Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance | -0.07% | ₹8.4 L | L1 | Admitted-Finance |
| 2 | L2₹8.4 L+₹84.35 (0.01%)Admitted-Finance | -0.06% | ₹8.4 L+₹84.35 (0.01%) | L2 | Admitted-Finance |
| 3 | L3₹8.4 L+₹506.09 (0.06%)Admitted-Finance | -0.01% | ₹8.4 L+₹506.09 (0.06%) | L3 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹19,900
Closing Date
10 Jul 2026, 12:00 pmClosed
B.D.O. MARDAH GHAZIPUR
OFFICE B.D.O. MARDAH GHAZIPUR
KSHETRA PANCHAYAT MARDAH ME KARYALAY BHAWANO KA MARMMAT AND RANGAE PUTAE AADI KARY
2026_RDUP_1166247_5
457 date 03-07-2026
Open Tender
Civil Works
Percentage
90 days
mardah
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
B.D.O. MARDAH GHAZIPUR
₹19,900
Yes
11 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing plaster including disposal of refuse i/c all As per SI No. 706 | 1,961.1 | cum | 16 | ₹31,377.6 |
| 2 | Dismantling of cement concrete granolithic floor i/c all as per SI No. 697 and slab | 837 | cum | 40 | ₹33,480 |
| 3 | Concrete with 40mm gauge b/ballast fine sand of 1.25FM and cement in proportion of 12:6:1 in foundation and under floor i/c supply of all materials labour and T&P etc all complete as per SI No. 273 | 28.5 | cum | 4,060 | ₹1,15,710 |
| 4 | 12mm thick plastering in 1:4 cement and fine sand mortar i/c all complete as per SI No. 584 | 1,961.1 | cum | 165 | ₹3,23,581.5 |
| 5 | Finishing wall with water proof cement paint of approved make and quality on new work with (2coat) to give an even shed including supply of all material labour and T&P i/c required for proper completion of work as per SI No. 660+661 | 2,614.8 | SQM | 35 | ₹91,518 |
| 6 | Designing febricating testing installing and fixing in position curtain wall with aluminium composit panel cladding as per DSR 8.32 | 51.32 | SQM | 3,760.91 | ₹1,93,009.9 |
| 7 | Electricfication in all room i/c material labour with fan bulb etc. | 1 | SQM | 50,000 | ₹50,000 |
| 8 | Sign board and photography | 1 | JOB | 4,800 | ₹4,800 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_2187631.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .