Loading…
Loading…
Tender Value
₹45.5 L
EMD Value
₹91,100
Closing Date
13 Jul 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
GENERAL
28 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
@ 18% GST has been included in schedule rate, GST will be paid to the firm's at the time of billing, subjected to firm's production of sufficient documentary evidence in support of same. NOTE: % of GST as applicable during the period of execution.
Performance Guarantee: As per Indian Railways Standard General Condition of Contract 2022. 16.(4) Performance Guarantee The procedure for obtaining Performance Guarantee is outlined below: (a) The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60th day happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in retender for that work.
(b) The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the original contract value:- (i) A deposit of Cash; (ii)Irrevocable Bank Guarantee; (iii) Insurance Surety Bond as per Annexure XVII (advance Correction Slip No. 9 of IRGCC April 2022) Note: 1. The provision of Insurance Surety Bond shall be for all contract shaving DOC within 36 months only. 2. In case DOC extends beyond 36 months, fresh Insurance Surety Bond or any other from of Performance Guarantee prescribed in GCC for the balance amount shall be submitted by agency, other wise necessary action will be taken asper terms of Agreement., (iv)Government Securities including State Loan Bonds at 5% below the market value; (v) Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (vi) Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vii)Deposit in the Post Office Saving Bank; (viii) Deposit in the National Savings Certificates; (ix)Twelve years National Defence Certificates; (x) Ten years Defence Deposits; (xi) National Defence Bonds and (xii) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted.
(c) The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. Incase, the time for completion of work gets extended the Contractor sha[[ get the validity of P.G. extended to cover such extended time for completion of work plus 60 days.
(d) The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value.
(e) The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily.
(f) Whenever the contract is rescinded, the Performance Guarantee already submitted for the contract shall be encashed.
(g) The Engineer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i) Failure by the Contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii) Failure by the Contractor to pay President of India any amount due, either as agreed by the Contractor or determined under any of the Clauses/Conditions of the Agreement, within 30 days of the service of notice to this effect by Engineer. (iii) The Contract being determined or rescinded under clause 62 of these conditions.
(h) If a tender is accepted on the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by the bidder as below: Bid quoted Below 0% - 5% (inclusive) of advertised cost, Additional Performance Guarantee (%) - NIL. Bid quoted - Below 5% of advertised cost, Additional Performance Guarantee (%) - 5%
Security Deposit: As per Indian Railways Standard General Condition of Contract 2022. 16.(1) Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
Refund of Security Deposit: As per GCC clause 16.(2)(i) Security Deposit mentioned in sub clause (1) above shall be returned to the Contractor along with or after, the following: (a) Final Payment of the Contract as per clause 51. (1) and (b) Execution of Final Supplementary Agreement or Certification by Engineer that Railway has No Claim on Contractor and (c) Maintenance Certificate issued, on expiry of the maintenance period as per clause 50.(1), in case applicable.
Forfeiture of Security Deposit: As per GCC clause 16. (2) (ii) Whenever the contract is rescinded as a whole under clause 62 (1) of these conditions, the Security Deposit already with railways under the contract shall be forfeited. However, in case the contract is rescinded in part or parts under clause 62 (1) of these conditions, the Security Deposit shall not be forfeited.
As per GCC clause 16.(3) No interest shall be payable upon the Bid Security and Security Deposit or amounts payable to the Contractor under the Contract, but Government Securities deposited in terms of Sub-Clause 16.(4)(b) of this clause will be payable with interest accrued thereon.
If the Tenderer(s) deliberately give(s) wrong information/ incorrect documents in his/their tender or create circumstances for the acceptance of his/their tender, or at any stage during currency of contract, the Railway reserves the right to reject such tender at any stage. The entire EMD, PG and Security deposit and any other dues available with Railway against that contract will be forfeited. Action will be taken to suspend the business with the tenderer for a period of one year. In addition, Administration reserves the right to prosecute under suitable law.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere the instructions and directions given at different pages.
Tenderer should watch the website for the corrigendum/ addendum to the NIT/tender document, if any that may be uploaded prior to tender opening (include) as there will not be any separate communication for that.
Supply and installation of cable transit entry sealing & foolproof protection system with multi diameter halogen free EPDM modules to prevent rodent entry into HT compartment of switch board cabinet (SBC) panel of EOG type LHBAC coaches, power cars & pantry cars at Santragachi coaching depot.
Elect-Chg-OT-26-27-Rodent
Elect-Chg-OT-26-27-Rodent
Open
Works - General
3 Months
Howrah, West Bengal
₹0
₹91,100
13 Jul 2026
19 Jun 2026
29 Jun 2026
6 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 24,75,160.6 | ||
| — | 220.00 Per | Coach | — | ||
| Supply, Modification work & fitment / installation of Modular CTS Kit of Disconnecting & Earthing device of LHB AC Coach / PowerCar / Pantry Car. Supply of Kit for Disconnecting and Earthing device consisting of following: i) The Modules with based on Multi-diameter technology should be made of halogen free EPDM (Ethylene Propylene Diene Terpolymer). ii) System must be type tested & certified for the Water / Fire / Gas tightness / Ingress protection confirming to IP 66/67 according to IEC: 60529. iii) Anti Rodent. iv) Vibration confirming to category A, class 1/Cat. 2 according to IEC: 61373. v) Hazard level HL3 according to EN 45545-2 &3. (Third pary inspection cost should be borne by the firm) | — | — | — | 24,75,160.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Corrupto11_compressed.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
ExplanatoryRodent.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .