Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAccepted-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹37.1 L+₹4.2 L (12.6%)Rejected-Finance COLABA MUMBAI | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹37.9 L+₹5.0 L (15.1%)Rejected-Finance | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹39.5 L+₹6.5 L (19.9%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹39.7 L+₹6.8 L (20.6%)Rejected-Finance COLABA MUMBAI | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
13 Sept 2024, 5:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
CARRYING OUT REPAIR AND ROUTINE MAINTENANCE AND MANUAL OPERATION OF LIFTS AT NEW SAILOR BLOCK AT INS SHIKRA BOOT POOL AND REVIERA BLDG AT OUTLYAING AREA UNDER GE (NW) NOFRA, COLABA, MUMBAI
2024_MES_667428_1
8780/CWE(NW)MUMBAI/E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) NOFRA
Class D
Category c (ii)
8 documents required · 8 mandatory
₹500
GE (NW) NOFRA
₹70,000
18 Nov 2024
23 Jul 2024
16 Sept 2024
23 Jul 2024
13 Sept 2024
6 Aug 2024
23 Jul 2024 - 5 Aug 2024
Amount
Repairs & Routine maintenance of lifts including carrying out daily check and periodical services of fully automatic electrically operated lifts (Existing Make OTIS) 08 Passenger capacity having daul power operated door, automatic levelling device and microprocessor based simplex collective control system with repair and replacements of unserviceable parts such as bearings,brushes all types of shoes, headers, hangers, door cards,door locks, control cards, door ropes, connector/ links, hall push buttons and its spares covers, rewinding of motors, welding of cracked/ broken parts repair replacement of door safety edge working at any principal and any type sensor or mechanical safety lock magnetic lock or car position indicator, door sill, car door sill,shaft wiring cables, cabin light, cabin fan, repairs, greasing /lubricating of parts/gear box , dewatering form the car pit , soundless and jerk free operation/fixed of brocken granite cladding with edge chamfered / rounded match with exisitng with cement by mortar 1:4 complete including complete etc including necessary wiring and cables as per requirement for safe operation of lifts complete to ensure safety and smooth operation of lifts at Boat pool (G+3) (01 lift) complete all as specified and directed by Engineer-in-Charge. Note : - Location :- Boat Pool lift (2000 Kg) G+03 i.e 04 floors). NOTE : All necessary arrangemenbt /spare parts required for smooth operation of lifts including in the quoted rate and except the parts measured and paid separatrely.
All as per item No 1 herein before but for 04 passengers with Collapsible door to serve G+05 floors (i.e. 06 floors) installed at Reveira Bldg (Total 02 lifts).
All as per item No 1 herein before but for 08 passengers (Existing make -OTIS) with having daul power operated door, automatic leveling deice to serve G+07 floors (i.e. 08 floors) installed at NEW OTM Shikra (Total 02 lifts). Note For item No 1 , 2 & 3 Cost of spare parts / material required for above mentioned maintenance is deemed to be included in the quoted rate. No additional cost of spares is admissible for the above maintenance complete all as specified and directed by Engineer-in-Charge. (ii) for ser no 1,2&3 One mechanic Must be available round the clock (in three shift wise) at lift complaint cell for safe & smooth functioning of the lift to carry - out rescue operation as directed by Engr -in-Charge.
Dismantling and taking out ARD control system and commissioning and testing of new ARD system inculdind PC cards/didoes out put DC to AC supply for card door drive 230 Volt and Main motor AC supply 415 Volt working on 12 Volt 18 AH battery suitable for upto 15 HP motor and power rating 11KW/15 HP including wiring all necessary arrangement with fiting and fixtures etc connected item in existing building complete all as specified and directed.
Dismantling and taking out ARD control system and commissioning and testing of new ARD system including PC cards/ diodes suitable for upto 10 HP motor including wiring with connected item in existing building complete all as specified and directed.
Dismantling and taking out all defective batteries from existing ARD and supply and fixing new maintenance free batteries suitable for ARD including necessary connection like battery terminals of brass and copper lead heavy duly to connect the batteries terminal of 12 VDC, 18 AH (one set of 04 nos batteries for each ARD).
Supply and fixing main pully as per existing dia complete and suitable for passenger/ goods lift all as specified and directed by Engr in Charge.
Dismantling and taking out unserviceable control panel and control wiring and panel suitable for bldg ( G+7) supply and fix new control panel in hinged MS powder coated cabinet, with control wiring comprising with multiple microcontrolled programmed chip based, controlled by pulse modulation, complete with all safety devices such as thermal overload protection, over current protection, auto phase link to each other in network, and compatible to existing capacity VVVF drive confirming to IS 14665 , 3 phase supply, 415 volts, and motor capcity upto 15 HP complete including proper connection with proper lugs, terminal connectors screws and motor connection with galvanised sheet trucking 24 SWG including wiring of main motor with suitable size of stranded copper cable etc and panel suitable for bldg ( G+7) complete all as specified and directed by Engineer-in-Charge.
Disconnecting and taking out defective shaft wiring and providing new shaft wiring in hoist way up to lower limit switch with PVC insulated 16/18 core flat/round type standard copper conductor cable size 1.00 Sqmm 1100 volts grade with ISI Marked and 0.75 Sqmm single core for earthing drawing through in and including galvnised sheet metel (24 SWG) trunking upto ground floor in hoist way for control of all floor hall push button assembly ,limit switch, Firemenswitch etc, complete all as specified.
Taking down old unserviceable main steel wire rope after disconnecting old wire rope from counter weight, pulley and car cabin and supply and fix new main steel wire rope 13 mm dia, ungalvanised, 13/19 construction in and including necessary connection with counter weight, pulley and car cabin with clamps, nut, bolts and washers etc complete all as directed by Engineer-in-Charge.
Taking down old unserviceable main steel wire rope after disconnecting old wire rope from counter weight, pulley and car cabin and supply and fix new main steel wire rope 08 mm dia, ungalvanised, 08/19 construction in and including necessary connection with counter weight, pulley and car cabin with clamps, nut, bolts and washers etc complete all as directed by Engineer-in-Charge.
Overhauling of machine by replacing defective bushes, bearing, Oil seal, packings as & where required and filling fresh gear oil for lift complete all as specified and directed.
Dismantling and taking out unserviceable travelling cable from hoistway & supply and fixing new travelling cable PVC insulated 12 Core flate round type with stranded copper conductor, 1100 volt grade with ISI Marked and 0.75 sqmm confirming to relevant IS in and including thimbles, suspended type freely moved with car cabin up and down movement between ground and upper floors uncluding necessary proper connection with mid way junction and other connection required in circuit complete all as specified and directed.
Disconnecting and taking out old defective infra red door sensor of any make and supply and fix new infra red door sensor up to full length of car door complete all as specified and directed by Engineer-in-Charge,
Supply & fix aluminium covered wire wound dynamic breaking resister to absorb the reserve energy dissipation of motor during regeneration in control operation suitable for existing capacity complete all as specified and directed by Engineer-in-Charge,
Material and labour for 20 mm thick mirror polished black granite slab, machine cut, mirror polished set on vertical surfaces 300 mm width allround with lift facial elevation including back casting CM (1:3) 15 mm thick and joint filling with white cement with pigment to match with shade of granite for lift archive at all floors as specified and directed by Engr-in-charge.
Taking out old unserviceable cabin fan from car cabin, supply and fix new cabin fan non osciliating type axial flow, single speed 300mm sweep, 230 Volts, ISI mark with stainless steel grill. complete all as specified and directed by Engineer- in - Charge
Supply and fixing in replacement rope over load relay sensor from ropes suitable for upto 13 passenger capacity lift complete all as specified and directed by Engineer-in-Charge. Make :-As per OEM recommendation as per design of existing installed lifts
Disconnecting and taking out defective u/s main drive (any type) from existing control panel and supply and fixing new main drive VVVF drive confirming to IS 14665 with all electric connection complete all as specified and directed by Engineer-in-Charge.
Dismantling and taking out unserviceable car door drive V3F as per exisiting size etc complete all as specified and directed by Engineer-in-Charge.
Material and labour for drain out the wate rby mono block submersible motor / manually from the lift cabin pit and cleaning complete all as specified and as directed.
Disconnecting and takingout unservicable emergency alarm system Complete supply & fix new emergency alarm /Hooter system having audible rang more than 0.1 km assembly on ground floor landing complete with PCB card battery backup battery charging unit and speaker including necessary control/electric connection wiring with COP and control panel complete all as specified and directed by Engineer-in-Charge
Taking down unserviceable/ burnt lift motor from the lift machine room and Rewinding of electrical motor 15HP capacity 3 phase 415 V , including rewinding of the motor by proper gauge of copper wire with class E insulation with Varnishing, heating and re-assembling and testing at the site all as specified and directed by Engineer-in-Charge .
Material and labour for Earthing complete with galvanized steel earth electrode 600x600x6mm thick burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below normal ground level connected to galvanized earth strip 32 x 6 mm by means of bolts, nuts & washers of galvanized iron or steel up to the test point all as shown in electrical plate No.3 of SSR Part-I connected to lifts including PCC chamber pit, CI cover, GI funnel with wire mesh, GI protection pipe of 50 mm dia for earth lead and 20mm GI pipe for watering , excavation and earth work in any type of soil, filling the pit with charcol and common salt surrounding the earth plate complete including connecting up to machine drive motor and control panel and testing on completion all as specified and directed by Engr-in-Charge.
Taking down old damaged Chequered plate supplying & fixing new aluminium Chequered plate of thickness of 5mm including removing existing plates complete all as specified and directed by Engineer-in-Charge,
Dismantling and taking out old unserviceable buffer spring and supplying & fixing new buffer spring complete all as specified and directed by Engr in Charge.
Supply and lay aluminium strip of size 25x3 mm from test point to lift machine room (G+07 bldg) to be terminated to the control panel, machine and other equipment installed in machine room complete all as specified and directed by Engineer- in- charge
Disconnecting and taking out unserviceable landing push button and S&F landing push button complete new with LED indicator and button for operation suitable for serial communication system all as specified and directed by Engr in Charge,
Disconnecting & taking out defective COP assembly, supply and fix new COP assembly for 08/13 ps lifts illuminated push button for floor position indicator, alarm, non stop, door close, door open, cabin light, stop attendant out key etc including direction indicator of 7 segment display with CPI card on stainless steel face plate duly connected with existing control and electric system complete all as specified and directed.
Supply and fixing in replacement speed governer set with top and bottom pully with all accessoried suitable for 8/13 ps lift complete all as specified and directed by Engr in Charge.
Mannual operation of electrically operated lifts fully automatic capacity 08 passengers lifts of any capacity to serve any Nos of floor daily in one shift as directed Engr-in-Charge including Sundays & holidays (reliever shall be provided to the attendent by the contractor on sundays and holidays) including taking care from any pilferage, theft or damage of lifts etc complete all as directed for the following buildings:- (a) Reviera Bldg - 02 Lift (Md Accn) - 01 No. Lift Operator (Semi- Skilled)
Note : For item No 31.00 (ii) Passes will be processed after verification of certificate, Pass shall not be granted without submission of qualification proof & experience certificate for lift operator. In case of OEM, the qualification mentioned in note is not applicable which shall be verified by Engineer-in-Charge before issue of passes. (iii) Contractor shall submit ID proof, Residential proof, Bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as Operators. (iv) Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. The contractor shall submit proof to Engineer-in-Charge before claiming any payment. (v) Lift operators report at lift cell as per the shift timings specified in the tender and he will report to JE E/M in-Charge or Lift Cell in-Charge. In case of emergency he will function according to their direction. If he is found absent or move without intimating to in-Charge of Lift Cell or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall be affected. (vi) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (vii) In case of malfunctioning if any noticed, lift operator shall intimate to the lift cell. (viii) In case of any necessity for rescue operation or in emergency situations, lift operator shall be capable of rescue the passenger and reacting to the situation (in emergency situations) Rescue operator engaged for rescue operation shall immediate attend the complaint within 30 minutes failing which penalty at Rs 500/- per hour or part thereof shall be levied.
(ix) Contractor shall submit the labour licenece as applicable as per latest laws/acts & Copy of GST Regn registered number issued by concerned authority. (x) Insurance coverage, compensation if any applicable or necessitated due to mis operation of lift shall be the responsibility of contractor. The quantum of compensation shall be assessed based on the BOO composing of Lift Inspector of Maharashtra State, representatives of both agencies carrying out M&O works and routine maintenance work of lift and members from department. (xi) Contractor has to submit proof of payment of EPF subscription made by him as applicable as per latest laws/acts alongwith RAR failing which RAR will not be progressed for payment. (xii) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (xiii) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost as given Page No 14 of Sch of Notes, the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid
(xiv). The deposited amount shall be the difference between estimated cost as given Page No 14 of Sch of Notes and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to withhold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. (xv) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working
Monarch Enterprises (BID ID -3091588)
Shree Elevator Engineering Co. (BID ID -3090061)
Escon Elevators Pvt Ltd (BID ID -3089486)
Veer High Tech Solution (BID ID -3088190)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .