| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance CIVIL HOSPITAL ROAD BARWALA DISTT HISAR | HISAR | HARYANA | 125001 | ₹12.8 L | L1 | Admitted-Finance |
| 2 | L2₹14.2 LAdmitted-Finance RGTPP KHEDAR HISAR HARYANA | HISAR | HARYANA | 125001 | ₹14.2 L | L2 | Admitted-Finance |
| 3 | L3₹15.1 LAdmitted-Finance GALI NO 2 JANAKPURI COLONY KARNAL ROAD KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | ₹15.1 L | L3 | Admitted-Finance |
| 4 | L4₹16.4 LAdmitted-Finance KARNAL ROAD KAITHAL | ₹16.4 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Dis-qualified. |
| Sl No | Description | Qty | Unit | Jagjit Singh Contractor L2 | Baljora Singh Contractor L3 | GOYAT TRADING COMPANY L4 | HARYANA CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Dewatering and cleaning of mud/silt in hot water duct in
the NDCT-II.The duct having size of 120x7x3
meter.Disposal of the mud silt with in 2 km lead as per
direction of Engineering-In-charge | 1 | JOB | 1,40,175 ₹1.4 L | 1,45,000 ₹1.4 L | 1,80,000 ₹1.8 L | 1,26,170 ₹1.3 L |
| 1.02 | Removal of Algee by scraping from the columns of
NDCT-II by using proper tools and scaffolding as per
the satisfication of Engineering-in-incharge | 1 | JOB | 4,45,756 ₹4.5 L | 4,70,756 ₹4.7 L | 5,50,000 ₹5.5 L | 4,01,000 ₹4.0 L |
| 1.03 | Surface preparation of cooling tower sump basin, raker
column footing, grillage column,retaining wall, partition
wall by wire brush, grinder or waste cotton to make
surface area free from dust, mud, algae etc. Epoxy paint of approved quality two coats and Surface preparation of cooling tower sump basin, all concrete footing, grillage column, retaining wall, partion wall by wire brush, grinder or waste cotton to make surface area free from dust, mud, algee etc and two coat of Epoxy paint. Scope of work as under
• Total surface preparation of cooling tower sump basin, all concrete columns, tie beams, retaining wall, partition wall and all the wall of hot water duct area around by wire brush or waste cottons to make surface area from dust, mud, algee if any found.
• After surface preparation two coats of Epoxy paint will be applied over the surface area of all concrete columns, tie beams, retaining wall, partition wall. Cost of epoxy Paint material shall be paid separately.
• Stirrer for mixing of paint is compulsory no other item will be allowed. Blower/exhuast fan (Min 2 nos. ) for confined space will be in vendor scope. For confined space 24 Volt hand lamp with transformer like lighting and other resources required as per site requirement. | 6,500 | SQM | 74.75 ₹4.9 L | 80 ₹5.2 L | 80.25 ₹5.2 L | 67 ₹4.4 L |
| 1.04 | Dewatering/ Desiltation of cold water Duct from CW
pump house to condenser involving dewatering the
structure and disposal of malba from the cold water
Duct complete in all respect. The work to be carried out
continuously day and night hours as per direction of Er-
Incharge. (Minimum 150 HP Pumps will required to
dewatering the structure ) | 1 | JOB | 46,725 ₹46,725 | 47,500 ₹47,500 | 60,000 ₹60,000 | 42,000 ₹42,000 |
| 1.05 | Making necessary arrangements for preventing the flow
of water from connecting channels to cooling tower
basin for a period of two months and if required services
for another 7 days shall be provided by the firm free of
cost during overhauling of unit-II at RGTPP, KHEDAR
(Hisar) | 1 | JOB | 78,498 ₹78,498 | 85,653 ₹85,653 | 85,000 ₹85,000 | 70,600 ₹70,600 |
| 1.06 | Dewatering/Cleaning of cooling tower basin involving
dragging out silt manually or mechanically or pumping
out sullary etc with minimum 150 HP capacity and
making bund with gunny bags to restrict entry of water,
lowering cooling tower gate and packing of gates
including all accessories and disposal the same as per
direction of Er-In-Charge.
Electricity will supply free of cost at one point by the
department and other arrangement of cable, starter will
be arranged by contractor at his own cost | 1 | JOB | 2,05,590 ₹2.1 L | 2,18,563 ₹2.2 L | 2,20,000 ₹2.2 L | 1,85,000 ₹1.9 L |
| 1.07 | Breaking of damage RCC Deflector, Louvers into pieces
lying on the floor of cooling tower basin. Removal and
disposal of the same with Lead of 02 KM. | 1 | JOB | 18,690 ₹18,690 | 22,353 ₹22,353 | 25,000 ₹25,000 | 16,800 ₹16,800 |
Updated dates
Tender Value
₹26.0 L
EMD Value
₹61,400
Closing Date
16 Feb 2026, 12:00 pmClosed
AVIKESH DAWRA
CE RGTPP Khedar Hisar
Miscellaneous overhauling work of NDCT-II, Unit-II at RGTPP, Khedar, Hisar
2025_HBC_484247_1
202599767E13 2791 41D5 9FED 4868BD7CE762712PGC
Open Tender
Civil Works
75 days
KHEDAR
As per NIT
2 documents required · 2 mandatory
₹1,180
₹61,400
Yes
7 Apr 2026
20 Nov 2025
20 Feb 2026
20 Nov 2025
16 Feb 2026
20 Nov 2025
20 Nov 2025 - 22 Nov 2025
Dewatering and cleaning of mud/silt in hot water duct in the NDCT-II.The duct having size of 120x7x3 meter.Disposal of the mud silt with in 2 km lead as per direction of Engineering-In-charge
Removal of Algee by scraping from the columns of NDCT-II by using proper tools and scaffolding as per the satisfication of Engineering-in-incharge
Surface preparation of cooling tower sump basin, raker column footing, grillage column,retaining wall, partition wall by wire brush, grinder or waste cotton to make surface area free from dust, mud, algae etc. Epoxy paint of approved quality two coats and Surface preparation of cooling tower sump basin, all concrete footing, grillage column, retaining wall, partion wall by wire brush, grinder or waste cotton to make surface area free from dust, mud, algee etc and two coat of Epoxy paint. Scope of work as under • Total surface preparation of cooling tower sump basin, all concrete columns, tie beams, retaining wall, partition wall and all the wall of hot water duct area around by wire brush or waste cottons to make surface area from dust, mud, algee if any found. • After surface preparation two coats of Epoxy paint will be applied over the surface area of all concrete columns, tie beams, retaining wall, partition wall. Cost of epoxy Paint material shall be paid separately. • Stirrer for mixing of paint is compulsory no other item will be allowed. Blower/exhuast fan (Min 2 nos. ) for confined space will be in vendor scope. For confined space 24 Volt hand lamp with transformer like lighting and other resources required as per site requirement.
Dewatering/ Desiltation of cold water Duct from CW pump house to condenser involving dewatering the structure and disposal of malba from the cold water Duct complete in all respect. The work to be carried out continuously day and night hours as per direction of Er- Incharge. (Minimum 150 HP Pumps will required to dewatering the structure )
Making necessary arrangements for preventing the flow of water from connecting channels to cooling tower basin for a period of two months and if required services for another 7 days shall be provided by the firm free of cost during overhauling of unit-II at RGTPP, KHEDAR (Hisar)
Dewatering/Cleaning of cooling tower basin involving dragging out silt manually or mechanically or pumping out sullary etc with minimum 150 HP capacity and making bund with gunny bags to restrict entry of water, lowering cooling tower gate and packing of gates including all accessories and disposal the same as per direction of Er-In-Charge. Electricity will supply free of cost at one point by the department and other arrangement of cable, starter will be arranged by contractor at his own cost
Breaking of damage RCC Deflector, Louvers into pieces lying on the floor of cooling tower basin. Removal and disposal of the same with Lead of 02 KM.
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
ALL HSR ITEMS required for the work of Miscellaneous overhauling work of NDCT-II, Unit-II at RGTPP, Khedar, Hisar. AS PER CBD.
stage.html
html • 0.03 MB
techsummary_562264.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_562264.xls
BOQ • 0.26 MB
5N70AFZ136993.pdf
Additional Documents • 0.35 MB
Download all tender documents and submit your bid