Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹93,469.17Accepted-Finance | ₹93,469.17 | 1 | Accepted-Finance Accept |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | A.SHABANAKATHOON L1 | Ellappan contractor L2 |
|---|---|---|---|---|---|
| 1.00Part I : Providing Ceiling Plastering, Painting Works, Galvanium Sheet and Platform works to Venbakkam PUPS in Kolathur Panchayat in Kattankolathur Panchayat Union Est: 0.96 Lakhs | |||||
| 2.00 | Chipping of concrete and roughening the surface etc. all complete | 129.43 | Sqm | 42 ₹5,436.06 | 45 ₹5,824.35 |
| 3.00 | Providing and applying Emulsion paint finish of approved make & shade in two coats over a coat of approved primer and 2 coats of patty to give an even shade as per manufacturer's instruction to the internal plastered surfaces including preparation of surfaces, | 129.43 | Sqm | 262 ₹33,910.66 | 270 ₹34,946.1 |
| 4.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 129.43 | Sqm | 308 ₹39,864.44 | 310 ₹40,123.3 |
| 5.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}12% | 1 | GST Amount | 14,258.01 ₹14,258.01 | 14,560.88 ₹14,560.88 |
Tender Value
₹96,000
EMD Value
₹1,000
Closing Date
27 Feb 2026, 3:00 pmClosed
BDO BP
The BDO BP
Providing Rural Building Maintanace works to Kolathur Panchayat 1 no Having Package no 08/2025 -26 in Kattankolathur Panchayat Union
2026_RDTN_666027_1
RC No 2442/2025/A2 dt 20.02.26
Open Tender
Civil Works - Buildings
90 days
BDO KTR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,000
Yes
6 May 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
27 Feb 2026
25 Feb 2026
Part I : Providing Ceiling Plastering, Painting Works, Galvanium Sheet and Platform works to Venbakkam PUPS in Kolathur Panchayat in Kattankolathur Panchayat Union Est: 0.96 Lakhs
Chipping of concrete and roughening the surface etc. all complete
Providing and applying Emulsion paint finish of approved make & shade in two coats over a coat of approved primer and 2 coats of patty to give an even shade as per manufacturer's instruction to the internal plastered surfaces including preparation of surfaces,
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}12%
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_800013.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_800013.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid