Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L-1 | Accepted-AOC Lowest acceptable Tender. |
| 2 | L-2₹2.9 Cr+₹48.2 L (19.6%)Rejected-Finance | ₹2.9 Cr+₹48.2 L (19.6%) | L-2 | Rejected-Finance Not being lowest bid. |
| 3 | L-3₹3.0 Cr+₹56.6 L (23.0%)Rejected-Finance | ₹3.0 Cr+₹56.6 L (23.0%) | L-3 | Rejected-Finance Not being lowest bid. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified in Technical (Cover-I) evaluation. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not qualified in Technical (Cover-I) evaluation. |
Tender Value
₹2.8 Cr
EMD Value
₹3.5 L
Closing Date
21 Feb 2023, 5:00 pmClosed
General Manager(Civil)Welfare-CSR, WCL HQ.
Office of G.M.(Civil)Welfare-CSR, WCL HQ, Coal Estate, Civil Lines, Nagpur-440001 (M.S.)
Supply,Installation,Testing and Commissioning of Auto Fire Protection cum Fire FightingSystem,including Smoke detection and Fire Alarm System,Maintenance and Guarantee of entire system for5years,including Surveying,Planning,Designing etc.as per NIT.
2023_WCL_268467_1
wcl-hq-gmciv-e08-2022-23/146 dated 18.01.2023
Turnkey
Civil Works - Others
Item Rate
365 days
Western Coalfields Ltd., Coal Estate
AS PER NIT.
7 documents required · 7 mandatory
₹3.5 L
Office of G.M.(Civil)Welfare-CSR, WCL HQ.
12 Jul 2023
23 Jan 2023
23 Feb 2023
24 Jan 2023
21 Feb 2023
6 Feb 2023
24 Jan 2023 - 13 Feb 2023
1 Feb 2023
Amount
Surveying, Planning, designing, drawing, and execution with Supervision and Quality Control including getting all the statutory approvals/NOC from the concerned departments for the work of “Supply, Installation, Testing and Commissioning of Auto Fire Protection cum Fire Fighting System, including Smoke detection and Fire Alarm System, Maintenance and Guarantee of entire system for 5 years” for Administrative Building including HRD, Post Office and Bank building, D.G. room of WCL HQ etc., all complete job all as per scope of work, specifications and terms and conditions of the tender document on TURN-KEY basis. (Note: The bidder is required to quote Lump-Sum cost excluding GST for this Item).
Total impact of GST for the purpose of CTC
AMEYA AGENCIES
SR ASSOCIATES
AMEYA AGENCIES
SR ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .