| 1 | L1₹1.9 CrAccepted-AOC 157 5 K R GARDEN RAILWAY FEEDER ROAD VIRUDHUNAGAR 626 001 | VIRUDHUNAGAR | TAMIL NADU | 626001 | ₹1.9 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.9 Cr+₹1.9 L (1.00%)Rejected-Finance | ₹1.9 Cr+₹1.9 L (1.00%) | L2 | Rejected-Finance Highest rate |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
8 May 2023, 11:00 amClosed
Project Director,DRDA, Virudhunagar
DRDA, Collectorate, Virudhunagar
Upgradation-Strengthening and 5 Years Routine Maintenance of Roads- 3 nos.in Package no. MGSMT-49-2022-23 at Virudhunagar Block of Virudhunagar District under MGSMT-2022-23.
2023_RDTN_300713_51
DIPR/2018/Tender/2023
Open Tender
Civil Works - Roads
Works
180 days
Virudhunagar Block
Two Cover System. Refer tender document
5 documents required · 5 mandatory
₹0
₹1.9 L
DRDA, Collectorate, Virudhunagar
1 Jun 2023
22 Apr 2023
8 May 2023
22 Apr 2023
8 May 2023
30 Apr 2023
30 Apr 2023
Amount
Part-1:- V.Sundaralingapuram to Ramco Cement Link Road at Veerarpatti
Part-A:- Upgradation work
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking Existing old Bt surface upto 50 to 100cm thick include all cost and conveyance of amterials etc., complete
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Applying Prime coat over WBM/WMM @ 7.00Kg SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious Macadam of compacted 50mm thickness using 0.20 cum of 26.50-13.20mm, 0.43cum of 13.2-2.36mm, 0.26 cum of 2.36mm and Below with 50.3 kgs of VG30/VG40 heating the bitumen and 4.02 Kgs of Waste Plastic for 10sqm including premixing at CMP, conveyance by tipper lorry, laying by paver finisher and rolling by Vibratory Roller including cost and conveyance of all materials, hire charges of all T&P all labour charges, fuel and and all other incidental charges etc., Complete as per specification using CMP as per clause 508 of MORTH Rev-5
BITUMINOUS CONCRETE USING cmp (Grade-II) Providing and laying Bituminious concrete using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 include 8% plastic waste heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous surface
Road Marker/ Road stud with lens Reflector
CD Work:- Construction of 1.50Mt span Culvert (ch @ 815m)
Earth work excavating and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders (SS20B) etc., complete in all respects as directed by the departmental officers.
Filling with clean good course sand including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Cement concrete 1:3:6 (One of cement, three of sand and six of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.
Cement concrete 1:2:4 (One of cement, two of sand and four of hard broken stone) using 20mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Reinforced Cement concrete 1:1½:3 (One of cement, one and half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects
Supplying, fabricating and placing Ribbed Tor steel rods for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications-AGL
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications-BGL
Guard Stone 0.15 x 0.15 x 0.90m
CD Work-2: Construction of 3 M span Culvert (ch @ 375m)
Earth work excavating and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders (SS20B) etc., complete in all respects as directed by the departmental officers.
Filling with clean good course sand including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Cement concrete 1:3:6 (One of cement, three of sand and six of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.
Cement concrete 1:2:4 (One of cement, two of sand and four of hard broken stone) using 20mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Reinforced Cement concrete 1:1½:3 (One of cement, one and half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects
Supplying, fabricating and placing Ribbed Tor steel rods for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications-AGL
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications-BGL
Guard Stone 0.15 x 0.15 x 0.90m
Protective Work-1:- Construction of Retaining wall from 150-180m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10
Providing Weep Holes
Providing Hectametre stone of size 0.90mx0.15mx0.15m
Providing caution board
Providing Rumble Strips
Providing Name Board cum Citizen Board
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part-2:- Melamadai -Palavanatham road to Pottalpatty
Part-A:- Strengthening work
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking Existing old Bt surface upto 50 to 100cm thick include all cost and conveyance of amterials etc., complete
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Applying Prime coat over WBM/WMM @ 7.00Kg SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious Macadam of compacted 50mm thickness using 0.20 cum of 26.50-13.20mm, 0.43cum of 13.2-2.36mm, 0.26 cum of 2.36mm and Below with 50.3 kgs of VG30/VG40 heating the bitumen and 4.02 Kgs of Waste Plastic for 10sqm including premixing at CMP, conveyance by tipper lorry, laying by paver finisher and rolling by Vibratory Roller including cost and conveyance of all materials, hire charges of all T&P all labour charges, fuel and and all other incidental charges etc., Complete as per specification using CMP as per clause 508 of MORTH Rev-5
BITUMINOUS CONCRETE USING cmp (Grade-II) Providing and laying Bituminious concrete using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 include 8% plastic waste heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous surface
Road Marker/ Road stud with lens Reflector
CD Work-1:- Construction of 1.50 M span Culvert (ch 735)
Earth work excavating and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders (SS20B) etc., complete in all respects as directed by the departmental officers.
Filling with clean good course sand including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Cement concrete 1:3:6 (One of cement, three of sand and six of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.
Cement concrete 1:2:4 (One of cement, two of sand and four of hard broken stone) using 20mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Reinforced Cement concrete 1:1½:3 (One of cement, one and half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects
Supplying, fabricating and placing Ribbed Tor steel rods for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications-AGL
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications-BGL
Guard Stone 0.15 x 0.15 x 0.90m
CD Work-2:- Constructios of 1.50 M span Culvert (ch 960)
Earth work excavating and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders (SS20B) etc., complete in all respects as directed by the departmental officers.
Filling with clean good course sand including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Cement concrete 1:3:6 (One of cement, three of sand and six of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.
Cement concrete 1:2:4 (One of cement, two of sand and four of hard broken stone) using 20mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Reinforced Cement concrete 1:1½:3 (One of cement, one and half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects
Supplying, fabricating and placing Ribbed Tor steel rods for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications
Guard Stone 0.15 x 0.15 x 0.90m
Providing Hectametre stone of size 0.90mx0.15mx0.15m
Providing Kilometer stone of size 0.90mx0.15mx0.15m
Providing caution board
Providing Name Board cum Citizen Board
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part-3:- Pottalpatty - Arasakudumbanpatti road
Part-A:- Strengthening work
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Picking Existing old Bt surface upto 50 to 100cm thick include all cost and conveyance of amterials etc., complete
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Applying Prime coat over WBM/WMM @ 7.00Kg SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious Macadam of compacted 50mm thickness using 0.20 cum of 26.50-13.20mm, 0.43cum of 13.2-2.36mm, 0.26 cum of 2.36mm and Below with 50.3 kgs of VG30/VG40 heating the bitumen and 4.02 Kgs of Waste Plastic for 10sqm including premixing at CMP, conveyance by tipper lorry, laying by paver finisher and rolling by Vibratory Roller including cost and conveyance of all materials, hire charges of all T&P all labour charges, fuel and and all other incidental charges etc., Complete as per specification using CMP as per clause 508 of MORTH Rev-5
BITUMINOUS CONCRETE USING cmp (Grade-II) Providing and laying Bituminious concrete using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 include 8% plastic waste heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous surface
Road Marker/ Road stud with lens Reflector
Providing Hectametre stone of size 0.90mx0.15mx0.15m
Providing caution board
Providing sign board
Chevron signs 90 cm Octogon(Curves)
Providing Name Board cum Citizen Board
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R SEENIVASAGAM
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .