Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹16,967
Closing Date
6 Oct 2026, 4:00 pm
Directorate of Municipal Administration
RIYAZ AHMED I HUBBALLI
Construction of Bus stand at Sattur Basaveswar Circle near Araval Office w no.26
DMA/2025-26/OW/WORK_INDENT56203/CALL-4
DMA/2025-26/OW/WORK_INDENT56203/CALL-4
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
8 documents required · 8 mandatory
₹500
₹16,967
17 Sept 2026
17 Sept 2026
25 Sept 2026
Construction of Bus stand at Sattur Basaveswar Circle near Araval Office w no.26
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS ...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ...
Providing and laying in position ReinforcedCement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1cement : 6 coarse sand) including cost of all materials, labour,...
Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removi...
Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mor...
Flooring with 25mm thick polished shahabad slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with p...
Providing and laying flooring and steps fine dressed granite stone slabs 40 mm thick on cement mortar bed 1:6, 25 mm thick, and pointed with cement mortar 1:3 over existing cement concrete bed , inclu...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openi...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Footing (All other types) 3% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Columns 70% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No-9)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Plinth Beam 50% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No-2)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Lintel + beam (RCC Beams, Lintels & Troughs of Aqueducts) 60% Percentage on finished rate of concrete per m3 SR...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete for Slab 50% Percentage on finished rate of concrete per m3 SR 2023-24 P.No.111(Volume-1)(SL No-15)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after th...
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, ...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work(PWD SR 2023-24 Vol.3 Page no.15 Item no 3.1)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
56203 kw-1.doc
Tender Document • 4.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .