| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance 64 3 | ₹1.5 L | H1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | H2₹1.5 L−₹1,092.70 (0.72%)Admitted-Fee/PreQual/Technical/Finance | ₹1.5 L−₹1,092.70 (0.72%) | H2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | H3₹1.3 L−₹19,526.15 (12.8%)Admitted-Fee/PreQual/Technical/Finance | ₹1.3 L−₹19,526.15 (12.8%) | H3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | V MURUGAN H3 | MARISELVAM H1 | RAJKANNA H2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 4.5 | M3 | 100 ₹450 Lowest | 229 ₹1,030.5 | 220 ₹990 |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2 | M3 | 5,274 ₹10,548 Lowest | 5,700 ₹11,400 | 5,577 ₹11,154 |
| 3.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 4 | M3 | 6,263 ₹25,052 Lowest | 7,520 ₹30,080 | 7,493 ₹29,972 |
| 4.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 1 | m2 | 8,268 ₹8,268 Lowest | 8,600 ₹8,600 | 8,577 ₹8,577 |
| 5.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 100 | M3 | 89 ₹8,900 Lowest | 110 ₹11,000 | 92 ₹9,200 |
| 6.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 3 | Kg | 525 ₹1,575 Lowest | 1,090 ₹3,270 | 1,085 ₹3,255 |
| 7.00 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) | 10 | M2 | 269 ₹2,690 Lowest | 290 ₹2,900 | 286 ₹2,860 |
| 8.00 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 94.5 | M2 | 105 ₹9,922.5 Lowest | 110 ₹10,395 | 108 ₹10,206 |
| 9.00 | Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. | 5.15 | m2 | 249 ₹1,282.35 Lowest | 270 ₹1,390.5 | 262 ₹1,349.3 |
| 10.00 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. | 6 | M2 | 147 ₹882 Lowest | 160 ₹960 | 153 ₹918 |
Tender Value
Refer Docs
EMD Value
₹1,800
Closing Date
27 Aug 2026, 3:00 pmClosed
Municipal Commissioner Puliyangudi Municipality 62
Commissioner, Subramaniasamy southnorth street, Municipal Office Puliyangudi 627855
Construction of Toilet at Community Hall W-32 in Puliyangudi Municipality.
2026_MAWS_691307_1
843/2026/E1-1.80
Open Tender
Civil Works - Buildings
Works
90 days
commissioner puliangudi Municipalilty
Class V
2 documents required · 2 mandatory
₹0
₹1,800
27 Aug 2026
6 Aug 2026
27 Aug 2026
6 Aug 2026
27 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 4.5 | M3 | 100 | ₹450 |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2 | M3 | 100 | ₹200 |
| 3 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 4 | M3 | 10 | ₹40 |
| 4 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 1 | m2 | 10 | ₹10 |
| 5 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 100 | M3 | 10 | ₹1,000 |
| 6 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 3 | Kg | 10 | ₹30 |
| 7 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) | 10 | M2 | 10 | ₹100 |
| 8 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. | 94.5 | M2 | 10 | ₹945 |
| 9 | Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. | 5.15 | m2 | 10 | ₹51.5 |
| 10 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. | 6 | M2 | 10 | ₹60 |
stage.html
html • 0.02 MB
finance_831231.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_831231.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .