Tender Value
₹6.2 L
EMD Value
₹6,210
Closing Date
14 Sept 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(B.Pt)
BDO OFFICE KORADACHERY
1REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING TWOCLASSROOM(S/F) 2.REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING(TWO CLASS ROOM)(W/F) 3.REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING(THREE CLASS ROOM)(N/F)
2022_RDTN_249916_1
1349/2022/A3/29.08.2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
KORADACHERY BLOCK
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,210
Yes
15 Sept 2022
5 Sept 2022
14 Sept 2022
5 Sept 2022
14 Sept 2022
5 Sept 2022
Amount
1.REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING (TWO CLASS ROOM)(S/F)
Plastering with CM 1:5 mix , 12mm thick including cost and conveyance and all other labour charge etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Pointing with CM 1:3 to full depth of tiles using including 10% by weight of cement inlcuding cost And conveyance of all materials to site and all labour charges etc.,completed
Repairs to Door and Window
Window
2.REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING(TWO CLASS ROOM)(W/F)
Dismantling the execting damaged wall plastering including cost and conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix , 12mm thick including cost and conveyance and all other labour charge etc., completed
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Pointing with CM 1:3 to full depth of tiles using including 10% by weight of cement inlcuding cost And conveyance of all materials to site and all labour charges etc.,completed
Repairs to Door and Window
Window
3.REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING(N/F) THREE CLASS ROOM
Dismantling the Damaged ceiing Plastering removing away from the site including all chages etc for completed
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Brick work in CM 1:5 mix using country bricks includling cost and conveynace and all othre labour charges etc., completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Pointing with CM 1:3 to full depth of tiles using including 10% by weight of cement inlcuding cost And conveyance of all materials to site and all labour charges etc.,completed
Repairs to Door and Window
Window
4.REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING(W/F) NORTH SIDE
Dismantling the execting damaged wall plastering including cost and conveyance and all labour charges etc., completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Pointing with CM 1:3 to full depth of tiles using including 10% by weight of cement inlcuding cost And conveyance of all materials to site and all labour charges etc.,completed
Repairs to Door and Window
Window
5.REPAIRS TO KULIKARAI WEST PUM SCHOOL RCC ROOF BUILDING (N/F)
Dismantling the execting Demaged ciling crack including cost and conveyance and all labour charges etc., completed
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Black board Painting two coats using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Pointing with CM 1:3 to full depth of tiles using including 10% by weight of cement inlcuding cost And conveyance of all materials to site and all labour charges etc.,completed
Repairs to Door and Window
Window
6.REPAIRS TOKULIKARAI WEST PUM SCHOOL KITCHEN SHED
Dismantling the Damaged ceiing Plastering removing away from the site including all chages etc for completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost of materils and all labour charges etc., completed
Distembering two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Exterior emulsion two coats with best approvde distembering including cost of materils and all labour charges etc., completed
Painting two coats over oid iron works using ready mixed enamel paint including cost of materils and all labour charges etc., completed
Pointing with CM 1:3 to full depth of tiles using including 10% by weight of cement inlcuding cost And conveyance of all materials to site and all labour charges etc.,completed
Repairs to Door and Window
Window
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PRABU S
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .