Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹1.4 Cr+₹14.3 L (11.0%)Rejected-Finance | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹1.5 Cr+₹16.7 L (12.8%)Rejected-Finance HAFIZPUR BHAGAT SINGH CHAURAHA SADAR AZAMGARH AZAMGARH UTTAR PRADESH 276001 | AZAMGARH | UTTAR PRADESH | 276001 | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
19 Oct 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
CONSTRUCTION OF 220 KV GANTRY (GTM) AND STRINGING OF ACSR ZEBRA CONDUCTOR ON D.C TOWER OF S/C SAHUPURI-RAJA TALAB LINE FOR FEEDING SUPPLY TO 220 KV SUBSTATION BHADOHI (UNDER CONSTRUCTION).
2020_UPTCL_513435_1
E Tender No. 33/2020-21/ETC/VNS
Open Tender
Electrical Works
Item Wise
100 days
DC Tower of SC Sahupuri-Raja Ka Talab Line
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹11,800
SE, ETC, Varanasi
₹1.4 L
1 Feb 2021
19 Sept 2020
20 Oct 2020
19 Sept 2020
19 Oct 2020
5 Oct 2020
180 days
Amount
Check survey including final peg marking.
Cost of xxcavation of foundation pits including all earth work, back filling and leveling etc.
Cast concreting for Gantry (GTM) foundation including cost of cement, dewatering, shoring, shuttering, forming and curing but excluding cost of reinforcement bar with 1:2:4 mix concrete.
Erection of superstructure of 220 KV towers and Anchor tower and their extension wherever required including all work above ground level excluding hoisting of insulators hardware & accessories but including fitting of danger number, phase plates, bird guard and fixing & punching for 220 KV SC/DC lines.
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 seperatiion of minimum 10mm thickness with 10mm/12mm electrode & application of Zinc rich aluminum paint on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers.
Laying, stringing, tensioning, clamping, jointing etc. of ACSR Zebra conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fittings, Armour rods, vibration dampers etc. on all three phases of 220 KV DC lines
Grounding work including earth work etc. for pipe type grounding including cost of coke & salt.
Installation of steel reinforcement bars in R.C.C. foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc.
Supply
Tower Accessories
Number Plate
Danger Plate
Phase Plate in sets of red, blue and yellow for Tension tower.
Bird Guard for towers
Pipe type earthing material for towers.
Hardwares Suitable for ACSR Zebra Conductor.
Single Suspension fittings
Single Tension fittings
Double Tension fittings
Conductor Accessories Suitable for ACSR Zebra Conductor.
Vibration Damper
Mid Span Compression Joint
Repair Sleeve
Performed Armour Rod
Anchor bolt size 28x750 mm.
Galvanised U bolt 16 mm dia.
Rama Power construction
M/S SHEKHAR ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .