| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-Finance | ₹16.0 L | L1 | Accepted-Finance Below rate quoted |
| 2 | L2₹16.0 LRejected-Finance DOOR NO 7 121 KUDAL NAGAR KUDAL NAGAR KUTTALAM PATTI 626101 | VIRUDHUNAGAR | TAMIL NADU | 626101 | ₹16.0 L | L2 | Rejected-Finance Above rate quoted |
| Sl No | Description | Qty | Unit | KIRUTHIKA CONSTRUCTION L1 | Mani M L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Providing Cement Concrete Pavement Road in Taluk Office Approach Road in Kilpennathur Block | |||||
| 1.01 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 29.97 | Cu.m | 128 ₹3,836.16 | 129 ₹3,866.13 |
| 1.02 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 38.85 | Cu.m | 1,922 ₹74,669.70 | 1,924 ₹74,747.40 |
| 1.03 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, conso | 84.36 | Cu.m | 5,437 ₹4.6 L | 5,438 ₹4.6 L |
| 1.04 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened | 222 | Sq.m | 360 ₹79,920 | 361 ₹80,142 |
| 1.05 | Plain Cement Concrete 1:2:4 mix (One Cement, Four M.Sand and eight hard broken stone jelly) using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 108.23 | Cu.m | 6,730 ₹7.3 L | 6,730 ₹7.3 L |
| 1.06 | Provision for Bitumen Pad (12mm thick) including cost & conveyance etc,. | 15 | Sq.m | 478 ₹7,170 | 479 ₹7,185 |
| 1.07 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,43,477 ₹2.4 L | 2,43,554 ₹2.4 L |
Tender Value
₹16.1 L
EMD Value
₹16,130
Closing Date
27 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPEMENT OFFICER (B.PT
THE BLOCK DEVELOPEMENT OFFICE,KILPENNATHUR
CONSTRUCTION OF CEMENT CONCRETE PAVEMEMNT ROAD TALUK OFFICE APPROACH ROAD AT KILPENNATHUR BLOCK
2026_RDTN_661799_1
ROC.NO.A5/1899115/2024 DT.06.02.2026 _03
Open Tender
Civil Works - Roads
KILPENNATHUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,130
Yes
27 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, conso
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened
Plain Cement Concrete 1:2:4 mix (One Cement, Four M.Sand and eight hard broken stone jelly) using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Provision for Bitumen Pad (12mm thick) including cost & conveyance etc,.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
TD3.pdf
Tender Documents • 1.04 MB
BOQ_794372.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid