| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAdmitted-Finance | ₹17.4 L | L1 | Admitted-Finance |
| 2 | L2₹17.4 LAdmitted-Finance | ₹17.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ANNAMALAIYAR CONSTRUCTION L2 | GIRI SAHAJANYA PROJECTS L1 |
|---|---|---|---|---|---|
| 1.00Providing BT Road from Murugesan Polytechnic Pillaiyar Koil to Therku Kadu Church Km 0/0-0/460 H/O Karumapuram Work No.01. | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.KM 0/0-0/460 | 252.18 | m2 | 6.36 ₹1,603.86 | 6.36 ₹1,603.86 |
| 3.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0-0/460 | 28.02 | m3 | 352.07 ₹9,865 | 340.07 ₹9,528.76 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/460 | 265.12 | m3 | 2,449.99 ₹6.5 L | 2,446.99 ₹6.5 L |
| 5.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-0/460 | 1,767.5 | m2 | 86.55 ₹1.5 L | 86.55 ₹1.5 L |
| 6.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-0/460 | 1,767.5 | m2 | 20.26 ₹35,809.55 | 20.26 ₹35,809.55 |
| 7.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the KM 0/0-0/460 | 53.02 | m2 | 11,674.01 ₹6.2 L | 11,674.01 ₹6.2 L |
| 8.00 | Provision for Name cum Information Board including erection charges and painting | 1 | No | 3,000 ₹3,000 | 3,000 ₹3,000 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,64,916 ₹2.6 L | 2,64,712 ₹2.6 L |
Tender Value
Refer Docs
EMD Value
₹17,500
Closing Date
13 Mar 2026, 10:00 amClosed
BDP VP Ayothiyapattnam
BDP VP Ayothiyapattnam
Salem District - Ayothiyapattnam Providing BT Road from Murugesan Polytechnic Pillaiyar Koil to Therku Kadu Church Km 0/0-0/460 H/O Karumapuram in MINES AND MINARALS 2025-2026 Work No.01.
2026_RDTN_671846_1
2507/2025/T2
Open Tender
Civil Works
180 days
BDP VP Ayothiyapattnam
As on below
2 documents required · 2 mandatory
₹0
₹17,500
BDP VP Ayothiyapattnam
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Providing BT Road from Murugesan Polytechnic Pillaiyar Koil to Therku Kadu Church Km 0/0-0/460 H/O Karumapuram Work No.01.
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.KM 0/0-0/460
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0-0/460
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/460
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-0/460
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.KM 0/0-0/460
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the KM 0/0-0/460
Provision for Name cum Information Board including erection charges and painting
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
01.pdf
Tender Documents • 0.49 MB
BOQ_807383.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid