Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹12,690
Closing Date
11 Jul 2026, 6:00 pm3d left
office of the executive engineer rew ang
office of the executive engineer rew ang
CONSTRUCTION OF XING AT H/O KAREEM KHATANA AT WANGIDAR,LIDROO BLOCK PAHALGAM
2026_RDPR_314717_4
ENIT50of2026-27
Open Tender
Civil Works
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹12,690
6 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
11 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earthwork in excavation by hydraulicl means in trenches for foundations etc (not exceeding 1.5m in width) and not exceeding 10 sqm on plan,depth upto 1.5m including disposal of excavated earth upto 25 m from cutting edge,disposed earth to be levelled and neatly dressed. | 1 | Cum | - | - |
| 0.0 | P/L of stone Soling tightly handpacked and tamped manually incl carriage and 15% Voids deduction (to be paid as per actual) I/C PLUM IN C/C | - | Cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M7.5 mix. (1:4:8) and by using 20 mm down aggregates. | 1 | cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates. | 1 | cum | - | - |
| 0.0 | Reinforced cement concrete work in Slab excluding cost of centring, shuttering, finishing and reinforcement,with 1:1.5:3 graded stone aggregate 20mm nominal size raft | - | cum | 1 | - |
| 0.0 | Reinforced cement concrete work in Slab excluding cost of centring, shuttering, finishing and reinforcement,with 1:1.5:3 graded stone aggregate 20mm nominal size slab | 1 | cum | - | - |
| 0.0 | Reinforcement for RCC work including straightening,bending,cutting,placing in position and binding all complete, hot rolled deformed bars.@ 1.05qt/cum | - | kg | - | - |
| 0.0 | Formwork incl. Centring ,strutting, propping etc. and removal of formwork. SLAB | 1 | sqm | - | - |
| 0.0 | Formwork incl. Centring ,strutting, propping etc. and removal of formwork. Abut | - | sqm | - | - |
| 0.0 | Carriage BT MT (A) Sand/Aggregrate 40km hl 50m | 1 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1019317.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid