Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-AOC AT JARIDIH PO JARIDIH DIST BOKARO JHARKHAND | JARIDIH | BOKARO | JHARKHAND | 1 | Accepted-AOC L1 | |
| 2 | 2₹3.8 L+₹9,192.20 (2.51%)Rejected-AOC AT KATHARA PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | 2 | Rejected-AOC L2 | |
| 3 | 3₹4.0 L+₹33,795.20 (9.22%)Rejected-AOC MAIN ROAD JARANGDIH DIST BOKARO JHARKHAND 829113 | JARANGDIH | BOKARO | JHARKHAND | 829113 | 3 | Rejected-AOC L3 |
Tender Value
₹3.7 L
EMD Value
₹4,600
Closing Date
23 Oct 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PROJECT ENGINEER (EXCV), JARANGDIH OCP
OFFICE OF THE PROJECT OFFICER, JARANGDIH OCP, KATHARA AREA,CENTRAL COALFIELDS LIMITED, PIN 829113
Repairing of Boom of L and T CK 300 (Sl. No. 757/2946) shovel of Jarangdih Colliery.
2024_CCL_319077_1
JRD/PE/Excv/E-TENDER/24-25/256
Open Tender
Excavation Department Work
Item Rate
14 days
JARANGDIH OCP, KATHARA AREA, CENTRAL COALFIELDS LI
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,600
4 Nov 2024
10 Oct 2024
24 Oct 2024
11 Oct 2024
23 Oct 2024
11 Oct 2024
11 Oct 2024 - 23 Oct 2024
Amount
Item description
Gas (O2 + DA).
Gauging electrode.
L.H. electrode.
Steel electrode.
Welding machine hiring, 2 Nos. x 10 Days.
Angle grinder machine hiring with wheel 08 nos.
Straight grinder machine hiring with wheel 08 nos.
Fixture cost.
Hydraulic jack (150 Te). Hiring charge.
Line boring machine hiring, 1 No. x 6 Days.
04 nos. bush new making with the help of lathe machine.
02 nos. pin new making with the help of lathe machine for boom cylinder lower side.
Tools and tackles, vehicles.
Welder. 02 nos. x 02 shift. X 10 days.
Fitter. 01 no. x 02 shift. X 10 days.
Cutter man. 01 no. x 02 shift. X 10 days.
Turner. 01 no. x 02 shift. X 08 days.
Helper. 04 nos. x 02 shift. X 10 days.
Supervisor. 01 no. x 02 shift. X 10 days.
Contractor profit 10%.
Total impact of IGST for the purpose of CTC
M/s. SARSWATI ENTERPRISES, KATHARA
M/S. MANISHA ENTERPRISES
techsummary_330734.pdf
PDF • 0.28 MB
finsummary_330734.pdf
PDF • 0.28 MB
WO256.pdf
PDF • 0.47 MB
finance_330734.pdf
PDF • 0.28 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .