Loading…
Loading…
Tender Value
₹95.7 L
EMD Value
₹1.9 L
Closing Date
15 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited\ Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: 1.Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or 2.Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or 3.One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Definition of Similar Work(s) mentioned under Standard Technical Criteria: "Execution of any 1500 V DC or 25 kV AC OHE work"
2 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer firm should have valid Electrical Contractors License granted by the Government in their own name or in the name of the firm". Tenderers should submit the copy of these certificates along with the tender document failing which the offer will liable to be rejected.
TRD work in connection with provision of stabling line at Rajendra nagar station under Simhastha 2028
EL-TRD-58-2026-27-07
EL-TRD-58-2026-27-07
Open
Works - General
18 Months
Ratlam, Madhya Pradesh
₹0
₹1.9 L
15 Jun 2026
20 May 2026
1 Jun 2026
73 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 95,73,913.5 | ||
| — | 4.00 | — | — | ||
| Preparation of designs and drawings for overhead equipment viz.-sectioning cum wiring diagram, power supply diagram, Traction working rule diagram and instructions etc .required for commissioning of OHE including approval from Consultant, Client & Railway. | — | — | — | 66,840 | |
| — | Breakup | for details. | — | ||
| Supply and erection of all types of galvanized steel structures with SPS. | — | — | — | 43,64,280 | |
| — | 250.00 | — | — | ||
| Casting of foundation in all types of soil. | — | — | — | 17,21,500 | |
| — | Breakup | for details. | — | ||
| Supply and erection of Cantilever assly. | — | — | — | 7,73,100 | |
| — | Breakup | for details. | — | ||
| Supply and erection of overhead equipment with fitting & acessories as per explanatory note. | — | — | — | 4,59,784 | |
| — | Breakup | for details. | — | ||
| Supply and erection of a regulating equipment (3 pulley type) with counter weight assembly for Conventional OHE | — | — | — | 1,12,966 | |
| — | Breakup | for details. | — | ||
| Supply & Erection of FTA assly. | — | — | — | 31,340 | |
| — | Breakup | for details. | — | ||
| Supply and erection of guy rod assembly. | — | — | — | 72,198 | |
| — | Breakup | for details. | — | ||
| Supply and erection of copper jumpers. | — | — | — | 1,57,170 | |
| — | Breakup | for details. | — | ||
| Supply and erection of section insulator assembly with core insulator suitable for Polluted zones and associated fittings & fasteners for conventional OHE including 9 tonne insulator assembly | — | — | — | 65,666 | |
| — | Breakup | for details. | — | ||
| Supply and erection of a 25KV single pole isolator with earth contact assembly with post & Rod insulators. | — | — | — | 71,166 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of all type of galvanized bonds (str./cross/long./special etc.) | — | — | — | 3,76,000 | |
| — | Breakup | for details. | — | ||
| Supply and erection of all types of danger/caution boards | — | — | — | 17,260 | |
| — | Breakup | for details. | — | ||
| Supply & Erection of retro reflective number plates for mast. | — | — | — | 21,120 | |
| — | 10.00 | — | — | ||
| Transfer of equipment from one mast or support to another and adjustment ofdroppers | — | — | — | 52,300 | |
| — | Breakup | for details. | — | ||
| Supply and erection of Solid Core Cut-in insulator (9 ton insulator) | — | — | — | 1,13,570 | |
| — | Breakup | for details. | — | ||
| Supply and Erection of Earthing station | — | — | — | 26,552 | |
| — | 20.00 | — | — | ||
| Dismantling of a cantilever assembly with insulators. | — | — | — | 32,440 | |
| — | 2.00 | — | — | ||
| Provision of Splicing and extension of an anchored overhead equipment | — | — | — | 58,680 | |
| — | 20.00 | — | — | ||
| Breaking of concrete foundation of Masts, portals & TTC. | — | — | — | 55,620 | |
| — | 3.00 | — | — | ||
| Providing (Supply and Erection) of sectioning diagram board at station. | — | — | — | 31,923 | |
| — | 2.00 | — | — | ||
| Provision of False Catenary under Bridge (Contact Wire supplied by Railway) | — | — | — | 49,440 | |
| — | 8.00 | — | — | ||
| Dismantling of mast, portal, TTC &other small part steel | — | — | — | 73,576 | |
| — | 5.00 | — | — | ||
| Dismantling and removal of guy rod assembly | — | — | — | 7,105 | |
| — | 1.00 | — | — | ||
| Dismantling of Regulating equipment with Counter Weight Assembely | — | — | — | 7,590 | |
| — | 2.00 | — | — | ||
| Dismantling & removal of termination assembly | — | — | — | 12,086 | |
| — | 1.00 | — | — | ||
| Dismantling & removal of existing anti-creep assemblies | — | — | — | 1,807 | |
| — | 0.50 | — | — | ||
| Dismantling & removal of OHE complete with cantilever, droppers, contact & catenary wire etc. | — | — | — | 20,888.5 | |
| — | 1000.00 | — | — | ||
| Erection of 150 sqmm copper feeder wire | — | — | — | 37,000 | |
| — | 1000.00 | — | — | ||
| Dismanteling of 150 sqmm copper feeder wire | — | — | — | 37,000 | |
| — | Breakup | for details. | — | ||
| Supply & erection of 25KV Post insulator | — | — | — | 57,720 | |
| — | Breakup | for details. | — | ||
| Supply & erection of 9-Tonne/suspension Insulator . | — | — | — | 1,55,060 | |
| — | 50.00 | — | — | ||
| Painting & marking of implantation, emergency phone socket direction, rail level, Km's, number of Structures, OHE height and ATD's temperature marking on ATD structures | — | — | — | 5,500 | |
| — | Breakup | for details. | — | ||
| Supply & erection of material of Termination for Copper feeder wire (150 sqmm) including 9-T insulator | — | — | — | 44,816 | |
| — | Breakup | for details. | — | ||
| Supply and erection of large span wire | — | — | — | 3,81,900 | |
| — | 50.00 | — | — | ||
| Supply of Packing Saddle (1174) as per SPEC:TI/SPC/OHE/FITTINGS/0130-10/13-Rev-1, DRW: RE 33 P 1174 | — | — | — | 950 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril2022.pdf
ATTACHMENT
GCCACS1to11_compressed.pdf
ATTACHMENT
RJQSimTenderdoc_compressed.pdf Tender doc
ATTACHMENT
RJQSimTenderdoc_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .