| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹88.8 L+₹9.4 L (11.9%)Rejected-AOC | L2 | Rejected-AOC Other than L1 | |
| 3 | L3₹89.7 L+₹10.4 L (13.1%)Rejected-AOC 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | EAST | DELHI | 110092 | L3 | Rejected-AOC Other than L1 | |
| 4 | L4₹92.7 L+₹13.4 L (16.8%)Rejected-AOC WZ 409 0 B 1ST FLOOR PLOT NO 12 JANAK PARK HARI NAGAR NEW DELHI 110064 | NEW DELHI | WEST DELHI | DELHI | 110064 | L4 | Rejected-AOC Other than L1 | |
| 5 | L5₹93.1 L+₹13.8 L (17.4%)Rejected-AOC RZ A2 2 CHANAKYA PLACE PART I OPP C 1A BLOCK JANAK PURI NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | L5 | Rejected-AOC Other than L1 |
Tender Value
₹96 L
EMD Value
₹1.7 L
Closing Date
22 May 2023, 6:00 pmClosed
CWE NO 2 DELHI CANTT
HQ CWE NO 2 DELHI CANTT-10
REPAIR/REPLACEMENT AND OVERHAULING AND COMPREHENSIVE MAINTENANCE OF DX TYPE CENTRAL AC PLANTS AND CONNECTED MISC E/M WORKS REPAIR/REPLACEMENT AND OVER HAULING OF UNSERVICEABLE SPARES OF WATER COOLED CENTRAL AC PLANT, REWINDING OF COMPRESSOR MOTOR, RE
2023_MES_588372_1
CWE/BH-02/2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE (E/M) BASE HOSPITAL DELHI CANTT-10
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
GE E/M BASE HOSPITAL DELHI CANTT
₹1.7 L
Yes
15 Jul 2023
6 Apr 2023
24 May 2023
6 Apr 2023
22 May 2023
28 Apr 2023
Amount
Dismantling compressor of central AC plant for overhauling complete with connected copper pipe line and loading unloading mechanism & pump down the existing refrigerant in separate cylinder, disconnecting of electric motor of compressor, refrigerant line, gauges pipe and carry out the general over hauling of compressor, compressor model:- SMC/4/65, Make:- Accel(R-22) including replacement of springs, aluminium washer packing, screw, lath work, cleaning detergent, cotton waste, changing of compressor oil etc and cleaning the suction filter, oil filter, replacing the defective parts compete system for safe guard the gas with self pumping down system or with total recovery unit system incld. following operation complete all as specified & directed. (i) Charging of nitrogen Gas in unit & complete system at 300 psi pressure and checking of any dropping of pressure/ leakage up to 72 Hrs after replacement of compressor & rectification of leakage if any. (ii) Vaccumisation of complete system for minimum 2 days for dropping of vacuum pressure & rectification of leakage if any. (iii) Charging of complete system with R-22 gas for maintaining the system pressure up to HP - 175 psi & LP - 65 psi.... (iv) Measure the inlet and outdoor temperature of Chiller unit for performance checking and maintaining temp. as per require site. (v) Testing & commissioning of compressor after completion. Note:- (a) Spares of compressor shall be measured and paid separetely under respective item of this schedule (Sr. No 1.01 to1.22). (b) Any minor items required for overhauling except described here -in - after shall be supplied by the contractor with out any extra cost to the deptt and the rates for the same shall deemed to be included in the quoted rates.
Supply only PISTON with PIN &Rings -04 Nos(ACCEL Part No. ASL6018R) complete all as specified and as directed.SMC/4/65
Supply only CYLLINDER with suction valve- 04 Nos (R-22) (ACCEL Part No. ASL6019A) complete all as specified and as directed.SMC/4/65
Supply only OIL pump (ACCEL Part No. ASL6011A) complete all as specified and as directed. SMC/4/65
Supply only Discharge valve assembly - 04 Nos (R-22) (ACCEL Part No. ASL6020 A) complete all as specified and as directed. SMC/4/65
Supply only Oil pressure regulation valve (ACCEL Part No. ASL6022 R) complete all as specified and as directed. SMC/4/65
Supply only Set of gasket complete (ACCEL Part No. ASL6453) complete all as specified and as directed. SMC/4/65
Supply only Set of neoprene 'O' RINGS (ACCEL Part No. ASL6454) complete all as specified and as directed. SMC/4/65
Supply only Set of Dowty ring (ACCEL Part No. ASL6455) complete all as specified and as directed. SMC/4/65
Set of SEALING RING (ACCEL Part No. ASL6456) complete all as specified and as directed. SMC/4/65
Supply only SPRING FOR SAFETY HEAD (ACCEL Part No. B-12) complete all as specified and as directed. SMC/4/65
Supply only HALF SECTION OF BRG. STD. (ACCEL Part No. E-02) complete all as specified and directed. SMC/4/65
Supply only BEARING WITH MAIN BUSHING -02 Nos STD (ACCEL Part No. C-03) complete all as specified and directed. SMC/4/65
Supply only DOWEL FOR BUSHING COLLAR -02 Nos (ACCEL Part No. C-17) complete all as specified and directed. SMC/4/65
Supply only CONNECTING ROD ASSEMBLY - 04 Nos (ACCEL Part No. ASL6017 A) complete all as specified and directed. SMC/4/65
Supply only OIL STRAINER (ACCEL Part No. ASL6033 A) complete all as specified and directed. SMC/4/65
Supply only CRANKSHAFT - FOR SMC/4/65 (ACCEL Part No. ASL6416 A) complete all as specified and directed. SMC/4/65
supply only SINGLE FRAME ASSEMBLY (ACCEL Part No. UN-FRM-65) complete all as specified and directed. SMC/4/65
Supply only UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL6012A-1) complete all as specified and directed. SMC/4/65
Supply only SHAFT SEAL ASSEMBLY (ACCEL Part No. ASL6010 R) complete all as specified and directed. SMC/4/65
Supply only SUCTION STOP VALVE ASSEMBLY (ACCEL Part No. ASL6025 A) complete all as specified and directed. SMC/4/65
Supply only DISCHARGE STOP VALVE ASSEMBLY (ACCEL Part No. ASL6026 A) complete all as specified and directed. SMC/4/65
Dismantling compressor of central AC plant for overhauling complete with connected copper pipe line and loading unloading mechanism & pump down the existing refrigerant in separate cylinder, disconnecting of electric motor of compressor, refrigerant line, gauges pipe and carry out the general over hauling of compressor, compressor model:- SMC/4/100, Make:- Accel (R-22) including replacement of springs, aluminium washer packing, screw, lath work, cleaning detergent, cotton waste, changing of compressor oil etc and cleaning the suction filter, oil filter, replacing the defective parts compete system for safe guard the gas with self pumping down system or with total recovery unit system incld. following operation complete all as specified & directed. (i) Charging of nitrogen Gas in unit & complete system at 300 psi pressure and checking of any dropping of pressure/ leakage up to 72 Hrs after replacement of compressor & rectification of leakage if any. (ii) Vaccumisation of complete system for minimum 2 days for dropping of vacuum pressure & rectification of leakage if any. (iii) Charging of complete system with R-22 gas for maintaining the system pressure up to HP - 175 psi & LP - 65 psi.... (iv) Measure the inlet and outdoor temperature of Chiller unit for performance checking and maintaining temp. as per require site. (v) Testing & commissioning of compressor after completion. Note:- (a) Spares of compressor shall be measured and paid separetely under respective item of this schedule (Sr No. 3.01 to 3.20). (b) Any minor items required for overhauling except described here-in-after shall be supplied by the contractor with out any extra cost to the deptt and the rates for the same shall deemed to be included in the quoted rates.
Supply only PISTON with PIN & Rings- Nos -04 Nos(ACCEL Part No. ASL1018R) complete all as specified and directed. SMC/4/100,
Supply only CYLLENDER with suction valve -04 Nos(R-22) (ACCEL Part No. ASL1019A) complete all as specified and directed. SMC/4/100,
Supply only OIL pump (ACCEL Part No. ASL1011A) complete all as specified and directed. SMC/4/100,
Supply only Discharge valve assembly (R-22) (ACCEL Part No. ASL1020 A) complete all as specified and directed. SMC/4/100,
Supply only Oil pressure regulation valve (ACCEL Part No. ASL1022 R) complete all as specified and directed. SMC/4/100,
Supply only Set of gasket (ACCEL Part No. ASL1453) complete all as specified and directed. SMC/4/100,
Supply only Set of neoprene ' O' RINGS (ACCEL Part No. ASL1454) complete all as specified and directed. SMC/4/100,
Supply only Set of Dowty ring (ACCEL Part No. ASL1455) complete all as specified and directed. SMC/4/100,
Supply only Set of SEALING RING (ACCEL Part No. ASL1456) complete all as specified and directed. SMC/4/100,
Supply only SPRING FOR SAFETY HEAD (ACCEL Part No. B-12) complete all as specified and directed. SMC/4/100,
Supply only HALF SECTION OF BRG. STD. (ACCEL Part No. E-02) complete all as specified and directed. SMC/4/65
Supply only BEARING WITH BUSHING STD (ACCEL Part No. C-03) complete all as specified and directed.SMC/4/100,
Supply only CONNECTING ROD ASSEMBLY (ACCEL Part No. ASL1017 A) complete all as specified and directed. SMC/4/100,
Supply only OIL STRAINER (ACCEL Part No. ASL1033 A) complete all as specified and directed. SMC/4/100,
Supply only CRANKSHAFT - FOR SMC/4/100 (ACCEL Part No. ASL1416 A) complete all as specified and directed. SMC/4/100,
Supply only SINGLE FRAME ASSEMBLY (ACCEL Part No. UN-FRM-100) complete all as specified and directed. SMC/4/100,
Supply only UNLOADING CYLINDER ASSEMBLY (ACCEL Part No. ASL1012A-1) complete all as specified and directed. SMC/4/100,
Supply only SHAFT SEAL ASSEMBLY (ACCEL Part No. ASL1010 R) complete all as specified and directed. SMC/4/100,
Supply only BUSHING FOR PISTON PIN (ACCEL Part No. E-07) complete all as specified and directed. SMC/4/100,
S & F in repair oil pressure cut out for compressor of central type AC plant of any capacity as specified and directed Make- Sporlene/ Danfoss/ Emerson
S & F in repair high pressure cut out for Accel make compressor of central type AC plant of any capacity as specified and directed Make- Sporlene/ Danfoss/ Emerson
S & F in repair low pressure cut out for Accel make compressor of central type AC plant of any capacity as specified and directed Make- Sporlene/ Danfoss/ Emerson
S & F in repair low pressure gauge/ oil pressure gauge for Accel make compressor of central type AC plant of any capacity as specified and directed. Make- Sporlene/ Danfoss/ Guru
S & F in repair high pressure gauge for Accel make compressor of central type AC plant of any capacity as specified and directed. Make- Sporlene/ Danfoss/ Guru
S & F in repair three way solenoid valve suitable for (Accel make compressor, compressor model-SMC/4/65 and SMC/4/100) central type AC plant of any capacity as specified and directed. Make of Solenoid valve or equivalent model of Sporlene/ Danfoss/ Emerson
S&F in repair CT Fan complete section Fan, Fan Dia-1200 mm , connected GI nutbolts and accessories all fitting sutiable for 120 TR cooling tower, CT Model-5061, CT Make-delta as per specified & directed by Engr-in-charge. FAN Make:- Kruger/ Nicotra/ Delta
S&F in repair CT Fan complete section Fan, Fan Dia-900 mm , connected GI nutbolts and accessories all fitting sutiable for 35 TR cooling tower, CT Model-5032, CT Make-delta as per specified & directed by Engr-in-charge. FAN Make:- Kruger/ Nicotra/ Delta
S & F in replacement of Expansion valve for plant capacity 12/ 12.5TR
S & F in replacement of Expansion valve for plant capacity 30TR (cat part no. 107E in sporlane or equivalent model of Danfoss/ Emerson)
S & F in replacement of Expansion valve for plant capacity 40TR X3, (cat part no. 107E in sporlane or equivalent model of Danfoss/ Emerson)
M&L for repairing/ servicing incl. transportation to authorised workshop the centrifugal pump of following capacities by disconnecting the pump from motor, opening for inspection, replacing the worn out parts like gland bush, bearings, gland bolts and nuts, gland packing, gasket, water seal etc including repairing to pump shaft by remetalling, grinding, polishing and reassembling complete pump & refixing in same position & connecting including replacing the rusted nuts, bolts, washers etc and testing complete all as specified and directed by Engr-in-Charge (Srl No. 15.01 TO 15.02)
Condenser or Chiller Pump of capacity 5 HP, Head Range-6-38M, LPS-7.4.
Condenser or Chiller Pump of capacity 10 HP, Head Range-6-38M.
Supply & charge the refrigerent R22 Gas. (Make:- Mafron/ Freon)
S&F in repair single phase preventor Minilec VSP -2 suitable for 3 phase supply 415 volt all complete as specified and directed.
S&F in repair 3 pole, ML3 contactor, 415 volt including NO or NC AUXILIARY contacts also including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 70 including NO or NC auxiliary contact block, coil voltage 230 V including connecting complete as specified and directed
S&F in repair 3 pole power contactor 415 V, type MNX 50 including NO or NC auxiliary contact block, coil voltage 230 V including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 40 including NO or NC auxiliary contact block, coil voltage 230 V including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 32 including NO or NC auxiliary contact block, coil voltage 230 V including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 25 including NO or NC auxiliary contact BLOCK, Coil voltage 230 V, 50 Hz including connecting complete as specified and directed.
S&F in repair 4 pole power contactor 415 V, type MNX 18 including NO or NC auxiliary contack Block, Coil voltage 230 V, 50 HZ including connecting complete as specified and directed.
S&F in repair 3 pole power contactor 415 V, type MNX 12 including NO or NC auxiliary contact block, coil voltage 230 V with including connecting complete as specified and directed.
S&F in repair 3 pole, ML2 contactor including NO or NC AUXILIARY contacts also including connecting complete as specified and directed.
S&F in repair 3 pole, ML6 contactor, 415 volt including NO or NC AUXILIARY contacts also including connecting complete as specified and directed.
M&L for descaling of condensser tube of central AC plant of cap 3x12.5TR by disconecting the condensser from the system, cleaninh by descaling pump of suitable capacity of 110 ' feet head using descaling solution of make Hibird or descaling solution, cleaning condenssor tube by nylon bursh & MS rod of suitable size, replacement of rubber joints and u/s nut bolts Note:- (i) Arrangment of T&P such as pump, tube, descaling solution shall be carried out by contractor. (ii) Descalling of all respective condensors are considered as one job.
All as per Ser items No 27 here-in-before but 3X30TR
All as per Ser items No 27 here-in-before but 3X40TR
S&F in repairs fan belt of Size B-81 complete as specified and directed Make: ECODRIVE/ DUNLOP/ Fenner
S&F in repairs fan belt of Size B-72 complete as specified and directed Make: ECODRIVE/ DUNLOP/ Fenner
S&F in repairs fan belt of Size B-68 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-76 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-98 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size C-108 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-70 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size B-60 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size A-24 complete as specified and directed Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size complete as specified and directed B-85 Make: FENEER/ ECODRIVE/ DUNLOP
S&F in repairs fan belt of Size complete as specified and directed A-28 Make: FENEER/ ECODRIVE/ DUNLOP
Taking down the existing unserviceable sluice valve of size 100 mm dia, Supply and fixing new sluice valve of size 100 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed. Make- ZOLTA/ SANT/ KARTAR
Taking down the existing unserviceable butterfly valve of size 80 mm dia, Supply and fixing new butterfly valve of 80 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable butterfly valve of size 65 mm dia, Supply and fixing new butterfly valve of size 65 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable butterfly valve of size 50 mm dia, Supply and fixing new butterfly valve of size 50 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable butterfly valve of size 100 mm dia, Supply and fixing new butterfly valve of size 100 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
Taking down the existing unserviceable stainer of size 80 mm dia, Supply and fixing new stainer of size 80 mm dia including cutting welding of pipe up to required size with flange complete all as specified and directed.
All as same of item No. 44 but size 50mm.
All as same of item No. 44 but size 100mm.
Checking the interlocking control and attending the compaint of control panel wiring of AC plant and making it fully serviceable with and including all size of wires, thimble, PVC, bakelight, connection plate Nut bolt, MCB, Indicator Lamp, MO NC block and other items. Note: (i) After intimation of breakdown by JE/ AGE E/M through telephone or verbally, the contractor should arrange the machanic to attend the complaint in side BHDC premisis within 2 hours and make them functional, if any item required the same shall be measured from particular item from schedule for complete work. (ii) If complaint intimation is done after 1600 hrs then complaint to be attented by contractor at 800 hrs next day. (iii) If contractor failer to attend complaint with in time frame, the recovery of Rs400/ Hrs will be implemented.
S&F in repair biametallic themal over load relay 9-15 Amps complete as specified and directed Make:- Seimens/ L&T/ BCH
S&F in repair biametallic themal over load relay 14-23 Amp complete as specified and directed Make:- Seimens/ L&T/ BCH
S&F in repair biametallic themal over load relay 20-33 Amp complete as specified and directed Make:- Seimens/ L&T/ BCH
S&F in repair biametallic themal over load relay 24-40 Amp complete as specified and directed Make:- Seimens/ L&T/ BCH
Taking out the existing unserviceable sprinklar of cooling tower and supply, installation, testing and commissioning of new sprinklar assembly for cooling tower as following as specified and as directed by Engr-in-Charge. Make- DELTA/ MIHIR/ UNIVERSAL.
M & L incl. transportation to authorsided workshop for taking out electric motor from the centrifugal pump set, opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding wire of size & discription to match with existing including insulating materials, varnishing and drying, reassembling, refixing in same position & connecting complete including testing and commissioning complete all as specified & directed .
Condenser or Chiller Pump of capacity 5 HP, Head Range-6-38M, LPS-7.4 , Make : Kirloskar
Condenser or Chiller Pump of capacity 10 HP, Head Range-6-38M, Make: Kirloskar
M&L for taking out compressor Motor (Motor cap-40 HP, MAKE-KIRLOSKAR) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . Opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
M&L for taking out compressor Motor (Motor cap- 50 HP, MAKE-GENERAL ELECTRIC POWER INDIA) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
M&L for taking out compressor Motor (Motor cap- 20 HP) of AC plant and Dis mantling the motor with disconnecting the same from the compressor and remove rubber coupling and its connected accessories and transporting to reputed work shop for rewinding . opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed.
S&F in repair all accessories corroision proof PVC Filling, inlet louvers, drift, PVC eliminators,PVC water distribution chamber and nozzeles (self rotating sprinklers) GI nut bolt (included float valve)and all fitting complete all as specified & directed. Note:- (a) The spray system should be work satisfactory even with 50% reduced flow of water. (b) The induced draught cooling tower should be operate according to the counter flow principle. (c) Cooling tower specification for PVC filling (Delta make) (i) Capacity - 120 TR
S&F in repair all accessories corroision proof PVC Filling, inlet louvers, drift, PVC eliminators,PVC water distribution chamber and nozzeles (self rotating sprinklers) GI nut bolt (included float valve)and all fitting complete all as specified & directed. Note:- (a) The spray system should be work satisfactory even with 50% reduced flow of water. (b) The induced draught cooling tower should be operate according to the counter flow principle. (c) Cooling tower specification for PVC filling (Delta make) (i) Capacity - 150 TR
S&F in repair all accessories corroision proof PVC Filling, inlet louvers, drift, PVC eliminators,PVC water distribution chamber and nozzeles (self rotating sprinklers) GI nut bolt (included float valve) and all fitting complete all as specified & directed. Note:- (a) The spray system should be work satisfactory even with 50% reduced flow of water. (b) The induced draught cooling tower should be operate according to the counter flow principle. (c) Cooling tower specification for pvc filling (Delta make) (i) Capacity - 25 TR
S&F in repair all accessories corroision proof PVC Filling, inlet louvers, drift, PVC eliminators,PVC water distribution chamber and nozzeles (self rotating sprinklers) GI nut bolt (included float valve) and all fitting complete all as specified & directed. Note:- (a) The spray system should be work satisfactory even with 50% reduced flow of water. (b) The induced draught cooling tower should be operate according to the counter flow principle. (c) Cooling tower specification for pvc filling (Delta make) (i) Capacity - 90 TR
S&F in repair all accessories corroision proof PVC Filling, inlet louvers, drift, PVC eliminators,PVC water distribution chamber and nozzeles (self rotating sprinklers) GI nut bolt (included float valve) and all fitting complete all as specified & directed. Note:- (a) The spray system should be work satisfactory even with 50% reduced flow of water. (b) The induced draught cooling tower should be operate according to the counter flow principle. (c) Cooling tower specification for pvc filling (Delta make) (i) Capacity - 70 TR
S&F in replacement Absolute HEPA filter of size 830 x 550 x 690mm having rated flow 2000 CFM, static pressure drop less than 25 mm of WG and efficiency more than 99.97 down to 0.3 micron, complete all as directed. Make - Thermadyne / Spectrum / Puromatic / Athlete
S&F in replacement Absolute HEPA filter of size 610x610x305mm having rated flow 2000 CFM, static pressure drop less than 25 mm of WG and efficiency more than 99.97 down to 0.3 micron, complete all as directed. Make - Thermadyne / Spectrum / Puromatic / Athlete
S&F in replacement Absolute HEPA filter of size 610x305x305mm having rated flow 1000 CFM, static pressure drop less than 25 mm of WG and efficiency more than 99.97 down to 0.3 micron, complete all as directed. Make - Thermadyne / Spectrum / Puromatic / Athlete
S&F in replacement, of MCCB 100 Amp, 3 pole thermal magnetic relese based with breaking capacity 36 KA, Ics = 100% Icu, with adjustable thermal magnetic setting alongwith spreader terminals (Thimble as per site requirement) and phase barries, taking down unserviceable one complete all as directed. Make- Siemens/ L&T/ Schneider Elect/ C&S
S&F in replacement, of MCCB 200 Amp, 3 pole thermal magnetic relese based with breaking capacity 36 KA, Ics = 100% Icu, with adjustable thermal magnetic setting alongwith spreader terminals (Thimble as per site requirement) and phase barries, taking down unserviceable one complete all as directed. Make- Siemens/ L&T/ Schneider Elect/ C&S
S&F in replacement, of MCCB 400 Amp, 3 pole thermal magnetic relese based with breaking capacity 50 KA, Ics = 100% Icu, with adjustable thermal magnetic setting alongwith spreader terminals (Thimble as per site requirement) and phase barries, taking down unserviceable one complete all as directed. Make- Siemens/ L&T/ Schneider Elect/ C&S
S&F in replacement, of MCB 63 Amp, - pole thermal magnetic relese based with breaking capacity 36 KA, Ics = 100% Icu, with adjustable thermal magnetic setting alongwith spreader terminals (Thimble as per site requirement) and phase barries, taking down unserviceable one complete all as directed. Make- Siemens/ L&T/ Schneider Elect/ C&S
Supply and fixing in repair to existing SCADA hardware system for control and monitoring of Package Air conditioner units (two packaging units in one room) alongwith communicating alarm status to the existing SCADA. The system shall have suitable number of digital inputs/ digital outputs/ analog inputs to operate all compressors in any AC packaging unit and to measure ambient room temperature. The augmented DDC system shall communicate with existing SCADA (Make of existing SCADA: RightWatts). The DDC must be having 01 Nos. isolated RS 485 communication port, 1 Nos. Ethernet communication port with 10BASE-T/ 100BASE-TX, shall support protocols such as Isolated serial link: Modbus master/slave, BACnet, MBUS and DNP 3.0 and supports ANSI/ISA 12-12-01, CSA C22.2 No 142, CSA C22.2 No 213, EN/IEC 61131-2:2007 standards, 230VAC with SIM and must have 256 DIDO Capability. The system shall comprise the items to give the following commands and perform following operations all as specified and directed by Engg -in-charge : (a) Remote ON/ OFF AC Packaging units (b) Programming logic enabling AC packaging units to operate based on time based logic or other conditional logic such as temperature, etc. (c) Record available alarms in the AC packaging units (d) Record package AC room ambient temperature The system shall comprise of the following units:
CERTIFICATION: DDC controller conforming to the following IEC certifications from an NABL approved laboratory.
- Conducted and Radiated Emission Test as per CISPR 22:2018
- Electrostatic discharge Test as per IEC 61000-4-2:2008
- Radiated Test as per IEC 61000-4-3-2010
- Immunity to fast Transients Test as per IEC 61000-4-42012
- RF field induced conducted disturbance Test as per IEC 61000-4-6:2013
- Power frequency IEC 61000-4-8
- Dry heat IEC 60068-2-30 (per cycle) and Damp Heat IEC 60068-2-30 (Per cycle)
- Dielectric strength cl.6.8 of IEC 61010-1
The controller platform shall have standard application programs that are modifiable to support both the traditional and specialized "sequence of operations".
Recharging of existing SIM connectivity for the period of 1 year with a reliable service provider, may be in e-sim, soft-sim or M2M sim. Any change leading to further workmanship on the field will be the responsibility of the contractor.
Supply and fixing in repair to existing SCADA software to augment control and monitoring application module for AC packaging unit, as follows: Must have user customizable dashboards and SLD (without any coding/ scripting) for AC packaging units Multi-site data viewing within same interface from all sites to single existing server. System must be accessible with adequate security with dual factor authentication with username/ password along with OTP on email. All device communication with the third party systems with must be secured using TLS/SSL encryption. System must work without any need of static IP. No static IP will be provided for any location. All screen development must show at least the basic monitoring, automation and controlling functionality for AC packaging unit within the actual layout of the campus. Periodic reporting shall be enabled according to the format decided by the engineer-in-charge. All runtime/ development licenses must be included in the above for creation and maintenance of the system. Note :- The comprehensive maintainence shall be done through OEMs of existing SCADA & Automation system. The contractor will have to submit MOU as provided in particular specifications from OEMS of SCADA & Automation system. ( OEM :- Rightwatts)
Localized SQL database (25CAL license) and User Interface including installation on local server; commissioning to receive the data via GPRS from the field controllers. Onboarding of localized SQL database and User Interface including installation on local server; commissioning to receive the data via GPRS from the field controllers The MS SQL must be a license from reliable vendor.
Functionality of SQL database to injest data and record periodic values and operations. a. The software shall record historical values of analog variables on a periodic basis and values of digital variables on an event basis (change of state). b. There shall be no limit by the operations software for the number of data values recorded in a historical collection. c. The software shall support recording of historical data on one or more files, defined by the user. d. The database files holding the historical values shall be stored on a periodical basis. Periodicity shall be a customizable value initially set to 1 week. This function shall be available when broadband internet is available.
Comprehensive service Providing/ reporting of HVAC operations system through OEM and OEM trained manpower for installed HVAC operations system augmented to AC packaging unit for the period of one year. The work includes: (1). Checking and validating all reporting on weekly basis (2). Response within 24 hours for any anomaly/ non-functional equipments. However, third party equipments breakdown service is not included in the timeline but is covered in the contract for the period of one year (3). Establishing communication between the DDCs based Panels and the SCADA Control center. (5). Uploading and downloading of logical programs from and to the DDCs (6). Issues with Manual / Remote operation from the DDCs based Panel / SCADA software. (7). The comprehensive maintainence shall be done through OEMs of existing SCADA & Automation system. The contractor will have to submit MOU as provided in particular specifications from OEMS of SCADA & Automation system. ( OEM :- Rightwatts)
Supply and Installation in repair rusted/ broken 1.6mm CRCA enclosures along with suitable number of cable glands, terminal blocks for installation of RTU and its connected accessories with color that shall be according to the site with permission of the Engg -in-charge all as specified and directed by Engg -in-charge.
Supply and Installation in repair of dual control option from panel such that the first option is timer/ remote and second option shall be Auto/Manual. Wiring shall be done such that Auto should lead to timer/ remote mode and manual point shall be provided to cut off the automation capability for local operations.
Supply and Installation in repair of the current sensors/ Rogowski coil/ current and voltage measuring mechanisms to measure electrical parameters for each of the package units.
Supply and Installation in repair of the miniature circuit breakers (MCBs) in the existing and new enclosures with proper mounting, connections using suitable number of terminal blocks. The MCB shall be 6A MCB DP, 230 V, 3KA breaking capacity all as specified and directed by Engg -in-charge
Supply and Installation in repair burnt out unservicable isolation transformers for remote terminal units and peripheral I/Os - 100VA Single Phase Isolation Transformer of the reputed make all as specified and directed by Engg -in-charge
Supply and Installation in repair of the suitable three pin plugs and sockets in the enclosures 6Amps all as specified and directed by Engg -in-charge
Supply, Installation, Testing and Commissioning in repair of GPRS Antenna for new and old remote terminal units with 2m standard cable. The said Antenna must the following specs: Type: Spring Type Extendable cable all as specified and directed by Engg -in-charge Gain: Min 9dB gain
Supply, retrofitting and Commissioning in repair of compatible digital input/ Output card - with 24 digital inputs; must have suitable high-speed communication with the parent DDC. Must be of the same make as DDCs. The cards shall be mounting with retrofitting arrangement inside the package AC Units. The arrangement shall be proper DIN arrangement and adjusted inside the units.
Supply, retrofitting and Commissioning in repair of compatible digital input/ Output card - with 16 digital outputs; must have suitable high-speed communication with the parent DDC. Must be of the same make as DDCs. The cards shall be mounting with retrofitting arrangement inside the package AC Units. The arrangement shall be proper DIN arrangement and adjusted inside the units.
Supply and fixing in repair 230V/ 24V DC SMPS complete all as specified and directed (Make: Omron, Meanwell) all as specified and directed by Engg -in-charge
Supply and Installation in repair of temperature sensor along with wiring to the DDC panel. The sensors will communicate with analog modules with room ambient temperature. The sensor must have Temperature Range: -40 to 70 deg C. Accuracy: Class A. Application: Industrial/ HVAC. The sensor shall be attached to a local controller to enable any automation application as specified and directed by Engg -in-charge.
Supply, Installation, Testing and Commissioning in repair of 4NC and 8 aux. contacts suitable for Chint contactor make in the existing enclosures of AC packaging units all as specified and directed by Engg -in-charge.
M&L for Earth continuity conductor fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 32 x 6 mm dia galvanised iron strip
Earthing complete with galvanised steel earth plate electrode 60×60×6 cm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to galvanised earth strip 32x6 mm dia by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion including provision of 40 mm GI Tubing, light grade and watering pipe shall be 20 mm bore GI light grade including excavation & earth work, PCC pit with CI cover, Charcol, salt, funnel, wire mesh, GI strip Up to 7.5 mtrs length complete all as specified and directed.
Supply installation testing and commissioning of MS Heavy "C" class 40 mm dai CHILLED/HOT water piping, painted with red oxide primer laid on floor/wall/roof including making hole on walls complete with tee,bends and supports and all accessories duly insulated with 40 mm PUF pipe sections insulation complete with 26 gauge Aluminium sheet cladding over pipe complete all as specified and as specified.
Iconic Engineers
Saini Enterprises
Flint India
RUCHIKA ENGG.WORKS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .