THE BLOCK DEVELOPMENT OFFICER BP
THE BLOCK DEVELOPMENT OFFICER (B.P), UTHUKULI UTHUKULI PANCHAYAT UNION, UTHUKULI R.S., TIRUPPUR DISTRICT
Strengthening the road From NH 47 to Palanigoundenpalayam H O Chengapalli Panchayat
2024_RDTN_427929_1
TNRD_TPR_UKL_PUGF_CHEN_01
Open Tender
Civil Works - Roads
Item Rate
270 days
UTHUKULI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,000
28 Feb 2024
20 Feb 2024
26 Feb 2024
20 Feb 2024
26 Feb 2024
20 Feb 2024
Amount
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Picking the existing worn out BT surface including cost and conveyance and all other labour charges etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen 60/70 for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen 60/70 per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges etc., complete
Provision for KM stone and HM stone
Provision for Name board.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R Rajeshwaran
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .