Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -11.00% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹28,534.49 (11.1%)Admitted-Finance | -1.10% | ₹2.9 L+₹28,534.49 (11.1%) | L2 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,760
Closing Date
10 Aug 2026, 6:00 pmClosed
EE PWD Dn. BHIM
BHIM
Construction of Toilet in Govt PS Barwalo ka kheda at Madaria (MLA LAD)
2026_CEPWD_582649_1
NIT 05/2026-27 EE PWD Division Bhim
Open Tender
Civil Works
Percentage
90 days
BHIM
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Through Chalan
₹5,760
Yes
14 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
10 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 1 | Cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | Cum | - | - |
| 4 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 1 | Cum | - | - |
| 5 | Random rubble dry stone Kharanja under floor. | 1 | Cum | - | - |
| 6 | Providing and laying damp-proof course with cement concrete grade M-150 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification .75mm thick. | - | Sqm | - | - |
| 7 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | - | Cum | - | - |
| 8 | Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75.Cement mortar 1 : 4 (1 cement : 4 coarse sand) | - | Sqm | - | - |
| 9 | Stone slab roofing on ground floor with fine grained stone slab from approved quarry including filling of joints of parapet and slab on both sides in cement sand mortar 1:4, with ceiling pointing in cement sand mortar 1 : 3 complete as per specification and instruction of Engineer In Charge | 1 | Sqm | - | - |
| 10 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :20mm thick. | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.51 MB
Tendernotice_2.pdf
PDF • 26.97 MB
Annexure_B.pdf
Tender Documents • 0.15 MB
BOQ_1035143.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .