| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical ELAHI BAKSH COLONY KOKAR RANCHI | RANCHI | JHARKHAND | 829205 | Admitted-Fee/PreQual/Technical |
Tender Value
₹22.2 L
EMD Value
₹44,400
Closing Date
21 Sept 2026, 5:00 pmClosed
EE, RMC
RMC, RANCHI
Construction of RCC drain in Maulana Azad Colony from Nagma house to Parwez house under ward No-12
2026_UDD_118558_3
328/ENG 2026
Open Tender
Civil Works
Works
90 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹44,400
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Labour for site clearence before and after the work etc. | 5 | Nos. | 326.85 | ₹1,634.25 |
| 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | 202 | m3 | 151.82 | ₹30,667.64 |
| 3 | Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve at Quary | 15.93 | m3 | 347.85 | ₹5,541.25 |
| 4 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 26.76 | m3 | 1,756.4 | ₹47,001.26 |
| 5 | Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | 74.34 | m3 | 6,082.45 | ₹4,52,169.33 |
| 6 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | 31.86 | m3 | 6,308.87 | ₹2,01,000.6 |
| 7 | Providing Tor steel reinforcement of 8mm & 10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending, and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
8mm diameter bars | 4.13 | MT | 83,314.02 | ₹3,44,086.9 |
| 8 | 10mm diameter bars | 6.19 | MT | 82,096.54 | ₹5,08,177.58 |
| 9 | Supplying .fitting and fixing MS Grill Made with M.S Grills made of 20 x 6 mm M.S Flats or 16 mm M.S Square bars fitted on 25 x25x6 mm M.S Angle frame-do-(when steel steel is not supplied department) | 315 | KG | 118.98 | ₹37,478.7 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_160354.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .