Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Updated dates
Cancellation of Tender
Cancellation of Tender
All bids rejected in technical evaluation
cancelled_1.pdf
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
13 Apr 2026, 11:00 amClosed
Executive Engineer EGD Matatila Power house Lalit
Executive Engineer EGD Matatila Power house Distt Lalitpur UP PIN 284136
(Part A)- Supply and laying of stone ballast (gravels) and copper earth strips in SY at MPH. (Part B)- Construction and foundation of structure for lightning arrestor at MPH
2026_UPJVN_1121498_1
47/EGD/2025-26
Open Tender
Electrical Works
120 days
Office of Executive Engineer EGD Matatila Power h
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Yes
Executive Engineer EGD Matatila Power house Lalit
₹20,000
Yes
2 Jun 2026
28 Feb 2026
13 Apr 2026
28 Feb 2026
13 Apr 2026
28 Feb 2026
Part A: Supply & laying of stone ballast (gravels) and Supply & Laying of copper earth strips in switchyard at Matatila Hydro Power Station, Distt. Lalitpur. 1. Removal of old stone ballast & cleaning the area (1312.32m2) of displaced stone ballast at switchyard of MPH Which shall include a. Removal of stone ballast in switchyard. b. Cleaning the area of displaced stone ballast. c. Removal of bushes, grass and roots from switchyard. 2. Supply & laying of coarse sand (26.25 cum) and old stone ballast in switchyard of MPH Which shall include a. Sprinkle the Anti-vegetation chemicals (20L) in two layers to stop the growth of bushes, grass and roots. b. Supply & laying of coarse sand (26.25 cum). c. Laying the old stone ballast in switchyard 3. Supply and Laying of New stone ballast (157.48 cum) in switchyard of MPH. Which shall include a. Supply of new 40mm stone ballast (157.48 cum). b. Laying of new stone ballast in switchyard. 4. Supply & Laying of copper earth strip 40mmx6mm (35 mtr) & 25mmx5mm (156 mtr) in MPH. Which shall include a. Supply & Laying of copper earth strip 40mmx6mm (35 mtr) for earthing of 2MVA 1st Transformer to GT 1st & 2MVA 2nd Transformer to GT 3rd. b. Supply & Laying of copper earth strip 25mmx5mm (156 mtr) for proper earthing of 09 Nos. 66KV SF6 breakers, 05Nos. Isolators, 09 Nos. CTs structures and GT 1st ,2nd & 3rd, 2MVA 1st & 2nd to Gantry. 5. Painting of gantry, structure & panels in switchyard of MPH. Which shall include a. All surface shall be cleaned thoroughly with Wire Brush, Emery Paper. b. Painting of front side gantry, breaker & PT structure and Panels with one coat of best quality metal paint (681.22 sqm out of 1430.01 sqm) c. Painting of back side gantry, isolator & CT structure with one coat of best quality red oxide primer on complete surface (748.79 sqm out of 1430.01 sqm). d. Painting of back side gantry, isolator & CT structure with two coats of best quality metal paint (748.79 sqm out of 1430.01 sqm).
Part B: Construction & foundation of structure for lightning arrestor of 2MVA 1st Transformer along with Fixing & Commissioning of lightning arrestor in switchyard at Matatila Hydro Power Station, Distt. Lalitpur. 1. Excavation for foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (2 cum) 2. CC work with 4cm gauge stone ballast, coarse sand & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc required for proper completion. (0.2 cum) 3. CC work with 4cm gauge approved hard stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour, side shuttering if required and T&P etc. required for proper completion of work. (1.09 cum) 4. Mild Steel or Iron work in heavy sizes as per approved design, fabricated to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (0.282 mt) 5. Erection & Commissioning of 2MVA 1st Transformer Lighting Arrestor in switchyard (01 Job). Which shall include a. Fixing of LA on top of structure. b. Proper Earthing of LA using copper strip. c. Connection of LA with HT Line & 2MVA 1st Transformer using ACSR conductor & clamps.
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.67 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2086805.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid