Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
29 Sept 2026, 12:00 pm7d left
E.E. Construction Division-2, P.W.D. Jaunpur
E.E. Construction Division-2, P.W.D. Jaunpur
Construction work Office of the Executive Engineer, C.D.2, P.W.D., Jaunpur Building Extension.
2026_CEUVZ_1185962_1
2492/4A date 27-08-2026
Open Tender
Civil Works
Fixed-rate
180 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹2.8 L
Yes
15 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. (Including all taxes, labour cess etc but excluding GST) | 100 | CUM | 190 | ₹19,000 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Including all taxes, labour cess etc but excluding GST) | 24.51 | CUM | 510 | ₹12,499.46 |
| 3 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to eithe.r re-design the mix or bear the cost of extra cement. Concrete of M10 grade with minimum cement content of 220 kg /cum (Including all taxes, labour cess etc but excluding GST) | 10.25 | CUM | 6,490 | ₹66,522.5 |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. (Including all taxes, labour cess etc but excluding GST) | 8.16 | CUM | 1,560 | ₹12,735.45 |
| 5 | Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete. (Including all taxes, labour cess etc but excluding GST) | 81.64 | SQM | 227 | ₹18,531.71 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) R.C.C. work in Plinth Band (Including all taxes, labour cess etc but excluding GST) | 11.4 | CUM | 6,648 | ₹75,787.2 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (Including all taxes, labour cess etc but excluding GST) | 15 | CUM | 8,456 | ₹1,26,840 |
| 8 | TMT Fe-500 iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. (Including all taxes, labour cess etc but excluding GST) | 25.5 | QTL | 7,926 | ₹2,02,113 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (Including all taxes, labour cess etc but excluding GST) | 26.1 | CUM | 5,415 | ₹1,41,331.5 |
| 10 | Brick work in super-structure above plinth level including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:6 cement & coarse sand). (Including all taxes, labour cess etc but excluding GST) | 37.63 | CUM | 6,692 | ₹2,51,819.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2231960.xls
BOQ • 0.27 MB
T1bhawan.pdf
Tender Documents • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .