Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
15 Jul 2026, 3:00 pm
Superintending Engineer, North Circle, GAP Wing
Superintending Engineer, North Circle, GAP Wing, Water and Sanitation Sector, KMDA, Unnayan Bhawan, Block D
Installation of Chlorination unit in Rejuvenated STPs (01 WSP and 01 ASP) at Bhatpara Municipal Town, North 24 Parganas District, West Bengal along with 05 (Five) year Operation and Maintenance Period under Namami Gange Mission-II
2026_KMDA_1027200_1
KMDA/WS/GAP/SE(N)/NIT-01/26-27
Open Tender
CIVIL AND ELECTRICAL WORKS
450 days
Bhatpara
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.7 L
Superintending Engineer, North Circle, GAP Wing
15 Jun 2026
15 Jun 2026
17 Jul 2026
15 Jun 2026
15 Jul 2026
15 Jun 2026
15 Jun 2026 - 22 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Disinfection Module (Part A) Construction & Installation of Chlorination Units for 10.00 MLD & 9.50 MLD STP under Bhatpara Municipal area | ||||||
| 1.01 | (1) (a) Civil Work
Construction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room and all allied works related with Disinfection Modules for rejuvenation of 10.00 MLD Waste Stabilization Pond (WSP) | 1 | Job | - | - | 1 |
| 1.02 | (b) Civil Work
Construction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room and all allied works related with Disinfection Modules for rejuvenation of 9.50 MLD
Activated Sludge Process (ASP). | 1 | Job | - | - | 2 |
| 1.03 | 2) (a) Electro-mechanical Work: Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory works for Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for 10.00 MLD Waste Stabilization Pond (WSP) . | 1 | Job | - | - | - |
| 1.04 | (b) Electro-mechanical Work:Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory worksfor Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for 9.50 MLD Activated Sludge Process (ASP). | 1 | Job | - | - | - |
| 2Disinfection Module (Part B) Operation and Maintenance (Non-Power) of Chlorination units include (Manpower cost , All Material & Chemicals cost , Repairs and Replacement for both, all the Civil and E&M work cost , all necessary consumables cost etc.) for treatment up to Threshold Flow ( For 10 MLD WSP=7.00 MLD & 9.5 MLD ASP=2.00 MLD) at 10 MLD & 9.5 MLD STP for 05 years, excluding GST. | ||||||
| 2.01 | 1st year | - | Year | - | - | - |
| 2.02 | 2nd year | - | Year | - | - | - |
| 2.03 | 3rd year | - | Year | - | - | - |
| 2.04 | 4th year | - | Year | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.27 MB
BID_DOCUMENT.pdf
Tender Documents • 8.23 MB
BOQ_2523342.xls
BOQ • 0.33 MB
Form1.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid