| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-Finance | ₹33.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹33.8 LRejected-Finance | ₹33.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S RANA CONSTRUCTION AND DEVELOPERS L2 | M/S UGRASEN SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning jungle including uprooting of Rank vegetation, grass, brushwood, trees and saplings of grith upto 30 | 286 | SQM | 13.6 ₹3,889.6 | 12.6 ₹3,603.6 Lowest |
| 2.00 | Boring with Hydraulic pilling rigs with power units, Providing and Installing cast in situ single under reamed piles of specified Diameter and length below pile cap in M-25 Cement concrete, to carry a safe working load not less than specified,excluding the cost of steel Re-inforcement but including the cost of boring with bentonite solution and the lengthof the pile to beam bedded in pile cap etc.all complete. | 120 | RM | 2,250 ₹2,70,000 | 2,232 ₹2,67,840 Lowest |
| 3.00 | Excavation in foundation in ordinary soil (loan clay or sand )including lift upto 1.50M and lead upto 30m including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches etc. | 28.73 | CUM | 191 ₹5,487.43 | 189 ₹5,429.97 Lowest |
| 4.00 | Laying C.C. 0.10 cm. (4") thick consisting of 1:4:8 Cement,coarse sand & approved 40 mm. Gauge Brick aggregate including supply of all materials, labour and T & P etc. required for proper completion of work. | 28.58 | CUM | 4,960 ₹1,41,756.8 | 4,950 ₹1,41,471 Lowest |
| 5.00 | Reinforced cement concrete of 1:1.5:3. Cement,coarse sand & approved 20 mm. Gauge Stone ballast,over prepared sub grade after its rectifications & bringing it to proper camber & including supply of all materials,labour and T & P etc. required for proper completion of work. | 9.13 | CUM | 7,910 ₹72,218.3 | 7,902 ₹72,145.26 Lowest |
| 6.00 | M.S . Iron work in plain work in R.C.C column | 20.73 | QTL | 7,800 ₹1,61,694 | 7,794 ₹1,61,569.62 Lowest |
| 7.00 | Class -150 b/w in 1:6 cement and fine sand mortar in foundation and plinth including necessary cutting and moulding of brick work as required | 10.96 | CUM | 5,200 ₹56,992 | 5,193 ₹56,915.28 Lowest |
| 8.00 | 12 mm thick plaster 1:4 cement and fine sand | 13.2 | SQM | 255 ₹3,366 | 252 ₹3,326.4 Lowest |
| 9.00 | cost of Electric work ,wiring,fan,tubelight,LED TETC. | 1 | JOB | 55,000 ₹55,000 | 54,000 ₹54,000 Lowest |
| 10.00 | Steel work in built up Tubular shed (round,square or rectangular hollow tubes etc), Trusses etc including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer including welding and bolted with with special shaped washers etc all complete | 121.71 | QTL | 14,450 ₹17,58,709.5 | 14,400 ₹17,52,624 Lowest |
Tender Value
₹33.6 L
EMD Value
₹67,500
Closing Date
13 Oct 2025, 3:00 pmClosed
EE MLCD HAMIRPUR
EE MLCD HAMIRPUR
CONSTRUCTION OF TUBULAR SHADE STORE (24.0X9.0X4.0)MTR. including FOUNDATION AND CIVIL WORK at second stage of Vindhyawasini-Bhaura Danda Pump Canal Village-Narayadh, Block-Jaspura, ehsilPailani, Distt.-Banda
2025_UPIDM_1071550_2
E3/EE/2025-26/LOT1
Open Tender
Miscellaneous Works
Item Rate
45 days
BANDA
CONSTRUCTION OF TUBULAR SHADE STORE (24.0X9.0X4.0)MTR. including FOUNDATION AND CIVIL WORK at second stage of Vindhyawasini-Bhaura Danda Pump Canal Village-Narayadh, Block-Jaspura, ehsilPailani, Distt.-Banda
3 documents required · 3 mandatory
₹854
₹67,500
Yes
7 Aug 2026
7 Oct 2025
13 Oct 2025
7 Oct 2025
13 Oct 2025
7 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].