| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.8 CrAccepted-AOC | ₹10.8 Cr | L-1 | Accepted-AOC L-1 Bidder |
| 2 | L-2₹10.9 CrRejected-Finance | ₹10.9 Cr | L-2 | Rejected-Finance Rejected (Other than L-1 bidder) |
| 3 | L-3₹11.6 CrRejected-Finance | ₹11.6 Cr | L-3 | Rejected-Finance Rejected (Other than L-1 bidder) |
| 4 | L-4₹11.6 CrRejected-Finance | ₹11.6 Cr | L-4 | Rejected-Finance Rejected (Other than L-1 bidder) |
| 5 | L-5₹11.8 CrRejected-Finance | ₹11.8 Cr | L-5 | Rejected-Finance Rejected (Other than L-1 bidder) |
| Sl No | Description | Qty | Unit | SARINS L4 | Balwan Builders L5 | M/S TSEWANG ENTERPRISES L3 | MS S T ENTERPRISES L2 | MS SHAMBHALA TRADERS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00BUILDINGS & STRUCTURE (Sch 'A' PART-I) | ||||||||
| 1.01 | Lump sum price worked out by the Contractor for “BUILDINGS & STRUCTURE” as listed in Schedule ‘A’ Part-I.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 9,78,50,400.00 inserted by the MES in Schedule ‘A’ Part-I. | 1 | LUMP SUM | 10,86,13,944 ₹10.9 Cr | 11,14,47,856 ₹11.1 Cr | 10,87,50,120 ₹10.9 Cr | 10,25,00,000 ₹10.3 Cr | 10,18,18,860 ₹10.2 Cr |
| 2.00EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | ||||||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 72,221.12 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 72,221.12 ₹72,221.12 | 1,00,000 ₹1 L | 1,35,000 ₹1.4 L | 80,000 ₹80,000 | 75,000 ₹75,000 |
| 3.00INTERNAL WATER SUPPLY (Sch 'A' PART-III) | ||||||||
| 3.01 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 3,06,337.72 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 6,12,675.44 ₹6.1 L | 4,50,000 ₹4.5 L | 4,85,000 ₹4.8 L | 5,15,000 ₹5.2 L | 5,00,000 ₹5 L |
| 4.00INTERNAL ELECTRIFICATION (Sch 'A' PART-IV) | ||||||||
| 4.01 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 27,89,399.25 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 39,05,158.95 ₹39.1 L | 40,00,000 ₹40 L | 36,11,500 ₹36.1 L | 35,50,000 ₹35.5 L | 35,00,000 ₹35 L |
| 5.00EXTERNAL WATER SUPPLY (Sch 'A' PART-V) | ||||||||
| 5.01 | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 13,248.75 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 26,497.5 ₹26,497.50 | 25,000 ₹25,000 | 22,000 ₹22,000 | 27,000 ₹27,000 | 25,000 ₹25,000 |
Tender Value
₹9.4 Cr
EMD Value
₹8.0 L
Closing Date
20 Dec 2024, 6:00 pmClosed
CE SILIGURI ZONE
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA, DIST JALPAIGURI, PIN 734 008 (WB)
PROVN OF SINGLE LIVING ACCN FOR HAVS AND ORS AT DAHUNG UNDER GE TENGA
2024_MES_673094_2
98770-A/TENGA/SZ/E8
Open Tender
Civil Works
780 days
DAHUNG, TENGA
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE TENGA
₹8.0 L
Yes
27 Feb 2026
22 Nov 2024
27 Dec 2024
22 Nov 2024
20 Dec 2024
6 Dec 2024
22 Nov 2024 - 30 Nov 2024
Amount
BUILDINGS & STRUCTURE (Sch 'A' PART-I)
Lump sum price worked out by the Contractor for “BUILDINGS & STRUCTURE” as listed in Schedule ‘A’ Part-I. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 9,78,50,400.00 inserted by the MES in Schedule ‘A’ Part-I.
EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II)
Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 72,221.12 inserted by the MES in Schedule ‘A’ Part-II.
INTERNAL WATER SUPPLY (Sch 'A' PART-III)
Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-III. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 3,06,337.72 inserted by the MES in Schedule ‘A’ Part-III.
INTERNAL ELECTRIFICATION (Sch 'A' PART-IV)
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-IV. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 27,89,399.25 inserted by the MES in Schedule ‘A’ Part-IV.
EXTERNAL WATER SUPPLY (Sch 'A' PART-V)
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-V. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 13,248.75 inserted by the MES in Schedule ‘A’ Part-V.
EXTERNAL ELECTRIFICATION (Sch 'A' PART-VI)
Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-VI. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 3,07,206.87 inserted by the MES in Schedule ‘A’ Part-VI.
LIGHTNING PROTECTION (Sch 'A' PART-VII)
Lump sum price worked out by the Contractor for “LIGHTNING PROTECTION” as listed in Schedule ‘A’ Part-VII. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 2,90,044.80 inserted by the MES in Schedule ‘A’ Part-VII.
SOLAR WATER HEATER (Sch 'A' PART-VIII)
Lump sum price worked out by the Contractor for “SOLAR WATER HEATER” as listed in Schedule ‘A’ Part-VIII. Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 4,76,400.96 inserted by the MES in Schedule ‘A’ Part-VIII.
MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (Sch 'A' Part-IX)
INTERNAL WATER SUPPLY S & F two way Bib taps , 15/16 mm bore, fancy type, chromium plated, cast copper alloy with crutch or butterfly handle, screwed down, screwed for iron pipe or for brass ferrule and fixed complete all as specified and directed.
INTERNAL ELECTRIFICATION S & F 3-star (EEL) T-shape lamp capable delivering 1000 lumen having luminous efficacy of > 100 lm/W, starting time < 0.5 s, CRI > 80, CCT 6500K, PF>0.9, input voltage range 140- 270 V, input frequency 50- 60 Hz and B22 socket complete all as specified and directed.
Supply and fixing load line distribution board TPN vertical, 6 way, double door type, fixed on wall semi flush with incoming MCCB 4 poles 250 Amps, 16 KA, busbars , neutral link, blanking plates complete all as specified and directed. NOTE : Outgoing MCBs shall be measured and paid separately.
S & F moulded case circuit breaker (MCCB) 80A, 4P, 16KA with thermal magnetic trip unit (TMD), compression lug connectors, protection against overloads (Ir adjustable from 0.7- 1 X In), protection against short circuits (Isd adjustable from 5- 10 X Ir), inbuilt encapsulated double break roto active type instanteneous protection, earth fault leakage protection, etc. having Ics = 100% = Icu = 16 kA as per IEC 60947-2 and suitable for 3-Phase, 415 V, 50 Hz electric supply complete all as specified and directed.
FIRE FIGHTING M&L for construction of fire point structure complete for housing of fire bucket 2 Nos., fire extinguisher - 2 Nos., fire biter -1 No. and fire hook - 1 No. complete all as specified and directed.
MS S T ENTERPRISES (BID ID -3185367)
M/S TSEWANG ENTERPRISES (BID ID -3187206)
SARINS (BID ID -3187910)
Balwan Builders (BID ID -3193777)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.rar
Tender Documents • 13.07 MB
BOQ.xls
BOQ • 0.33 MB
Tenderdocument_2.rar
Tender Documents • 15.50 MB
Tenderdocument.pdf
Tender Documents • 2.41 MB
Download all tender documents and submit your bid