Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC BHAGWATI BHAWAN PO HASIMARA DIST JALPAIGURI PIN 735215 | ALIPURDUAR | WEST BENGAL | 735215 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹15.2 L+₹41,160 (2.78%)Rejected-Finance 21 JHAMRI 151 JHAMRI JHAMRI ROHTAK HARYANA 124142 UDYAM HR 07 0030314 | JHAJJAR | HARYANA | 124142 | L2 | Rejected-Finance Higher bid value | |
| 3 | L3₹15.4 L+₹64,360 (4.35%)Rejected-Finance INDEX NO D 35 ADG NEI GUWAHATI OLD HASIMARA POST HASIMARA DIST ALIPURDUAR WB PIN 735215 | ALIPURDUAR | WEST BENGAL | 735215 | L3 | Rejected-Finance Higher bid value | |
| 4 | L4₹15.7 L+₹85,135 (5.75%)Rejected-Finance | L4 | Rejected-Finance Higher bid value | |
| 5 | L5₹16.1 L+₹1.3 L (9.03%)Rejected-Finance | L5 | Rejected-Finance Higher bid value |
Tender Value
₹13.5 L
EMD Value
₹27,000
Closing Date
17 Jan 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (AF) BAGDOGRA
Commander Works Engineers (AF) Bagdogra Bagdogra Airport (WB) Pin- 734 421 Tele 0353 - 2698308
INSTALLATION OF MAAG (P IV BAK 12 (6 TO 30 TON)) AT AFS STN HASIMARA UNDER GE (AF) HASIMARA.
2023_MES_631192_2
8545/HAS/2023-24/E8
Open Tender
Civil Works
Item Rate
45 days
HASIMARA
MES Contractor enlisted as Class E category a(iii) having deposited Standing Security of Rs 50,000.00 with dept. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
9 documents required · 9 mandatory
₹500
GE (AF) HASIMARA
₹27,000
Yes
19 Jan 2024
9 Jan 2024
18 Jan 2024
9 Jan 2024
17 Jan 2024
10 Jan 2024
Amount
Note 1:- (Applicable for all parts/items) : The biidders/contractors are advised to read tender documents & all corrigendum/amendments and general condition of contracts before entry/quoting the rates. Note 2:- Attention to bidder is hereby invited to upload revised BOQ if published during their bid submission. Uploading of incorrect/ pre-revised BOQ shall be treated as non bonafide and rejected. Fixed credit has been given in technical documents which shall be taken into account during acceptance of bid/tender.
Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) upto 1.5m depth including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed.
Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) exc1.5m and n exc 3m depth including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed.
Removing excavated material exc. 1.50 km but n exc. 5 km and depositing where complete all as specified and directed.
Rolling and consolidating formation surfaces in cutting by power roller exc. 5 tonnes & n exc 8 tonnes complete all as specified and directed.
Supply only approved earth from outside of MOD land for laying at site complete all as specified and directed.
Supply only approved river bed material for laying at site complete all as specified and directed.
Soil stabilization of each layer n.exc 150 mm thick as sub grade soil by uniform mixing of cement additive @ 5% cement by weight of soil in order to achieve CBR value grater than 7.Type of additive and percentage required for blending to be given in Mix design.item will include pulverization of soil,spreading of additive,blending mix by tractor towed rotavator,addition of water/drying of mix to required moisture content and compacting using suitable vibratory roller to required 98% maximum dry density.Provision of IRC SP:89:2010 be refrred to for this item. Note:- (i) Soil used obtained from Sl Item No 1,2,5 & 6 as mixing percentage fixed by Competent Authority. (ii) Rate of cement Include this item.
Conducting field CBR test as per direction by the Engr-in-charge and following specification as per IS-2720 part 31 and submission of report in quadruplicate before satisfactory completion of work complete all as specified and directed.
M&L and compacting 150mm thick (compacted thiclness) granular sub base course (GSB) grading as per Grade I as specified Table 400 -1 of MoRTH specification for oadand Bridge works, 2013, in a single layer over compacted subgrade with natural sand, crushed gravel, crushed stone, crushed slag, or combination there of as per the grading required. the material are mechanically mixed, spread of adequate capacity and rolling with vibratory roller of capacity 80-100KN static weight for achiveving required compaction density of atleast 98% of the MDD. Consolidating to required gradiant and camber complete all as per Table 900-1 of MoRTH specification for road and Bridge works, 2013.
M&L and compacting 150mm thick (compacted thiclness) Wet Mix Macadam (WMM) laid in two layers of 75mm each grading as per table 400-13 of MoRTH specification for Road and Bridge works 2013 manufatured in WMM plant, material comprising of clean, crushed, graded aggregate and granualar material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100KN static weight and consolidating to required gradiant and camber complete all as specified and directed. The finished surface tolerances to be as per Table 900-1 of MoRTH specification for Road And Bridge works 2013.
Preparing unsurfaced water bound macadamsurfaces by brushing with wire brushes for removing caked mud etc. swe eping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete all as specified and directed.
M&L applying a prime coat of cationic bitumen emulsion SS1 confirming to IS:8887 at a rate of application of 0.7-1 kg/sqm on surfaces of WMM/WBM as specified in Table 500-3 of MoRTH specification for road and bridge works 2013, using mechanical sprayer complete all as specified and directed.
M&L bituminous premix semi dense asphaltic concrete ( Paving Bitumin any penitration) 40mm consolidated thickness with 5.5% binder content by weight of total mix, rolled and compacted to required camber and gradient complete all as specified and directed.
M/S. KUMAR CONSTRUCTION CO.
M/S ANNI ENTERPRISE
M/S ANIL KUMAR BAUL
M/S RATHIN ENTERPRISES
M/S. VINITA CONSTRUCTION
M/S SARDAR MAL NAHATA
M/S ROY ENTERPRISE
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .