Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20 LAccepted-AOC | ₹20 L Quoted ₹3,792.60 | 1 | Accepted-AOC Rate Contract for Loading Unloading and Handling of Materials at Central Stores DEDC Dharmapuri in respect of Chief stores officer Central stores Adhiyamankottai DEDC Dharmapuri Contract awarded |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
21 Jun 2023, 2:00 pmClosed
The Superintending Engineer TANGEDCO DEDC Dharmapu
Office of the Superintending Engineer DharmapuriElectricity Distribution Circle TNEB Building Salem Main Road Dharmapuri 636705
Rate Contract for Loading Unloading and Handling of Materials at Central Stores Dharmapuri in respect of Chief Stores Officers Central Stores Adhiyamankottai DEDC Dharmapuri
2023_EB_323567_1
ET/13/2023-24
Open Tender
Electrical Works
Works
The Superintending Engineer TANGEDCO DEDC Dharmapu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
23 Aug 2023
6 Jun 2023
22 Jun 2023
6 Jun 2023
21 Jun 2023
6 Jun 2023
Amount
Loading /Unloading of Distribution Transformers from Lorry to the Stores yard and stacking various capacities upto 100KVA
Loading /Unloading of Distribution Transformers from Lorry to the Stores yard and stacking various capacities above 100KVA and upto 500KVA
Loading /Unloading of Metering Sets of all ratios from Lorry to the Stores Yard and Stacking
Loading/Unloading of REC, RCC, PSC poles various sizes of above 8.00 m length
Loading/Unloading of REC, RCC, PSC poles various sizes of upto 8.00 m length
Loading/Unloading of Metal poles of all sizes
loading of Conductor drum from Lorry, leading and stracking yard
Unloading of Conductor drum from Lorry, leading and stracking yard
Loading/Unloading of Iron & Steel Materials
Loading/Unloading & Stacking of Oil drums with Oil
Loading/Unloading of Line Materials ( Structure Materials, X-Arm, Stay Set, G.I Wire, Stay Wire, Earth Pipe, Bolt&Nut, G.I Pin )
Loading/Unloading of Crates with 11/22/33 KV Disc verifying and stacking
Loading/Unloading of L.T Pin Insulators, Guy Shackle, L.T Shackle, LT Pin, Metal parts, Ht pin etc.
Loading/Unloading of 1phase Meters
Loading/Unloading of 3phase Meters
Scrap Material weighing for stock verification
Scarp Material Stacking after stock verification
Transformer shifting from testing yard to stores stacking yard (after testing by Special Maintenance)
Transformer shifiting from Store stacking yard to testing yard (for testing new DT)
E.S.I. @3.25 % should be Entered by the Bidder
EPF 13 % for labour charges
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .