Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -4.33% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 L+₹6,792.49 (2.44%)Admitted-Fee/PreQual/Technical/Finance | -2.00% | ₹2.9 L+₹6,792.49 (2.44%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
1 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_322234_12
2nd Call e-NIT No. 129 REW UDHAMPUR of 2026-27 Dated 24-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹5,820
2 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earth work in trenches excavation by mechanically means | 8.44 | Cum | 844.77 | ₹7,129.86 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 30.2 | cum | 5,733.6 | ₹1,73,154.72 |
| 4 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 64.99 | Sqm | 286.35 | ₹18,609.89 |
| 5 | Excavating, supplying and filling of local earth (including royalty)by mechanical
transport upto a lead of 5 km also including ramming and watering of the earth in
layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 16.99 | cum | 276.6 | ₹4,699.43 |
| 6 | Providing and laying non-pressure of specified class R.C.C. pipes
including collars/spigot jointed with stiff mixture of cement mortar in the
proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.
complete. | 14.4 | rmt | 3,951.65 | ₹56,903.76 |
| 7 | Carriage of sand | 13.79 | Cum | 985.5 | ₹13,590.04 |
| 8 | Carriage of Bajri | 27.58 | Cum | 523.4 | ₹14,435.37 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1078887.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .