| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC O 101 PHASE 2 PALLAVPURAM MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹2.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 Cr+₹36.5 L (13.1%)Rejected-Finance B 104 KESAR GARDEN APARTMENT SECTOR 48 NOIDA GAUTAM BUDDH NAGAR | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | ₹3.2 Cr+₹36.5 L (13.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.3 Cr+₹47.5 L (17.0%)Rejected-Finance 6 204 TIKONIYAN BELANGANJ AGRA | AGRA | AGRA | UTTAR PRADESH | ₹3.3 Cr+₹47.5 L (17.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.5 Cr+₹66.7 L (23.9%)Rejected-Finance | ₹3.5 Cr+₹66.7 L (23.9%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/s B.B.Goyal L3 | M/S RAVINDRA CHAUDHARY L1 | UMESH CHANDRA MISHRA L2 | Mukut Bihari Lal Contractor L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in ordinary soil ( loamy clay or sand ) i/c. lift upto 1.5 metre and lead upto 30 metre and i/c. back filling,watering and ramming of excavated earth into trenches and disposal of surplus earth as directed by Engineer-in-charge with cost of labour and T&P etc.required for proper completion of work. | 1,736.33 | Sqm. | 115 ₹1,99,677.95 | 115 ₹1,99,677.95 | 110 ₹1,90,996.3 Lowest | 115 ₹1,99,677.95 |
| 2.00 | Earth work in embankment / filling by power transported earth with a average lead 8.00 km. including excavation, loading,unloading, manual compaction, dressing and all lifts complete excluding royalty required for proper completion of work. | 1,722 | M3 | 306.55 ₹5,27,879.1 | 250 ₹4,30,500 Lowest | 250 ₹4,30,500 Lowest | 306.55 ₹5,27,879.1 |
| 3.00 | Providing & laying 80 mm. thick factory made C.C. Interlocking coloured tiles/paver block including 50mm thick compacted bed of fine sand proper embedding/laying of interlocking tiles leveling and dressing of surface to required level and slope,filling joints with fine sand and below it laying 0.10m. thick base concrete in 1:2:4 with cost of all materials,labour and T&P etc required for proper completion of work. directed by Engineer-in- charge. | 2,118.75 | M2 | 1,851.3 ₹39,22,441.88 | 1,450 ₹30,72,187.5 Lowest | 1,600 ₹33,90,000 | 1,851.3 ₹39,22,441.88 |
| 4.00 | Providing & laying of Cement Concrete in 1:3:6 (1 cement:3 coarse sand:6 stone grit 20-40 mm.size) including cost all materials ,labour and T&P etc. required for proper completion of work. | 98.73 | M³ | 6,242.2 ₹6,16,292.41 | 6,000 ₹5,92,380 Lowest | 6,000 ₹5,92,380 Lowest | 6,242.2 ₹6,16,292.41 |
| 5.00 | Providing & fixing Centering & Shuttering for C.C. Work i/c. rent of shuttering material ,labour and T&P etc. required for proper completion of work. | 357.39 | M2 | 618.1 ₹2,20,902.76 | 600 ₹2,14,434 Lowest | 600 ₹2,14,434 Lowest | 618.1 ₹2,20,902.76 |
| 6.00 | Steel Reinforcement for R.C.C. Work i/c. it's straightening, cutting, bending, binding and placing in position with cost of binding wire i/c cost of all materials, labour and T&P etc. required for proper completion of work. | 31.76 | MT | 78,000 ₹24,77,280 | 68,888 ₹21,87,882.88 Lowest | 75,000 ₹23,82,000 | 79,565 ₹25,26,984.4 |
| 7.00 | Providing & fixing Centering & Shuttering for R.C.C. Work i/c. rent of shuttering material ,labour and T&P etc. required for proper completion of work. | 2,444.15 | M2 | 750 ₹18,33,112.5 | 600 ₹14,66,490 Lowest | 800 ₹19,55,320 | 865.35 ₹21,15,045.2 |
| 8.00 | R.C.C. M-20 Grade (1 Cement:1 .5 Coarse sand:3 Grit 12-20 mm.size) i/c. cost of all materials, labour and T&P etc. but excluding cost of reinforcement required for proper completion of work. | 277.33 | M³ | 7,200 ₹19,96,776 | 6,000 ₹16,63,980 Lowest | 7,800 ₹21,63,174 | 8,096.55 ₹22,45,416.21 |
| 9.00 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/ 230mm /300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately) | 572.26 | M³ | 6,000 ₹34,33,560 | 4,500 ₹25,75,170 Lowest | 6,100 ₹34,90,786 | 6,354.2 ₹36,36,254.49 |
| 10.00 | Brick work in 1:4(1cement:4coarse sand) cement coarse sand mortar including cost of all materials,labour and T&P etc. required for proper completion of work. | 102.1 | M³ | 6,224.4 ₹6,35,511.24 | 6,000 ₹6,12,600 Lowest | 6,100 ₹6,22,810 | 6,224.4 ₹6,35,511.24 |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
30 Mar 2026, 10:00 amClosed
Superintending Engineer
3rd Circle Irrigation Works, Agra
Construction of boundary wall and road restoration etc. work for the Safety of New Canal Colony, Okhla.
2026_UPIDC_1123399_6
19/SE/2025-26
Open Tender
Civil Works
Item Rate
275 days
Okhla New Delhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹7.0 L
20 May 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation in foundation in ordinary soil ( loamy clay or sand ) i/c. lift upto 1.5 metre and lead upto 30 metre and i/c. back filling,watering and ramming of excavated earth into trenches and disposal of surplus earth as directed by Engineer-in-charge with cost of labour and T&P etc.required for proper completion of work. | - | Sqm. | - | - |
| - | Earth work in embankment / filling by power transported earth with a average lead 8.00 km. including excavation, loading,unloading, manual compaction, dressing and all lifts complete excluding royalty required for proper completion of work. | - | M3 | - | - |
| - | Providing & laying 80 mm. thick factory made C.C. Interlocking coloured tiles/paver block including 50mm thick compacted bed of fine sand proper embedding/laying of interlocking tiles leveling and dressing of surface to required level and slope,filling joints with fine sand and below it laying 0.10m. thick base concrete in 1:2:4 with cost of all materials,labour and T&P etc required for proper completion of work. directed by Engineer-in- charge. | - | M2 | - | - |
| - | Providing & laying of Cement Concrete in 1:3:6 (1 cement:3 coarse sand:6 stone grit 20-40 mm.size) including cost all materials ,labour and T&P etc. required for proper completion of work. | - | M³ | - | - |
| - | Providing & fixing Centering & Shuttering for C.C. Work i/c. rent of shuttering material ,labour and T&P etc. required for proper completion of work. | - | M2 | - | - |
| - | Steel Reinforcement for R.C.C. Work i/c. it's straightening, cutting, bending, binding and placing in position with cost of binding wire i/c cost of all materials, labour and T&P etc. required for proper completion of work. | - | MT | - | - |
| - | Providing & fixing Centering & Shuttering for R.C.C. Work i/c. rent of shuttering material ,labour and T&P etc. required for proper completion of work. | - | M2 | - | - |
| - | R.C.C. M-20 Grade (1 Cement:1 .5 Coarse sand:3 Grit 12-20 mm.size) i/c. cost of all materials, labour and T&P etc. but excluding cost of reinforcement required for proper completion of work. | - | M³ | - | - |
| - | Providing and laying autoclaved aerated cement blocks masonry with 150mm/ 230mm /300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately) | - | M³ | - | - |
| - | Brick work in 1:4(1cement:4coarse sand) cement coarse sand mortar including cost of all materials,labour and T&P etc. required for proper completion of work. | - | M³ | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2107164.xls
BOQ • 0.37 MB
TenderDocumentNewColony1.pdf
Tender Documents • 1.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .