Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-AOC 28 NARESH MITRA SARANI KOLKATA 25 | KOLKATA | KOLKATA | WEST BENGAL | 700025 | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.4 L+₹1,400.86 (1.00%)Rejected-Finance 29 GOBRA GORISTHAN ROAD KOLKATA 700046 | KOLKATA | KOLKATA | WEST BENGAL | 700046 | 2 | Rejected-Finance L2 | |
| 3 | 3₹1.4 L+₹4,188.58 (2.99%)Rejected-Finance 418 KALITALA PARK KOLKATA KOLKATA KOLKATA 700070 | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | 3 | Rejected-Finance L3 |
Tender Value
₹1.4 L
EMD Value
₹2,820
Closing Date
27 Mar 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE WS BPS
KALIGHAT BOOSTER PUMPING STATION S.P.MUKHERJEE ROAD KOLKATA-700026
RESTORATION OF DAMAGED METALLIC STAIR CASE AND GRILL GATES WITH HEIGHT EXTENSION STATION DISPLAY BOARD ON THE MAIN ENTRANCE AT SIRITY BPS
2026_KMC_1019447_1
KMC/WS/SBPS/2025-26/13
Open Tender
MECHANICAL
Percentage
15 days
SIRITY BOOSTER PUMPING STATION
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,820
2 Nov 2026
13 Mar 2026
30 Mar 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge
of all tools and plants and labour required for the work including all
incidental chages such as electricity charges, labour insurance
charges etc. Payment to be made on the basis of calculated weight of
structural members only in finished work as per IS specified weight.
Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and noseperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. II) For Structural Works in Roof Trusses etc. using joists, channels and angles of specified section weighing less than 22.5 kg/ m | 0.62 | MT | 60,276 | ₹37,280.71 |
| 2 | Gas cutting of M.S. pipes and/or M.S.plates of different thikness all
complete as per specification and direction of the Engineer-in-charge. | 48.16 | MTR | 100 | ₹4,816 |
| 3 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,
GATES ETC. B. REPAIRING 2. Welding in M.S. structural work with
gas or electric: (b) Continuous weld. | 4,816 | PER CM RUNNING | 9 | ₹43,344 |
| 4 | SECTION 1. ------------BUILDING WORKS (K) PAINTING,
VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on
steel or other metal surface with synthetic oil bound primer of
approved quality including smoothening surfaces by sand papering
etc (This item is applicable to new work or old work when the original
surface has been exposed by removal of old paint.) | 155.24 | SQM | 29 | ₹4,501.82 |
| 5 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A)
ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel
paint of approved make and brand including smoothening surface by
sand papering etc. including using of approved putty etc. on the
surface, if necessary :(b) On steel or other metal surface : With other
than hi-gloss of approved quality-(iv) Two coats (with any shade
except white) | 155.24 | SQM | 72 | ₹11,176.92 |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of
10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be
applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 50 | EACH | 245 | ₹12,250 |
| 7 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive
of 10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be
applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 7 | EACH | 326 | ₹2,282 |
| 8 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are
exclusive of 10% contractors profit and 1% Labour welfare cess
which would be admissible to the Contractors, but contractual
percentage will not be applicable. (II) The workersemployed on high
rise building or any structure over 30 ft in height and also workers
engaged in Tunnel shall be paid 20% extra wages. | 7 | EACH | 270 | ₹1,890 |
| 9 | Sub Total | - | - | - | - |
| 10 | GST 18% | 1 | NOS | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2505229.xls
BOQ • 0.25 MB
techbid.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .