| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L1 | Accepted-AOC L1-Accepted | |
| 2 | L2₹36.4 L+₹1.6 L (4.65%)Rejected-Finance BIBIGRAM SOUTH NEAR JALALIA GIRLS HIGH SCHOOL MALDA ENGLISHBAZAR 732101 | ENGLISHBAZAR | MALDA | WEST BENGAL | 732101 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹38.6 L+₹3.8 L (11.0%)Rejected-Finance BANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹71,800
Closing Date
19 Dec 2023, 2:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operation and maintenance of Intake Pumping Arrangement, (11/0.433KV sub-station , 800KVA transformer ) and other electro-mechanical accessories at Intake Point (Sultanpur ) of Southern Sector under Malda Arsenic Area Water Supply Scheme,(Phase-I
2023_PHED_610443_12
WBPHED/EE/MLMD/NIeT_25 of 2023-24
Open Tender
Electrical Work/ Equipment
Item Rate
366 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹71,800
Yes
10 Sept 2025
4 Dec 2023
21 Dec 2023
4 Dec 2023
19 Dec 2023
4 Dec 2023
Amount
PART-A Daily operation and upkeepment of 3 nos Vertical Wet Pit Pumping Machinery having capacity 1306 cum/hr at a head of 42.5 m coupled with 250 KW Vertical Solid Shaft Induction motor , Valves, Actuator Controlled butterfly valves, Air release valve, Level sensing arrangement, Vibration Monitoring System, Power distribution panel and Motor Control Centre etc.comlete as per instruction and satisfaction of EIC on round the clock basis ( Three shift operation) by engaging experienced operator, electrician, helper including switching ON/OFF of the Indoor, Bridge and Outdoor Luminaires & other accessories as & when required and sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation
ESIC Contribution of Empleyers for SL NO 1.0 (@3.25%)
EPF Contribution of Empleyers for SL NO 1.0(@13%)
Daily operation and upkeepment of 11/0.433KV, 800 KVA distributed Sub-station having 1 no. single panel VCB ( Old One) , One no. 7-12 KV,11±1% KV,800 KVA standard design AVR with 11 KV isolating panel, 1 No. 11/0.433 800 KVA resin cast transformer ( Old one) at one part and 1 no. three panel VCB ( newly installed), 1no. 11/0.433 KV, 800 KVA ONAN transformer ( new one) on another part with exposed/underground HT and MV cables, C.T.,P.T.,L.T. Panel , Battery Charger, wireless instruments etc. complete & all other electrical Accessories and Ancillaries as per instruction and satisfaction of EIC during working hours daily ( restricted to max. 20 hours of operation as per design of the scheme) including checking of healthly condition of all draw out feeders daily by Electrician having valid and approprite License (Workmans' Permit), issued by Directorate of Electricity(Licensing Board), Govt. of W.B. or of any other state Govt. of India or by person having ITI(Electrician) Certificate & findings to be recorded in the log Book and switching ON/OFF of the Indoor and Outdoor Luminaires & other accessories as & when required and sweeping of the sub-station building complex on daily-basis.
ESIC Contribution of Empleyers for SL NO 2.0 (@3.25%)
EPF Contribution of Empleyers for SL NO 2.0 (@13%)
PART-B
Periodial inspection, thrice in a month, by Electrical supervisor having valid Supervisors' certificate of competency from Directorate of Electricity( Licensing Board), Govt. of West Bengal or under any other State Govt. of India along with Pump Technician/ Supervisor. Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House Building. The Supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy / fault free operational condition of each equipment i.e. ACBs L.T.PDB, capacitors,pumps, valves, Acuators Relays, Contactors, Timers, SFU along with in house light system .
Cleaning of contacts by CRC 226 spray in the MCC Panel Board, cleaning of all Terminal Sockets, Coils, greasing of Pump & Motor bearings, filling up lubricating oil, change of gland packing, etc along with minor repairing (if required) of the electro mechanical equipments by supplying necessary sundry materials/electro mechanical accessories as required , once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the log book with date
Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt meter etc. and testing of all relays, LT & HT breakers, earthing arrangement system including testing of transformer & AVR oil by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit, twice in a year (preferably in the month of December and June) and submission of the test report in duplicate to Department in each case as required and as per direction of EIC.
ADD Cess @ 1%
HANNAN BUILDERS PRIVATE LIMITED
NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .