Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC ok |
| 2 | L2₹12.2 L+₹23,258.98 (1.94%)Rejected-AOC | ₹12.2 L+₹23,258.98 (1.94%) | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M.Rajagopal L2 | GR ENGINEERING AND CO L1 |
|---|---|---|---|---|---|
| 1.001.Providing CC road at kumararaja road in Pullilyon panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 13.14 | cum | 135 ₹1,774 | 131 ₹1,721 Lowest |
| 3.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 44.24 | cum | 3,100 ₹1,37,144 | 3,036 ₹1,34,313 Lowest |
| 4.00 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 67.74 | cum | 6,000 ₹4,06,440 | 5,940 ₹4,02,376 Lowest |
| 5.00 | CC 1:3:6 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete | 20.15 | cum | 6,800 ₹1,37,020 | 6,690 ₹1,34,804 Lowest |
| 6.00 | Cement Concrete 1:2:4 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 44.24 | cum | 7,400 ₹3,27,376 | 7,200 ₹3,18,528 Lowest |
| 7.00 | Cost towards supply centering with planks including all cost and conveyance charges | 175.2 | sqm | 145 ₹25,404 | 136 ₹23,827 Lowest |
| 8.00 | Supply of Bitumen pads including cost and conveyance of all materials to site and all labour charges etc. complete. | 11.06 | sqm | 245 ₹2,710 | 234 ₹2,588 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,86,816.24 ₹1,86,816.24 | 1,83,268.26 ₹1,83,268.26 Lowest |
Tender Value
₹12.3 L
EMD Value
₹13,000
Closing Date
4 Mar 2026, 3:00 pmClosed
Block Development office VP
Puzhal union
Providing cc road at Kumararaja road in pullilyon Panchayat
2026_RDTN_668687_1
Panchayat fund 04
Open Tender
Civil Works
Works
Puzhal
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹13,000
Yes
Block Development office VP
11 Sept 2026
28 Feb 2026
4 Mar 2026
28 Feb 2026
4 Mar 2026
28 Feb 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Providing CC road at kumararaja road in Pullilyon panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 13.14 | cum | 131.89 | ₹1,733.03 |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 44.24 | cum | 3,036.71 | ₹1,34,344.05 |
| 4 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 67.74 | cum | 5,940.46 | ₹4,02,406.76 |
| 5 | CC 1:3:6 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete | 20.15 | cum | 6,693.49 | ₹1,34,873.82 |
| 6 | Cement Concrete 1:2:4 using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 44.24 | cum | 7,237.47 | ₹3,20,185.67 |
| 7 | Cost towards supply centering with planks including all cost and conveyance charges | 175.2 | sqm | 136.88 | ₹23,981.38 |
| 8 | Supply of Bitumen pads including cost and conveyance of all materials to site and all labour charges etc. complete. | 11.06 | sqm | 234.3 | ₹2,591.36 |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_803403.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tenderdocument.pdf
Tender Documents • 0.56 MB
BOQ_803403.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .