Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-AOC HOUSE NO 8 589 BEHIND PHC HOSPITAL OLD BUS STAND KORBA KORBA CHHATTISGARH 495678 | 495678 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹29.8 L+₹3.2 L (12.0%)Rejected-AOC KOTHI NO 766 PHASE III MODEL TOWN BATHINDA PB | L2 | Rejected-AOC Other than L1 | |
| 3 | L3₹38.8 L+₹12.3 L (46.1%)Rejected-AOC H NO 18 SHEET NO 5 A KATIA COLONY NAMDEV MARG BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | L3 | Rejected-AOC Other than L1 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
29 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SH ASHOK KUMAR, EE, IDSE
GE NORTH BATHINDA Pin-151004
PERIODICAL SERVICES IN OTM ACCN OF ZONE M AREA AND AOR OF AGE B/R-V OF GE (N) BATHINDA MIL STN
2023_MES_604669_1
8938/NIT-20/23-24
Open Tender
Civil Works
Item Rate
270 days
BATHINDA
Class D category a(i)
8 documents required · 8 mandatory
₹500
GE NORTH BATHINDA
₹90,000
Yes
22 Aug 2023
21 Jun 2023
31 Jul 2023
21 Jun 2023
29 Jul 2023
17 Jul 2023
21 Jun 2023 - 28 Jun 2023
Amount
SCHEDULE 'A' B/R Works
Material and labour for Preparation of old decorated surfaces (plastered/unplastered) of walls/pillars /cornices by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean and to make the surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth upto entire satisfaction of Engineer-in-charge and after preparing the surface smooth applying one coat of lime white wash with using paint brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls / pillars / cornices by scraping down with using steel patti wire/ brush / sand papering or by any other mean, remove / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc brooming all dust including applying white cement based putty where required for filling to depressions/nail holes/light cracks etc and to make surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth (before and after applying putty as per site situation) upto entire satisfaction of Engineer-in-charge, and after preparing the surface smooth applying two coats of lime white wash with using paint brush, complete all as specified and as directed by Engineer-in-Charge. NOTE : - Complete removal /scraping to old existing treatment as directed by Engineer-in-charge, each stage i.e after complete removal and before applying white wash as specified above, the surface shall be passed in writing by the Enigineer-in-charge in site order book.
Material and labour for Preparation of old decorated surfaces (plastered/unplastered) of ceiling by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean and to make the surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth upto entire satisfaction of Engineer-in-charge and after preparing the surface smooth applying one coat of lime white wash with paint brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from ceiling surfaces by scraping down with using steel patti wire/ brush / sand papering or by any other mean, remove / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc brooming all dust including applying white cement based putty where required for filling to depressions/nail holes/light cracks etc and to make surface even and smooth, and after preparing the surface smooth applying two coats of lime white wash with using paint brush, complete all as specified and as directed by Engineer-in-Charge. NOTE : - Complete removal /scraping to old existing treatment as directed by Engineer-in-charge, each stage i.e after complete removal and before applying white wash as specified above, the surface shall be passed in writing by the Enigineer-in-charge in site order book.
Material and labour for preparation of old decorated surfaces (plastered/unplastered) of walls/pillars /cornices by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean, washing down with water and to make surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth upto entire satisfaction of Engineer-in-charge, and after preparing the surface smooth applying one coat of cement base paint with paint brush or roller brush, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls / pillars / cornices by scraping down with using steel patti wire/ brush / sand papering or by any other mean, remove / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc brooming all dust and washing down with water including applying white cement based putty where required for filling to depressions/nail holes/light cracks etc and to make surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth (before and after applying putty as per site situation) upto entire satisfaction of Engineer-in-charge, and after preparing the surface smooth applying two coats of cement base paint as per approved tint/colour with using paint brush/roller brush, complete all as specified and as directed by Engineer-in-Charge. NOTE : - Complete removal /scraping to old existing treatment as directed by Engineer-in-charge, each stage i.e after complete removal and before applying CBP as specified above, the surface shall be passed in writing by the Enigineer-in-charge in site order book.
Material and labour for preparation of old decorated surfaces (plastered/unplastered) of walls/pillars /cornices by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean, and apply 2mm thick one coat of wall care putty to make the surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth upto entire satisfaction of Engineer-in-charge, and after preparing the surface smooth applying one coat of oil bound distemper (washable) by using electric paint roller or with paint roller brush, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls/pillars/cornices by scraping down with using mechanical sander machine (including provision of dust sucking) upto entire satisfaction of Engineer-in-charge, brooming and washing down and preparing the surfaces smooth and after that applying 2mm thick wall care putty , after prepare the surface smooth applying two coats of oil bound distemper (washable) as per approved tint/colour by using paint brush or roller brush complete all as specified and as directed by Engineer-in-Charge. NOTE : - Each stage i.e after complete removal and before applying OBD as specified above, the surface shall be passed in writing by the Enigineer-in-charge.
Material and labour for preparation of old decorated surfaces (plastered/unplastered) of walls/pillars /cornices by removing / scraping down all loose particle, smoke soot, moulds, moss & efflorescent salts, oil & greasy spots etc with using broom / steel patti / wire brush / sand papering or by any other mean, and to make the surface even and smooth and also using sander machine (with provision of dust sucking) on uneven surface to make the surface even and smooth upto entire satisfaction of Engineer-in-charge, and after preparing the surface smooth and after that applying one coats of weather proof exterior emulsion paint (wheather coat Apex, 100% exterier grade) by using paint roller brush or electric paint spray machine, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls/pillars/cornices by scraping down with using mechanical sander machine (including provision of dust sucking) upto entire satisfaction of Engineer-in-charge, brooming and washing down and preparing the surfaces smooth and after that applying two coats of weather proof exterior emulsion paint (wheather coat Apex, 100% exterier grade) by using electric paint spray machine, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge. NOTE : - Complete removal /scraping to old existing treatment as directed by Engineer-in-charge, each stage i.e after complete removal and before applying weather coats as specified above, the surface shall be passed in writing by the Enigineer-in-charge.
Material and labour for complete removal of existing treatment (any layers of existing treatment ) from walls/pillars/cornices by scraping down with using mechanical sander machine (including provision of dust sucking) upto entire satisfaction of Engineer-in-charge, brooming and washing down and preparing the surfaces smooth and after that applying two coats of oil emulsion distemper (washable), by using paint brush and final with paint roller brush, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge. NOTE : - Complete removal /scraping to old existing treatment as directed by Engineer-in-charge, each stage i.e after complete removal and before applying weather coats as specified above, the surface shall be passed in writing by the Enigineer-in-charge.
Material and labour for preparation of old painted wooden surfaces of any description not otherwise described over 10cm width or girth by cleaning the dust and removing all loose particle with using clean cloths and dry paint brush & applying one coat of synthetic enamel paint (1st quality) of approved tint/colour to achieve glossing finish with using paint brush complete as specified and as directed by Engineer-in-Charge.
Material and labour for preparation of old painted steel surfaces of any description not otherwise described over 10cm width or girth by cleaning the dust and removing all loose particle with using sanded paper, clean cloths and dry paint brush & applying one coat of synthetic enamel paint (1st quality) of approved tint/colour to achieve glossing finish with using paint brush complete as specified and as directed by Engineer-in-Charge.
Material and labour for preparation of old polished wooden surfaces of any description not otherwise described over 10cm width or girth & applying two coats of french polishing to achieve glossing finish upto entire satisfaction, including a coat of wood filler complete as specified and as directed as per existing or as approved tint/colour complete as specified and as directed by Engineer-in-Charge.
Taking down cement or cement lime plaster from brick wall etc including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge.
Material and labour for rendering/plastering appx 10mm thick (matching with existing plaster thickness) in cement mortar (1:3) on any face of ceiling in patches matching with existing, finished fair and even and smooth without using extra cement, complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for preparing newly plastered or concrete surface of ceiling by sand papering or by any other mean and after preparing the surfaces applying three coats of white wash complete all as specified & directed by Engineer-in- charge
Material and labour for rendering/plastering appx 15mm thick (matching with existing plaster thickness) in cement mortar (1:6) on old brick or concrete surfaces of walls/pillars /cornices in patches matching with existing, finished even and smooth without using extra cement, complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for preparation of new plastered surfaces of walls/pillars /cornices by brooming down with using broom/sand papering or by any other means, and preparing the surfaces smooth by applying white cement based putty to make the surface even and smooth by using sander machine (with provision of dust sucking) upto entire satisfaction of Engineer-in-charge, and after preparing the surfaces applying two coats of oil emulsion distemper (washable), as approved tint/colour by using paint roller brush complete all as specified and as directed by Engineer-in-Charge.
Material and labour for rendering/plastering appx 15mm thick (matching with existing plaster thickness) in cement mortar (1:4) on old brick or concrete surfaces of walls/pillars /cornices in patches matching with existing, finished even and smooth without using extra cement, complete all as specified and as directed by the Engineer-in-Charge.
Material and labour for for preparation of new surfaces of walls/pillrs/cornices by using brooming /sand papering or by using sander machine (with provision of dust sucking ) upto entire satisafaction of Engr-in-Charge and applying 2 mm thick wall care putty including make the surface even and smooth by sand papering and applying two coats of weather proof exterior emulsion paint (wheather coat Apex, 100% exterier grade) over a coat of exterior emulsion primer by using electric paint spray machine, as per existing or as approved tint/colour complete all as specified and as directed by Engineer-in-Charge
Demolition of RCC as in roof slabs (other than ground floors), beams, stair case, landing, chajjas, and similar suspended work (reinforcement cut as required to facilitate demolition) all as specified and directed by Engr-in-Charge
M & L for RCC 1:2:4 Type B0 (12.5mm graded stone aggregates) as in slabs supported on walls, beams and columns in floors, roofs, landings, balconies, deck slabs and in shelves and the like. (Reinforcement will be measured and paid for separately)
M & L for RCC 1:2:4 Type B0 (12.5mm graded stone aggregates) as in fins, fascias, louvers, parapets, and railings exc. 60cm in height, balustrade, and the like. (Reinforcement will be measured and paid for separately)
Use and waste of form work to sides and soffits of floor or roof beams, roof slabs, cantilevers, shelves etc and similar items rough finished surface complete all as specified and directed by Engr-in-Charge
Use and waste of form work to sides and soffits of fins, louvers, fascia and similar items rough finished surface complete all as specified complete all as specified and directed by Engr-in-Charge
S & F mild steel TMT bars 10 mm dia , and over cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips quality conforming to Fe 410-W, Gde E-250 complete all as specified .
All as per ser item No.27 here-in-before but 6 to 8mm dia complete all as specified and directed by Engr-in-Charge.
All as per ser item No.27 here-in-before but 6 to 8mm dia in stirrups, spacess and binders complete all as specified.
M & L for guniting/ short crating of RCC columns, beams , fins, facias and similar items as per manufacturers instruction average thickness exc 25 mm but not exc 40 mm complete all as specified and directed by Engr-in-Charge.
M & L for guniting/ short crating of RCC columns, beams , fins, facias and similar items as per manufacturers instruction average thickness not exc 25 mm complete all as specified and directed by Engr-in-Charge.
M&L for rough cast plastering including 15 mm thick rendering in cement plaster 1 :4 complete as specified in SSR Part-I clause 14.22 as given .Note : Rough cast finish : After applying under coat of cement mortar 1:3 not less than 10 mm thick and while still it is in plastic state the rough cast mixture consisting of crushed stone or fine gravel agg. which is generally of size between 6 to 12 mm depending on texture required mixed with coarse sand and cement in the ratio 1:1 shall be applied complete including taking down cement lime plaster and applying two coats of cement based paint over a coat of primerall as specified and as directed by the Engineer-in-Charge.
M & L for removal of apparent visible efflorescence first cleaned using hard wire brush and all crystal deposits to be removed, the bricks shall then be cleaned using soft brush of powdery crystals then make a 1:4 solution of vinegar and water ( 1 part vinegar to 4 parts water) and apply it to the efflorescence affected area using a nylon brush. Allow the vinegar/ water solution to sit on the surface of the affected area for 15 minutes, but do not allow the solution to dry and rinse the area with clean water using low pressure jet, Two cycles of cleaning using vinegar water solutions shall be repeated.
M & L for pointing of cleaned joints of bricks work with cement putty made at site using latex / SBR polymer diluted at ratio (1:4) with water. The solution so made shall be used to be mixed with cement to make a putty consistency paste and the cement puttty shall be then worked out in the joints which are clean and in SSD condition complete all as per manufactures instructions.
M & L for clearing of dust and deposte from pointed brick work by using brush. A undiluted single component acrylic polymer shall be used to prime the brick surface and the primer while being tacky the first coat of water proofing coating is done, second coat is applied after a time interval of 4 to 6 hrs after the first coat has dried, the water proofing coating shall be two component polymer modified cementatious coating having a thickness of 1.5mm in two coats. Note : (i) The material to be factory batched and ready to use. (ii) The two components shall be mixed using low speed drill having a RPM 350 to 450 and fitted with a paddle. (iii) The mixing to be done for 3 to 4 minutes to give a brushable consistency mix. (iv) The coating shall be done using 100 to 150 mm wide brush. (v) Care should be taken that the material while being used a agitated every 3 to 5 min to avoid powder part getting settled. (vi) The water proofing coating shall have below properties tensile strength of 4.56 N/mm2 at after 14 days exposure ( according to ASTM D 2370) bond strength 2.0 N/mm2 at+ 27 degree celcius (failure in substrate). (vii) After application of second coat and while the material is still wet, coarse sand is sprinkled over the coating so as to ensure proper mechanical key is provided for subsequent plaster.
M & L for 15 mm thick plastering in CM (1:4) with acrylic polymer on treated surface of brick work work with acrylic polymer @ 3% by weight of cement complete all as specified.
Hacking out old broken glass from metal frame of any thickness incl punching or drilling out old glazing pins/springs clips and providing and fixing new ones with oil putty all as specified and directed
supply only sheet glass 3.00 mm thick ordinary quality ,fixing with oil putty to wooden or steel surface n.exc 0.5 sqm each complete all as specified and directed
S&F figured glass pin head type and glazingwith oil putty in square n.exc 0.5 sqm in each pane of 3 mm thick complete all as specified
Supply & fixing in replacement 110mm bore PVC (SWR) pipes single socketed in any length with rubber ring joints for drain or rain water fixed along walls with stack clamps made out of FI 50x5mm and 16mm dia round iron stay (interval of 1m) including nut bolt and PCC work, including dismantling/taking down old pipe complete all as specified and as directed by Engineer-in- charge.
Supply & fixing PVC (SWR) bends (any radius) suitable for 110mm bore pipe fixed to walls or laid in floor complete all as specified and as directed by Engineer-in- charge.
M/S KARTIK BUILDERS
V K CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .