| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC 93 BADANPUR JIND 126152 | JIND | JIND | HARYANA | 126152 | ₹2.0 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹2.1 LRejected-Finance VPO GORAR DISTRICT SONEPAT 131408 | GORAR | SONEPAT | HARYANA | 131408 | ₹2.1 L | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
11 Feb 2026, 5:00 pmClosed
Jagmal
DIV 2 Rohtak
Annual maintenance estimate for Water Supply Scheme in Sector-6, Rohtak for the year 2025-26.
2026_HBC_500566_1
202626E3A81F 39F0 48C4 834F 21A148164BEC267HSV
Open Tender
Civil Works
30 days
Rohtak
As per approved DNIT/NIT/CBD
2 documents required · 2 mandatory
₹250
₹4,000
Yes
24 Feb 2026
4 Feb 2026
12 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
4 Feb 2026 - 6 Feb 2026
[10.61]Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including pointing the joints with white cement and matching pigments etc., complete.
[10.76]Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.
[11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand)
[11.64.1]Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : 1. New work (two or more coats) over and including water thinnable priming coat with cement primer
[11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
[15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 2.1. Mechanical Means Depth up to 3 m
[21.43]Extra over the rate laid down in this schedule for cement concrete work more making and finishing benching and complicated floor work in manholes, including formation of channels and bulldozing and smooth finishing the surface accurately to template.
[30.22]Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
[30.28.1]Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 1. One or more coats on old work
[30.92]Cleaning of under ground sump, Over Head R.C.C. Tank ( independent staging) including disposal of silt and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i)Tank shall be emptied of water by pumping and bottom shall be cleaned of silt and other deposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge.
[5.13]Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_579174.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid