Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
15 Feb 2024, 12:00 pmClosed
Executive Engineer
EE, UDH, Seppa
Const. of RCC Retaining wall/Protection wall at Land Protection wall at Land erosion site of Lower Police colony, Seppa, East Kameng District
2024_APUDH_1661_1
CEUD/PLG-490/VWDC/2023-24
Open Tender
Civil Works
Item Rate
547 days
Seppa
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,000
EE, UD and Housing, Seppa
₹1.8 L
15 Feb 2024
9 Feb 2024
15 Feb 2024
9 Feb 2024
15 Feb 2024
9 Feb 2024
Amount
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced cement concrete in foundaton and plinth finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
Reinforced cement concrete in retaining wall including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
Centring and shuttering including strutting, propping etc and removal of form work for a) Foundation, footings, bases of columns etc. and mass concrete WALL
Reinforcement of RCC work including bending, binding and placing in position complete.a) Mild Steel
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification B) Sandy material
Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.
Add Carrige Charge
M/S B S J ENTERPRISES
MS LIN CT CONSTRUCTION
stage.html
html • 0.02 MB
finance_1798.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .