Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | ₹17.7 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹19.6 LRejected-AOC | ₹19.6 L | L2 | Rejected-AOC Highest Amount Quoted |
| Sl No | Description | Qty | Unit | CHINNASAMY N L2 | KATHIRAVAN R L1 |
|---|---|---|---|---|---|
| 1.00 | 1.Renewal of the road from Perali - Maruvathur Km 0/0-1/0 (R - 83) Under Mines & Minerals (25%) 2025/2026
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 3,823.48 | m2 | 40 ₹1.5 L | 33 ₹1.3 L |
| 2.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH | 95.58 | m3 | 12,500 ₹11.9 L | 11,015 ₹10.5 L |
| 3.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 90 | m3 | 975 ₹87,750 | 961 ₹86,490 |
| 4.00 | Towards cost and supply of HM & km stone in all charges HM stone | 4 | Nos | 600 ₹2,400 | 574 ₹2,296 |
| 5.00 | KM stone | 1 | Nos | 2,250 ₹2,250 | 2,197 ₹2,197 |
| 6.00 | Provision for Road Marking | 200 | m2 | 900 ₹1.8 L | 890 ₹1.8 L |
| 7.00 | Provision for Sing Board Charges 60cm | 8 | Nos | 5,125 ₹41,000 | 4,999 ₹39,992 |
| 8.00 | Provision for Name Board Charges | 1 | Nos | 1,650 ₹1,650 | 15,000 ₹15,000 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,99,293 ₹3.0 L | 2,70,533 ₹2.7 L |
Tender Value
₹17.8 L
EMD Value
₹18,000
Closing Date
30 Dec 2025, 3:00 pmClosed
BDO VP Veppur
Block Development office Veppur
Renewal of the road from Perali - Maruvathur Km 0/0-1/0 (R - 83).
2025_RDTN_636523_1
3650/2025/B8 Mines and Minerals -2025-26
Open Tender
Civil Works - Roads
90 days
Block Development office Veppur
As Per Tender Documents
3 documents required · 3 mandatory
₹0
₹18,000
Yes
7 Mar 2026
26 Dec 2025
30 Dec 2025
26 Dec 2025
30 Dec 2025
26 Dec 2025
Amount
1.Renewal of the road from Perali - Maruvathur Km 0/0-1/0 (R - 83) Under Mines & Minerals (25%) 2025/2026 Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Towards cost and supply of HM & km stone in all charges HM stone
KM stone
Provision for Road Marking
Provision for Sing Board Charges 60cm
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHINNASAMY N (BID ID -1550228)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
PARTI.pdf
Tender Documents • 0.50 MB
BOQ_761745.xls
BOQ • 0.26 MB
PARTII.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid