Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹17.0 L+₹24,390.60 (1.46%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.S.ENTERPRISES L1 | M.B. Enterprises L2 |
|---|---|---|---|---|---|
| 1.01 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 2 | Jobs | 1,92,390 ₹2,27,020.2 Lowest | 1,98,000 ₹2,33,640 |
| 1.02 | Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 2 | Jobs | 71,390 ₹84,240.2 Lowest | 72,000 ₹84,960 |
| 1.03 | eplacement of salica gel. | 2 | Jobs | 7,200 ₹8,496 Lowest | 7,380 ₹8,708.4 |
| 1.04 | Repairing of tape changer | 1 | Jobs | 24,500 ₹28,910 Lowest | 24,570 ₹28,992.6 |
| 1.05 | Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same. | 2 | Jobs | 47,190 ₹55,684.2 Lowest | 47,700 ₹56,286 |
| 1.06 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine. | 2 | Jobs | 83,490 ₹98,518.2 Lowest | 83,700 ₹98,766 |
| 1.07 | Repairing of LT Copper bolt and Pam, remettaling and finishing the same as per original shape and size | 12 | Jobs | 2,64,000 ₹3,11,520 Lowest | 2,70,000 ₹3,18,600 |
| 1.08 | Filling of T/oil to up to top up level as required to make power | 836 | Ltrs | 1,24,146 ₹1,46,492.28 Lowest | 1,24,146 ₹1,46,492.28 Lowest |
| 1.09 | P/Fixing of winding protection pad | 2 | Sets | 54,450 ₹64,251 Lowest | 55,800 ₹65,844 |
| 1.10 | Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the leakage | 16 | Jobs | 2,42,000 ₹2,85,560 Lowest | 2,44,800 ₹2,88,864 |
Tender Value
Refer Docs
EMD Value
₹33,600
Closing Date
21 Jan 2026, 3:15 pmClosed
EE ENM M-4
DELHI JAL BOARD SECTOR 15 ROHINI
Repairing and overhauling of 2 No 2500 KVA transformer at Sec 11 Rohini BPS Rithala constituency in AC 06
2026_DJB_284790_23
NIT No. 22(2025-26)M-4
Open Tender
Miscellaneous Works
Item Rate
60 days
EE ENM M-4
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹33,600
Yes
27 Jan 2026
13 Jan 2026
21 Jan 2026
13 Jan 2026
21 Jan 2026
13 Jan 2026
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc.
Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage.
eplacement of salica gel.
Repairing of tape changer
Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same.
Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine.
Repairing of LT Copper bolt and Pam, remettaling and finishing the same as per original shape and size
Filling of T/oil to up to top up level as required to make power
P/Fixing of winding protection pad
Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the leakage
Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site as required
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
Insulating the bus bar with epoxy paint
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_376762.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .