| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr Quoted ₹2.6 Cr | L1 | Accepted-AOC Lowest Tender |
| 2 | L2₹2.7 CrRejected-AOC | ₹2.7 Cr | L2 | Rejected-AOC Second Lowest Tender |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tender not found in order |
| Sl No | Description | Qty | Unit | Abbundu Interiors & Construction L2 | N.S.PERIASAMY AND CO L3 | MEET CONSTRUCTION PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 572 | Cu.m | 417 ₹2.4 L | 426 ₹2.4 L | 388 ₹2.2 L |
| 2.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 55 | Cu.m | 184 ₹10,120 | 188 ₹10,340 | 171 ₹9,405 |
| 3.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 131 | Cu.m | 828 ₹1.1 L | 847 ₹1.1 L | 771 ₹1.0 L |
| 4.00 | Supplying and filling in foundation and basement with M-Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 56 | Cu.m | 1,988 ₹1.1 L | 2,034 ₹1.1 L | 1,852 ₹1.0 L |
| 5.00 | Plain cement concrete 1:5:10 (one of cement, five of sand and ten of aggregate) using 40mm gauge hard broken granite stone jelly for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated and curing etc., complete complying with standard specification and as directed by the departmental officers.- Mixing by manual means | 60 | Cu.m | 6,238 ₹3.7 L | 6,381 ₹3.8 L | 6,267 ₹3.8 L |
| 6.00 | Supplying and fixing Shade Net (Green Net) for under construction of high rise building etc. complete. | 700 | Sq.m | 74 ₹51,800 | 76 ₹53,200 | 69 ₹48,300 |
| 7.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals,plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 161 | Sq.m | 829 ₹1.3 L | 848 ₹1.4 L | 833 ₹1.3 L |
| 8.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). (Data as per New Data book Volume 1 - Sl.No.144) | 566 | Sq.m | 1,291 ₹7.3 L | 1,320 ₹7.5 L | 1,297 ₹7.3 L |
| 9.00 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 726 | Sq.m | 1,109 ₹8.1 L | 1,134 ₹8.2 L | 1,114 ₹8.1 L |
| 10.00 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 328 | Sq.m | 650 ₹2.1 L | 665 ₹2.2 L | 606 ₹2.0 L |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
16 Oct 2025, 3:00 pmClosed
The Superintending Engineer, PWD.,
O/o. The Superintending Engineer, PWD., Buildings (C and M) Circle-1, Chepauk, Chennai-5
Construction of New RMO Quarters at the King Institute of Preventive Medicine and Research, Guindy, Chennai-32
2025_PWD_612960_1
PWD/BCMC1/51-3/2025-26
Open Tender
Civil Works
210 days
Guindy
Refer Tender Condition
7 documents required · 7 mandatory
₹0
₹1.3 L
7 Mar 2026
11 Oct 2025
16 Oct 2025
11 Oct 2025
16 Oct 2025
11 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_732430.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid