2.50m height
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
Dismantling the damaged AC sheets roofing over the ground and first floor of District court and Munsif court and conveying the same to the ground level for disposal etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling and clearing away carefully and stacking materials useful for reuse of fire affected and Cracked Madras terrace roof of approximately 31cm thick and conveying the debris from inside to outside etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling (carefully removing) the cracked/ dislodged brick wall of the building and to dispose debris etc complete complying with standard specification and as directed by the departmental officers.
Removal of damaged wooden doors and windows and clearing away carefully and stacking materials useful for reuse without causing any damage to the existing ancient brick masonry wall including carefully removing brick corners of doors and windows etc complete complying with standard specification and as directed by the departmental officers.
Carefully removing and clearing away carefully and reuse of the decayed wooden beam/joist/girder in Madras terrace roofing in all floors by carefully dislodging at ends and top including making necessary notches or openings in the wall on either side of joist, beam to enable it removed etc., complete complying with standard specification and as directed by the departmental officers.
Removal of the existing detoriated lime plastering over the wall, arches, domes and special type of ceiling of Madras terraced type roof carefully without disturbing or damaging the rafters, etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of damaged and undulated flooring and conveying debries from all floors to ground level outside the building etc., complete complying with standard specification and as directed by the departmental officers.
Strengthening the existing walls by providing grouting by formation of two holes of size 1" with required intervals - depth of 300mm for an area of 1 sq.m and depending upon the site conditions injecting lime slurry consisting of lime mortar 1:2 (one lime and two of sand) using Pollachi lime in all floors added with grouting admixture by 2% weight of lime, by using required equipment and the rate includes the cost of all materials, labour charges etc., complete complying with standard specification and as directed by the departmental officers.
Racking out the brick joints of walls, arches, etc.,to a depth of approximately 5cm for a wall thickness of 45cm and above to remove the dead mortar in between the brick joints and cleaning the surface with coir brush and washed with pure water etc complete complying with standard specification and as directed by the departmental officers.
Grouting and stiching the wide cracks at roof (Madras Terrace Roof ) using lime mortar 1:2 with pot pieces for filling up the cracks and the voids, creivices and gap etc.shall be completely sealed with necessary grouting pump. This pressure pump is to be used after cleaning the cracks, washing etc., and then the cracks are grouted with lime mortar 1:2 and it is allowed to be cured till final setting of lime mortar before taking up further leak proof treatment work.
Easing and repairing hanging doors, window shutters and refixing the same after attending the petty repairs including fixing furniture fittings and excluding cost of furniture fittings etc., complete complying with standard specification and as directed by the departmental officers.
Clean removal of saline action over the stone pillars, brick walls etc., with paper pulp treatment by using floating paper, deionized water, plastic bucket, coir , brush etc., complete complying with standard specifications as per directed by the departmental officers
Labour charges for removing painting in teakwood joists,doors,windows etc.,complete complying with standard specification an as directed by the departmental officers.
Reconstruction of brick masonry wall with similar type of bricks in lime mortar 1:2 (one lime two sand) using wire cut brick of size 9"x4"x3" (Specially manufacturing) and using Pollachi lime in all floors as per traditional preparation and documented type construction such as arches and lintels, walls, etc., complete complying with standard specification and as directed by the departmental officers.
For Ground Floor Only
Renewing and fixing teakwood panelled shutters openable type for Doors by using well seasoned teakwood of superior quality and approved variety as per the original design and pattern instructed by the Engineer In Charge.The door shutter is made with two number of 120mm x 40mm size vertical styles, toprail, lock rails and bottom rail of size 125mm x 40mm , 250mm x 40mm, 170mm x 40mm respectively.The door shutter panels is covered with teakwood planks of 25mm thick including all necessary fittings brass/ steel hardwares like screws, nails, hinges, hooks, tower bolts, handles, aldrops of same design, size and weight,etc., complete. Item to also include making all the mouldings and design of the panels as in the existing evidence. Item to include complete finishing of the shutters as directed by the departmental officers. (The rate inclusive of cost of all teakwood materials, labour wrought and putup of door frames and shutters , cost of all furniture fittings, labour charges for fixing in position etc., complete complying with standard specifications (two leaves).
Renewing and fixing of panelled window openable type by using well seasoned teakwood of superior quality as per the original design and pattern instructed by the Engineer In Charge. The window shutter is made with two number of 75mm x 35mm size vertical styles, top rail, respectively. The window shutter panels is covered with teak wook planks of 35mm thick including all necessary fittings brass/ steel hardwares like screws, nails, hinges, hooks, tower bolts, handles, aldrops of same design, size and weight,etc Item to also include making all the mouldings and design of the panels as in the existing evidence. Item to include complete finishing of the shutters as directed by the departmental officers.(The rate inclusive of cost of all teakwood materials, labour wrought and putup of door shutters, cost of all furniture fittings, labour charges for fixing the shutters in position etc., complete complying with standard specifications)
Renewing and fixing of glazed ventilator with new Teak wood glazed ventilator of size 1.20m x 0.60m by using Teak wood scanting thickness of size 0.04m frames fixed with 4mm thick pin headed glass including labour for wrought put up and fixing the ventilator in position with necessary furniture fittings including with neat finishing etc., complete complying with standard specifications and as directed by the departmental officers.
Making , supplying and fixing of new stone capital for replacing the broken and missing stone capital over the high wall at roof level as per existing clues and style etc., complete complying with standard specification and as directed by the departmental officers.
Supply and fixing Teak wood column heritage pattern including all material and labour charges wrought and put up in position and the size and section as per the architural drawings & Specification
Teakwood wrought & putup for joist, beam, rafters and purlins,etc., which are in full length new member placed for supporting the Madras Terrace roof/ Mangalore tiles roof or any other area in all floor as directed by the departmental officers by using well seasoned superior quality and approved variety of teakwood for heritage building work including fixing of iron holdfasts incase of doors, windows and ventilators etc.,and excluding cost of holdfasts and making necessary size holes in the masonry to receive the ends of wooden joists, beams, etc., all fixtures and fastenings etc., complete. Item to include all moulding and chamber to be made as per original design indicated by the Engineer In Charge. (The rate includes the cost of teakwood, labour charges for wrought and putup to the existing clue/design, fixing in position to true alignment and gradient wherever necessary. Complying with standard specifications and as directed by the departmental officers (sample of teakwood to be shown to the Executive Engineer concerned for approval before use on work). Application of Solignum on the wooden surface should also be done. In all floors
Renewing and fixing in position of well seasoned superor quality of Teak wood planks of size 30-45cmx12-25mm to a required length including fixing the planks in the ceiling of Madras Terrace roof and Mangalore tiled roofing or wherever necessary screws, nails, etc., complete complying with standard specification and as directed by the departmental officers.(The rate includes the cost of Teakwood planks, wrought and putup of Teak wood planks, fixing the Teak wood planks and cost of all nails, screws, etc.,)
Redoing of Madras Terrace roof in all floors with one layer of brick on edge course laid as first layer over the existing Teakwood joists, Beams, I Sections, etc., which are placed at roof level in all floors using specially manufactured Terrace bricks for heritage works of size 150mm x 75mm x 25mm in lime mortar 1:1.5 (one lime and one and half sand). The second layer is laid with specially manufactured Terrace bricks for Heritage works of size 150mm x 75mm x 25mm in flat manner in lime mortar 1:2 ( one lime and two sand) 20mm thick as base layer laid over the top of brick on edge course.
Supplying and fixing of best quality and approved variety of ISMB girder of required size and section of make TATA or equivalent of various span fixing below the madras terrace roof to support the roof in the places wherever necessary as directed by the departmental officers and fixed ISMB- grider ‘I’ Section over the bed blocks in the wall including cost of dismantling the brick work wherever necessary for fixing the ‘I’ Section and redoing the same and also the cost of ‘I’ Section labour charges hire charges for welding machineries, hoist for lifting and hire charges for hydraulic manuals Jacky and other allied tools etc., complete including the cost of porting of ISMB- grider ‘I’ section etc and one coat of red oxide primer etc., complete. The I beam has to be supported on brick wall using appropriate blocks so as to support the madras terrace roofing in all the floors etc., complete complying with standard specifications.(The make and brand of the ISMB girder I section should be got approved by the Executive Engineer before use on works).
Laying of roofing with Mangalore tiles over flat tiles set in Lime mortar 1:2 ( one of lime and two of sand) using Pollachi lime in all floors with flat tiles of size 150mm x 150mm x 12mm including Teak wood reepers of size (50mm x 12mm) complete complying with standard specification and as directed by the departmental officers. (The rate includes the cost of all materials like Mangalore tiles, flat tiles, and labour charges for laying of Mangalore tiles with flat tiles roof in position)
Supplying and fixing best quality of Bison cement bonded particle Board 10mm thick including labour charges for fixing the board including painting charges etc. complete complying with standard specification.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Renewing the damaged ornamental cornice around the outer wall cornice portion as per existing style and clues to a height of 0.25m with top and bottom width of 0.28m and 0.08m respectively including removing the brick work and redoing the brick work in lime mortar 1:2 (one of lime and two of sand) and plastering with lime mortar 1:2 (one of lime and two of sand) 30mm thick laid in two layers and finishing with lime mortar 1:1.5 (one lime and one and half sand) 6mm thick (Theeravai) using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Replastering (base plastering) the brick wall, pillars and arches, etc., with lime mortar 1:2 (one of lime and two of sand) to a thickness of 30 mm laid in two layers of 15mm thick using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Applying thin coat of hand grinded lime mortar paste in lime mortar 1:1.5 (one lime and one and half sand) 6mm thick using Pollachi lime in all floors (mix should be with 5.9 kg of jaggery, 2 kg of glue, 1.1 kg of gallnut, 1.4 kg of oakum, 30 nos eggs, 1 litre curd, 3 kg white marble powder, 0.5 kg vajram, 0.06m3 of surki, (for 10 sq.m area) of mugal plastering (Theervai) over the newly plastered surface as per the existing clues (including finishing the surface with smoothness) `etc., complete complying with standard specification and as directed by the departmental officers.
Replastering the ceiling, etc., with Lime mortar 1:1.5 (one Lime and one and half sand), 20mm thick using Pollachi lime in all floors including labour charges, etc., complete complying with standard specifications as directed by the departmental officers.
Revarnishing with old / new wood work with two coats of best melamine varnish of approved quality and brand including preparation of surface etc., in all floors The rate is inclusive the cost of all material, labour charges and finishing neatly etc., complete complying with standard specification and as directed by the departmental officers.
Painting wood work with two finishing coats of synthetic enamel ready mixed paint of good quality and approved variety and colour over one coat priming coat in all floors including the cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification..
Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Laying Brick jelly lime concrete in lime mortar 1:2 ( One lime and two brick jelly ) (no sand to be added) using 20 mm gauge brick jelly for foundation, flooring including dewatering wherever necessary and laid in layers well rammed, consolidated etc., complete complying with standard specification and as directed by the departmental officers.
Paving the floor with best quality Matt Finish Heritage pattern Special Design Tiles of size 600x600x10 mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three M-sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be Johnson / Kajaria / Somany / Nitco / RAK which has to be got approved by Executive Engineer before use on works)
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18/ 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Construction of mortar pit of size 0.90x0.45m with necessary earth work excavation of sand filling 15cm thick, PCC 1:5:10, 8cm thick brick partition wall 11.50cm thick to a height of 60cm with plastering 1:5, 12mm thick on both sides etc complying with standard specification and as directed by the departmental officers.
Providing pest control with antitermite treatment in all floors by drilling holes at junction of walls with floors at 300mm intervals and injecting chemical emulsion on those with cement etc. making holes along the vertical surface outside the walls at 150mm intervals to the depth of 450mm pointing chemical emulsion into the holes and closing holes with chemical etc. spraying all surface of treatment is to be done as per IS code no:5313/ Part III 1981 with approved chemical.(The chemical is to be used on the work should be got approved by the Executive Engineer before use on work) etc., complete complying with standard specification and as directed by the departmental officers.
Conveying the debris,dismantled materials from the campus and conveying away the same to outside by lorry to a lead of 3km entirely within the city limit including loading and unloading charges and dumping in low lying areas and levelling neatly etc.,complete complying with standard specification
Grouting of the masonry cracks by using lime based slurries (slaked lime & fine sand (<1400 microns)) with pozzolonic additives (0.5% polymer fluidiser) including cost of Killick Nixon low pressure grout pump & nipples (inserting nozzles and low pressure pumping to consolidate the walls) complete complying with standard specification and as directed by the departmental officers.
Stitching of cracks using stone lintels (1200x600x16 to 18mm) for the cracks in the masonry walls as specified including making groove, cutting and inserting stone slab, packing with mortar and making good the masonry work etc., complete complying with standard specification and as directed by the departmental officers.
Stitching of cracks using 12mm dia. and 2’ long SS‐rods . The rods should be applied with a layer of anti‐corrosive paint, the ends of the rod to be bent at 6’’ each then to be inserted into the masonry after drilling a hole and making a 1/2" groove in the masonry, packing with lime mortar and making good the masonry etc., complete complying with standard specification and as directed by the departmental officers.
P MANICKAM AND CO (BID ID -1121126)
K SARASWATHI AND CO (BID ID -1121607)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_560659.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .