| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 CrAccepted-AOC 201 PLOT NO 32 SHALAKA BLDG TPS II JUHU ROAD SANTACRUZ WEST MUMBAI SUBURBAN MAHARASHTRA 400054 | MUMBAI SUBURBAN | MAHARASHTRA | 400054 | ₹7.8 Cr | 1 | Accepted-AOC Being L1. |
| 2 | 2₹7.8 Cr+₹5.4 L (0.70%)Rejected-Finance | ₹7.8 Cr+₹5.4 L (0.70%) | 2 | Rejected-Finance Being L2. |
| 3 | 3₹7.9 Cr+₹16.0 L (2.06%)Rejected-Finance 6 NEW SADGURU NANIK INDUSTRIAL ESTATE OFF WESTERN EXPRESS HIGHWAY GOREGAON E MUMBAI 400063 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400063 | ₹7.9 Cr+₹16.0 L (2.06%) | 3 | Rejected-Finance Being L3. |
| 4 | 4₹8.3 Cr+₹59.2 L (7.64%)Rejected-Finance 1109 11TH FLOOR SPAZE I TECH PARK SECTOR 49 SOHNA ROAD GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | ₹8.3 Cr+₹59.2 L (7.64%) | 4 | Rejected-Finance Being L4. |
| 5 | 5₹8.8 Cr+₹1.0 Cr (12.9%)Rejected-Finance 16A 1 EARLE STREET FLAT N 1 FIRST FLOOR KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | ₹8.8 Cr+₹1.0 Cr (12.9%) | 5 | Rejected-Finance Being L5. |
Tender Value
₹8.9 Cr
Closing Date
15 Apr 2021, 6:00 pmClosed
AGM(E-E)
O/o AGM(E-E), AMED, Operational Office, AAI, Chennai Airport, Chennai.
Operation of Baggage Handling System (Make - Pteris Global) at Chennai Airport (Year 2021-2024).
2021_AAI_74666_1
AAI/CHE/AMED-XI/2020/03
Open Tender
Electrical Works
Item Rate
1095 days
Chennai
As per e-NIT
12 documents required · 12 mandatory
₹1,680
Yes
Exempted
28 May 2021
30 Mar 2021
19 Apr 2021
31 Mar 2021
15 Apr 2021
31 Mar 2021
31 Mar 2021 - 6 Apr 2021
Amount
PHASE-I: FIRST YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-L on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per site requirement for the following and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Departure, Mezzanine and at Basement. (ii) Clearing Overheight and Overlength baggages and resetting the system at Mezzanine Floor. (iii) Identification of dieback and restarting of system at Basement,Mezzanine Floor and Departure level. (Note: The manpower details and details scope of work will be as per SCC. The quoted rate shall be exclusive of GST, EPF, ESI & Bonus)
Domestic Terminal-1 - First Year
International Terminal-4 - First Year
International Terminal-3 - Arrival - First Year
PHASE-II: SECOND YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-L on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per site requirement for the following and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Departure, Mezzanine and at Basement. (ii) Clearing Overheight and Overlength baggages and resetting the system at Mezzanine Floor. (iii) Identification of dieback and restarting of system at Basement,Mezzanine Floor and Departure level. (Note: The manpower details and details scope of work will be as per SCC. The quoted rate shall be exclusive of GST, EPF, ESI & Bonus)
Domestic Terminal-1 - Second Year
International Terminal-4 - Second Year
International Terminal-3 - Arrival - Second Year
PHASE-III: THIRD YEAR Ensuring smooth & un-interrupted Operation of Baggage handling system for continuous flow of Baggage movement by deploying manpower as tabulated in Annexure-L on round the clock basis (3 Shift X 8 Hours) on all days including sundays / holidays as per site requirement for the following and as per the directions of Engineer-In-Charge: (i) Identification, Clearing Bag Jam and Resetting the system at Departure, Mezzanine and at Basement. (ii) Clearing Overheight and Overlength baggages and resetting the system at Mezzanine Floor. (iii) Identification of dieback and restarting of system at Basement,Mezzanine Floor and Departure level. (Note: The manpower details and details scope of work will be as per SCC. The quoted rate shall be exclusive of GST, EPF, ESI & Bonus)
Domestic Terminal-1 - Third Year
International Terminal-4 - Third Year
International Terminal-3 - Arrival - Third Year
FOR ALL PHASES: Providing manpower to attend any urgent/emergency work etc. as and when required and as per the direction of E-I-C. (The quoted rate shall be exclusive of GST, EPF, ESI & Bonus).
Highly-Skilled Labour
Semi-Skilled Labour
CHENNAI ENGINEERING SERVICES
PREMIER ENGINEERING TECHNICS PVT. LTD.
Three D Integrated Solutions Ltd
GANNON DUNKERLEY AND CO LTD
Swati Airport Support Services Pvt Ltd
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .